Significant Expansion of the Arkun Project
Released
Released
Announcement PDF
ASX Code: IPT
MARCH 14th 2024
CORPORATE RELEASE
SIGNIFICANT EXPANSION OF THE ARKUN
STRATEGIC AND BATTERY METALS PROJECT, WA.
•
•
•
•
•
•
Three new Exploration Licence applications submitted immediately north of the Arkun
project along trend from the recently discovered REE soil geochemistry anomalies at
Hyperion, Swordfish and Horseshoe as well as the Caligula copper anomaly.
The new licences cover a further 720 km2 and increase the size of the Arkun project to
2,900 km2 in the emerging mineral province of southwest WA.
The new licences are considered highly prospective for a range of strategic and battery
metals, including REE and copper-nickel sulphides.
Two significant EM conductors identified in government airborne EM lines that have never
been drill-tested are priority areas for follow-up work.
Statutory approvals and land access agreements are in progress for a maiden drill
programme at Hyperion and other targets, alongside negotiations with drilling contractors.
Soil geochemistry surveys are ongoing in the north and west parts of Arkun.
Impact Minerals’ Managing Director, Dr Mike Jones, said, “After the recent significant breakthroughs in the soil
geochemistry programs that discovered our Hyperion and Caligula prospects, we have been able to expand our
strategic ground holding in the emerging mineral province of the southwest Yilgarn province in Western
Australia. The new applications contain strike extensions and similar geology to our newly discovered prospects
and are easily accessible, allowing us to start groundwork quickly following the usual land access negotiations.
We are also looking forward to our maiden drill program at Arkun early in the next Quarter and are well
advanced in the approvals process and securing the appropriate drill rig.”
Impact Minerals Limited (ASX:IPT) is pleased to announce that it has applied for three new exploration
licences covering 720 km2 north of and contiguous with the company’s 100%-owned Arkun project, located
150 km east of Perth in the emerging mineral province of south-west Western Australia (Figures 1 and 2).
The three applications (ELA70/6598; ELA70/6604 and E70ELA/6595) share similar geology to and are along
strike from the large and significant soil geochemistry anomalies recently identified for Rare Earth Elements
(REE) at Hyperion, Swordfish and Horseshoe and copper-bismuth-cobalt at Caligula (ASX Releases January 4th
2024 and January 24th 2024). There has been no significant previous exploration of the new licences.
Impact now holds a strategic ground position that covers 120 km of trend of the Corrigin Tectonic Zone (CTZ)
which marks a major crustal boundary between the South West and Youanmi Terranes of the Yilgarn Craton
(Figure 1). The CTZ is host to major gold deposits at Katanning (>3 million ounces gold) and copper at Calingiri
(>3 million tonnes of copper) as well as mafic-ultramafic rocks similar to those at the Julimar deposit (>10
million ounces of palladium).
Figure 1. Location and regional geological setting of Impact’s Arkun and other projects shown in blue in the
emerging mineral province of southwest Western Australia. Significant nickel deposits are shown in orange,
lithium deposits in green and gold deposits in yellow.
Impact considers the central and western part of the (CTZ) region to be highly prospective for a range of
strategic and battery metals including REE, copper and nickel as well as gold and a significant number of
targets have been identified within the current Arkun project area (Figure 2). Impact is looking to drill several
of these anomalies in the next Quarter.
Two strong conductors have already been identified as priority areas for follow-up work in regional airborne
electromagnetic data within the new licences ((2.5D inversion of SkyTEM data: Figures 2 and 3).
Line 200401 has a 400 m by 300 m conductor at about 120 m depth (Figure 2), and Line 200501 has a 500 m
by 200 m conductor dipping steeply west at 100m depth (Figure 3). The EM anomalies line up along a fault
splay linked to Impact’s Caligula copper anomaly and this adds a further 40 km of prospective strike length to
the Arkun project.
ASX:IPT | ABN 52 119 062 261
Figure 2. Image of regional airborne magnetic data showing the Arkun project and key prospects, the new
Exploration Licence applications and government SkyTEM survey lines and the two new EM conductors.
ASX:IPT | ABN 52 119 062 261
Figure 3a. Line 200401. SkyTEM1. Reprocessed 2.5D inversion highlighting strong conductor centered on a
major magnetic lineament (Figure 1).
Figure 3b. Line 200501. SkyTEM2. Reprocessed 2.5D inversion steeply dipping conductor centered on a major
magnetic lineament (Figure 1).
