Impact Awarded $150,000 Grant for Drilling at Mulga Tank
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
Date: 16 June 2016
Number: 474/160616
IMPACT AWARDED $150,000 GRANT FOR
DRILLING AT MULGA TANK
Impact Minerals Limited (ASX:IPT) is pleased to announce that it has been awarded $150,000 by
the West Australian Government Exploration Incentive Scheme to drill test a number of targets
at the Company’s 100% owned Mulga Tank gold and nickel project located 200 km east of
Kalgoorlie (Figure 1).
Impact discovered high tenor nickel and copper sulphides at the Mulga Tank Dunite in its
maiden drill programme in 2013 (see announcement 29 January 2014).
Three styles of nickel-copper mineralisation were identified:
1.
Extensive disseminated nickel in the Mulga Tank Dunite with assays of:
2 m at 1.3% nickel including 1 m at 2% nickel and multiple 0.5 m thick zones of 0.5% to
1.2% nickel within an intercept of 115 m at 0.3% nickel;
Other thick intercepts including 21 m at 0.4% nickel and 59 m at 0.3% nickel.
2.
High tenor veins at the base of the Mulga Tank Dunite with assays of:
0.25 m at 3.8% nickel, 0.7% copper and 0.7 g/t PGE and 0.3 m at 0.7% nickel; and
3.
High tenor nickel sulphide in multiple komatiites in a flow channel in the upper part of
the dunite with assays of:
0.75 m at 0.85% nickel, 0.35% copper and 0.28 g/t PGE (Pt+Pd+Au); and
6.7 m at 0.5% nickel.
The style of mineralisation and the nature of the rocks are similar to those that host the
significant nickel deposits at Perseverance (1 Mt of contained nickel) and Mt Keith (>2 Mt of
contained nickel) near Leinster in WA (Figure 1).
In addition the project area occurs in the same geological terrain as the recently discovered
Gruyere deposit of more than 5 million ounces of gold (Figure 1). The Mulga Tank project has
been poorly explored for gold and this will also be a focus of the forward programme.
In 2015 Impact completed an airborne magnetic and radiometric survey over the entire project
area, an innovative combined airborne and ground electrical survey as well as a large soil
geochemistry survey over key target areas.
26 Richardson Street West Perth Western Australia 6005
Tel +61 (8) 6454 6666 Facsimile +61 (8) 6454 6667
Email info@impactminerals.com.au www.impactminerals.com.au
This new data will be used to identify specific targets for drilling using the newly awarded funds.
Impact would like to thank its Chief Operating Officer, Leo Horn, and geologist, Jason Ashby, for
their contribution to the award application process.
Dr Michael G Jones
Managing Director
The review of exploration activities and results contained in this report is based on information compiled by Dr Mike Jones,
a Member of the Australian Institute of Geoscientists. He is a director of the company and works for Impact Minerals
Limited. He has sufficient experience which is relevant to the style of mineralisation and types of deposits under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 edition of
the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code). Mike
Jones has consented to the inclusion in the report of the matters based on his information in the form and context in which
it appears.
Figure 1. Location of the Mulga Tank Project and major nickel mines in
central WA together with recent gold discoveries at Tropicana and Gruyere.
APPENDIX 1 - SECTION 1 SAMPLING TECHNIQUES AND DATA
Criteria
JORC Code explanation
Sampling techniques
Nature and quality of sampling (e.g. cut channels, random chips, or specific
specialised industry standard measurement tools appropriate to the
minerals under investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should not be taken as
limiting the broad meaning of sampling.
The soil samples were taken at a depth of 15 – 20 cm below surface and sieved to -2mm mesh
size. The targets at Mulga Tank have been drilled by Reverse Circulation (RC) and diamond drill
holes (DD). Eight holes for 3,025 m were completed.
A hand held Olympus XRF machine was used to take multi-element readings on the samples
bags from the RC drill pre-collars (I reading every I metre) and at 25 cm to 50 cm intervals on
the diamond core. These readings are a guide only and do not constitute an accurate or
precise assay. Impact has conducted a number of quality control experiments to determine
the optimal reading time and number of readings per sample site. A correlation of these
readings against the assay data suggests that at values greater than 1% nickel, the XRF
analyser gives a good approximation to the chemical assay value.
Drill holes were oriented to intersect the dip of electromagnetic conductors as interpreted by
Impact’s consultants Newexco.
Include reference to measures taken to ensure sample representivity and
the appropriate calibration of any measurement tools or systems used
RC samples have been collected by riffle splitter. Diamond core was used to obtain high
quality samples that were logged for lithological, structural, alteration and other attributes.
Sampling was carried out under Impact Minerals Ltd protocols and QAQC procedures as per
industry best practice.
A combination of mapping, soil geochemistry, airborne magnetic data and ground EM surveys
identified the Mulga Tank target.