NEXT STEPS
The three tenement applications (E70/6598; E70/6604 and E70/6595) are now pending grant, a process
expected to take up to 5 months. Impact will commence some reconnaissance work including field checking
and rock chip sampling along gazetted roads and tracks to help accelerate exploration prior to grant. In
addition, a detailed interpretation of the bedrock geology from the magnetic data will be completed to help
identify other priority areas for follow up.
In addition, statutory approvals and land access negotiations are in progress for a maiden drill program at
Arkun to commence in the coming Quarter. The drill programme will test the Hyperion REE target, and EM
anomaly at Three Eagles and possibly the Caligula and Beau targets if land access is granted.
A large soil geochemistry programme involving about 1,700 samples is underway. This programme will be
completed before the Wheatbelt seeding period and will cover extensions of many of Impact's previously
identified soil geochemistry.
Given the ongoing focus on the Lake Hope High Purity Alumina Project and Arkun, a review of Impact’s other
projects in the Wheatbelt is underway.
Dr Michael G Jones
Managing Director
ASX:IPT | ABN 52 119 062 261
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling techniques
•
Nature and quality of sampling (e.g. cut channels, random chips, or specific
specialised industry standard measurement tools appropriate to the minerals
under investigation, such as down hole gamma sondes, or handheld XRF
instruments, etc). These examples should not be taken as limiting the broad
meaning of sampling.
•
Regional airborne SKYTEM survey completed by GSWA.
•
Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used.
•
Aspects of the determination of mineralisation that are Material to the Public
Report.
•
Description of ‘industry standard’ work
Drilling techniques
•
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details (e.g. core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc).
•
No drilling
Drill sample recovery
•
Method of recording and assessing core and chip sample recoveries and results
assessed.
•
No drilling
•
Measures taken to maximise sample recovery and ensure representative nature
of the samples.
•
Whether a relationship exists between sample recovery and grade and whether
sample bias may have occurred due to preferential loss/gain of fine/coarse
material.
•
Whether core and chip samples have been geologically and geotechnically
logged to a level of detail to support appropriate Mineral Resource estimation,
mining studies and metallurgical studies.
•
Not applicable to exploration geophysics
•
Whether logging is qualitative or quantitative in nature. Core (or costean,
channel, etc) photography.
•
The total length and percentage of the relevant intersections logged.
•
If core, whether cut or sawn and whether quarter, half or all core taken.
•
Not applicable to exploration geophysics
•
If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled
wet or dry.
•
For all sample types, the nature, quality and appropriateness of the sample
preparation technique.
•
Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
•
Measures taken to ensure that the sampling is representative of the in-situ
material collected, including for instance results for field duplicate/second-half
sampling.
•
Whether sample sizes are appropriate to the grain size of the material being
sampled.
•
The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total.
•
The EM data was processed by Sensore Ltd using a proprietary 2.5D
inversion algorithm.
•
For geophysical tools, spectrometers, handheld XRF instruments, etc, the
parameters used in determining the analysis including instrument make and
model, reading times, calibrations factors applied and their derivation, etc.
•
Nature of quality control procedures adopted (e.g. standards, blanks, duplicates,
external laboratory checks) and whether acceptable levels of accuracy (i.e. lack
of bias) and precision have been established.
•
The verification of significant intersections by either independent or alternative
company personnel.
•
No adjustments have been made to the data
•
The use of twinned holes.
•
Documentation of primary data, data entry procedures, data verification, data
storage (physical and electronic) protocols.
•
Discuss any adjustment to assay data.
•
Accuracy and quality of surveys used to locate drill holes (collar and down-hole
surveys), trenches, mine workings and other locations used in Mineral Resource
estimation.
•
Airborne GPS survey
•
MGA Zone 50 South
•
Line spacing is very coarse at 20 km.
•
Approximately 45 to 90 degrees to stratigraphy.
Logging
Sub-sampling
techniques and sample
preparation
Quality of assay data
and laboratory tests
Verification of
sampling and assaying
Location of data points
•
Specification of the grid system used.
•
Quality and adequacy of topographic control.
•
Data spacing for reporting of Exploration Results.
•
Whether the data spacing and distribution is sufficient to establish the degree of
geological and grade continuity appropriate for the Mineral Resource and Ore
Reserve estimation procedure(s) and classifications applied.
•
Whether sample compositing has been applied.
Orientation of data in
relation to geological
structure
•
Whether the orientation of sampling achieves unbiased sampling of possible
structures and the extent to which this is known, considering the deposit type.
•
If the relationship between the drilling orientation and the orientation of key
mineralised structures is considered to have introduced a sampling bias, this
should be assessed and reported if material.
Sample security
•
The measures taken to ensure sample security.
•
Not applicable to exploration geophysics
Audits or reviews
•
The results of any audits or reviews of sampling techniques and data.
•
No reviews are required at this stage of exploration
Data spacing and
distribution
ASX:IPT | ABN 52 119 062 261
Section 2 Reporting of Exploration Results
Criteria listed in the preceding section also apply to this section.
Criteria
JORC Code explanation
Commentary
Mineral tenement and land
tenure status
•
•
Native Title Agreements are in place with Native Title parties
•
Access is granted on an individual basis with freehold land holders for individual
lots
•
There is no significant exploration in the new licence applications.
Type, reference name/number, location and ownership
including agreements or material issues with third parties such
as joint ventures, partnerships, overriding royalties, native title
interests, historical sites, wilderness or national park and
environmental settings.
•
The security of the tenure held at the time of reporting along
with any known impediments to obtaining a licence to operate
in the area.
Exploration done by other
parties
•
Acknowledgment and appraisal of exploration by other
parties.
Geology
•
Deposit type, geological setting and style of mineralisation.
The Southwest Yilgarn Province is an Archaean terrane dominated by granite
plutons and minor, predominantly sedimentary, gneissic greenstone belts.
Subordinate mafic and/or ultramafic intrusions, dolerites and mafic volcanic
units are recognized, forming a supracrustal association.
Impact interprets the geology of the Arkun Project to comprise a complex
assemblage of pre-tectonic basement granitoids many of which are migmatised,
sedimentary gneiss and migmatite, pyroxene granulite potentially representing
mafic-ultramafic intrusions, and post-tectonic granitoids and Proerozoic dykes.
•
No drilling
•
No data aggregation is required
•
Due to the poor outcrop coverage in the prospect area, width of mineralisation
is currently unknown.
Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery
being reported These should include, but not be limited to a
plan view of drill hole collar locations and appropriate
sectional views.
•
Refer to diagrams in body of the report.
•
Where comprehensive reporting of all Exploration Results is
not practicable, representative reporting of both low and high
grades and/or widths should be practiced to avoid misleading
reporting of Exploration Results.
•
It is impractical to report geophysical data
•
Other exploration data, if meaningful and material, should be
reported including (but not limited to): geological
observations; geophysical survey results; geochemical survey
results; bulk samples – size and method of treatment;
metallurgical test results; bulk density, groundwater,
geotechnical and rock characteristics; potential deleterious or
contaminating substances.
•
Impact has flown seven grids of airborne EM and one area for Mobile Magnetotellurics in the Arkun project
•
Impact has taken a selection of rock chip samples
•
Impact has undertaken regolith mapping and a project-wide geology
interpretation
•
The nature and scale of planned further work (eg tests for
lateral extensions or depth extensions or large-scale step-out
drilling).
•
Follow up field checking and soil geochemistry surveys.
•
Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future
drilling areas, provided this information is not commercially
sensitive.
•
A summary of all information material to the understanding of
the exploration results including a tabulation of the following
information for all Material drill holes:
•
easting and northing of the drill hole collar
•
elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
•
dip and azimuth of the hole
•
down hole length and interception depth
•
hole length.
•
If the exclusion of this information is justified on the basis that
the information is not Material and this exclusion does not
detract from the understanding of the report, the Competent
Person should clearly explain why this is the case.
•
In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations (e.g.
cutting of high grades) and cut-off grades are usually Material
and should be stated.
•
Where aggregate intercepts incorporate short lengths of highgrade results and longer lengths of low grade results, the
procedure used for such aggregation should be stated and
some typical examples of such aggregations should be shown
in detail.
•
The assumptions used for any reporting of metal equivalent
values should be clearly stated.
•
These relationships are particularly important in the reporting
of Exploration Results.
•
If the geometry of the mineralisation with respect to the drill
hole angle is known, its nature should be reported.
•
If it is not known and only the down hole lengths are reported,
there should be a clear statement to this effect (eg ‘down hole
length, true width not known’).
Diagrams
•
Balanced reporting
Other substantive exploration
data
Drill hole Information
Data aggregation methods
Relationship between
mineralisation widths and
intercept lengths
Further work
ASX:IPT | ABN 52 119 062 261
Share your feedback
Discover