Aspects of the determination of mineralisation that are Material to the
Public Report. In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases more explanation may be required,
such as where there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g. submarine nodules) may
warrant disclosure of detailed information
Diamond core is mostly NQ2 size, sampled on geological intervals cut into half core to give
sample weights under 3 kg. Reverse circulation drilling was used to obtain 1 m samples from
which 3 kg was pulverised. Samples were crushed, dried and pulverised (total prep) to
produce a sub-sample for analysis by four acid digest with an ICP/OES finish for base metals
and lead collection fire assay with AAS finish for precious metals.
The main sulphide types are expected to be pentlandite and chalcopyrite, with pyrite, and
minor sphalerite. Non-sulphide nickel species in weathered and transitional material have not
yet been identified.
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details (e.g. core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or other type, whether core
is oriented and if so, by what method, etc).
Diamond drilling accounts for 75 % of the drilling and comprises HQ and NQ2 sized core. Precollar depths range from 50 m to about 150 m and hole depths range from 300 m to 570 m.
The core was oriented using a down-hole orientation tool at the end of every run with 70% of
orientations rated as “good”.
RC drilling in the pre-collar accounts for 20 % of the total drilling and comprises 140 mm
diameter face sampling hammer drilling.
Method of recording and assessing core and chip sample recoveries and
results assessed
Diamond core and RC recoveries are logged and recorded in the database. Overall recoveries
are >95% for Mulga Tank and there are no core loss issues or significant sample recovery
problems.
Drilling techniques
Drill sample recovery
Commentary
Criteria
Logging
Sub-sampling techniques and
sample preparation
Quality of assay data and
laboratory tests
JORC Code explanation
Commentary
Measures taken to maximise sample recovery and ensure representative
nature of the samples
Diamond core at Mulga Tank is reconstructed into continuous runs on an angle iron cradle for
orientation marking. Depths are checked against the depth given on the core blocks and rod
counts are routinely carried out by the drillers. RC samples were visually checked for recovery,
moisture and contamination.
Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain of
fine/coarse material.
No sample bias has been established because an insufficient number of samples have been
assayed.
Whether core and chip samples have been geologically and geotechnically
logged to a level of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical studies.
Information on structure type, dip, dip direction, alpha angle, beta angle, texture, shape and
fill material is stored in the structure table of the database.
Whether logging is qualitative or quantitative in nature. Core (or costean,
channel, etc) photography.
Logging of diamond core and RC samples at Mulga Tank recorded lithology, mineralogy,
mineralisation, structural (DDH only), weathering, colour and other features of the samples.
Core was photographed in both dry and wet form.
The total length and percentage of the relevant intersections logged
All drillholes were logged in full, apart from rock roller diamond hole pre-collar intervals of
between about 50 m and 70 m depth.
If core, whether cut or sawn and whether quarter, half or all core taken.
Core for Mulga Tank was cut in half onsite using an automatic core saw. All samples were
collected from the same side of the core.
If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
RC samples were split using a riffle splitter.
For all sample types, the nature, quality and appropriateness of the sample
preparation technique.
The sample preparation of diamond core for Mulga Tank follows industry best practice in
sample preparation involving oven drying, coarse crushing of the half core sample down to
~10 mm followed by pulverisation of the entire sample (total prep) using Essa LM5 grinding
mills to a grind size of 85% passing 75 micron. The sample preparation for RC samples is
identical, without the coarse crush stage.
Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
Field QC procedures involve the use of certified reference material as assay standards, along
with blanks, duplicates and barren washes. The insertion rate of these averaged 1:50.
Measures taken to ensure that the sampling is representative of the in situ
material collected, including for instance results for field duplicate/secondhalf sampling.
Field duplicates are done every 50 samples.
Whether sample sizes are appropriate to the grain size of the material being
sampled.
The sample sizes are considered to be appropriate to correctly represent the sulphide
mineralisation at Mulga Tank based on the disseminated style of mineralisation, the thickness
and consistency of the intersections, the sampling methodology and percent value assay
ranges for the primary elements.
The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total.
See optiro. An industry standard fire assay technique using lead collection with an Atomic
Absorption Spectrometry (AAS) finish was used for Au, Ag, Pt, Pd.
Criteria
Verification of sampling and
assaying
JORC Code explanation
Commentary
For geophysical tools, spectrometers, handheld XRF instruments, etc, the
parameters used in determining the analysis including instrument make and
model, reading times, calibrations factors applied and their derivation, etc.
No geophysical tools were used to determine material element concentrations.
Nature of quality control procedures adopted (e.g. standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels of
accuracy (i.e. lack of bias) and precision have been established.
Quality control procedures for assays are as per Impact Minerals protocols. Accuracy and
precision are within acceptable limits.
The verification of significant intersections by either independent or
alternative company personnel.
Significant intersections have yet to be returned and therefore verification is not required.
The use of twinned holes.
No twin holes have been drilled at Mulga Tank.
Documentation of primary data, data entry procedures, data verification,
data storage (physical and electronic) protocols.
Primary data was collected using a set of standard Excel templates on Toughbook laptop
computers using lookup codes. The information was sent to IOGlobal/Reflex for validation and
compilation into a SQL database server.
Discuss any adjustment to assay data.
Location of data points
Accuracy and quality of surveys used to locate drillholes (collar and downhole surveys), trenches, mine workings and other locations used in Mineral
Resource estimation.
Drill holes and soil sample sites were located by hand held GPS.
Down-hole surveys used single shot readings have been completed during drilling at least at
50 m intervals.
Specification of the grid system used.
The grid system for Mulga Tank is MGA_GDA94, Zone 51.
Quality and adequacy of topographic control.
Standard government topographic maps and hand held GPS have been used for topographic
control. The land surface is flat and increased accuracy and precision for topographic contours
is not required at this stage.
Data spacing for reporting of Exploration Results.
This is a first pass reconnaissance drill programme designed to test geochemical and
geophysical anomalies. Drill spacing is adequate for that and will change according to on-going
results.
Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and classifications
applied.
This is a first pass reconnaissance drill programme designed to test geochemical and
geophysical anomalies. Drill spacing is adequate for that and will change according to on-going
results.
Whether sample compositing has been applied.
Samples will be composited to one metre lengths and adjusted where necessary to ensure
that no residual sample lengths have been excluded (best fit).
Whether the orientation of sampling achieves unbiased sampling of possible
structures and the extent to which this is known, considering the deposit
type.
The targets have been drilled sub-perpendicular to mineralisation within the stratigraphy, but
subparallel to the orientation of some veins in the mineralised trend. Structural logging based
on oriented core to determine the controls on mineralisation are on-going.
Data spacing and distribution
Orientation of data in relation
to geological structure
Criteria
JORC Code explanation
Commentary
If the relationship between the drilling orientation and the orientation of
key mineralised structures is considered to have introduced a sampling bias,
this should be assessed and reported if material.
No orientation based sampling bias has been identified at Mulga Tank in the data at this point,
although the vertical sulphide veins may cause hole orientations to be changed in future drill
programmes.
Sample security
The measures taken to ensure sample security.
Chain of custody is managed by Impact Minerals Ltd. Samples for Mulga Tank are stored on
site and delivered by Impact Minerals Ltd personnel to Kalgoorlie for initial sample preparation
by Genalysis who then transport the samples to Perth for assay. Whilst in storage, they are
kept in a locked yard. Tracking sheets have been set up to track the progress of batches of
samples.
Audits or reviews
The results of any audits or reviews of sampling techniques and data.
At this stage of exploration a review of the sampling techniques and data by an external party
is not warranted. An internal review of the sampling techniques and data will be completed at
the end of the current programme.
SECTION 2 REPORTING OF EXPLORATION RESULTS
Criteria
Mineral tenement and land
tenure status
Exploration done by other
parties
JORC Code explanation
Commentary
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint ventures,
partnerships, overriding royalties, native title interests, historical sites,
wilderness or national park and environmental settings.
The Mulga Tank Project comprises 13 exploration licences covering 425 km2. Mulga Tank is
located wholly within Exploration Licence E39/988. Impact Minerals Ltd (IPT) has a 20%
interest in the tenement with Golden Cross Resources Limited (GCR: 80%). There is no Native
Title Claim over the licence.
The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
The tenement is in good standing with no known impediments. IPT has the right to earn 70%
ownership with $1.9M expenditure commitment before November 2017.
Acknowledgment and appraisal of exploration by other parties.
Limited bedrock-cover interface percussion drilling completed by previous explorers focused
on the southern contact of the dunite, a circular, strongly magnetic feature 3.5 km by 4 km in
diameter that is interpreted to represent a flat-lying ultramafic sill. A total of 28 RC and 4
diamond holes were completed.
Deposit type, geological setting and style of mineralisation.
Mulga Tank is interpreted as an ultramafic hosted primary magmatic nickel sulphide deposit,
similar in style to the Perseverance and Rocky’s Reward nickel mines at Leinster in Western
Australia. The Mulga Tank Dunite is also similar to the unit that hosts the Mount Keith
disseminated nickel sulphide deposit. There are two prospective units (Upper and Lower) that
host the initial sulphide intersections at a depth of 300 and 350 metres vertically
(respectively).
Geology
Criteria
Drill hole Information
Data aggregation methods
JORC Code explanation
Commentary
A summary of all information material to the understanding of the
exploration results including a tabulation of the following information for
all Material drill holes:
easting and northing of the drill hole collar
elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
dip and azimuth of the hole
down hole length and interception depth
hole length.
Refer to Table 2 in body of text. Further details are not material for this early stage of
exploration.
In reporting Exploration Results, weighting averaging techniques, maximum
and/or minimum grade truncations (e.g. cutting of high grades) and cut-off
grades are usually Material and should be stated.
All reported assays have been length weighted. No top outs have been applied. A nominal
cut-off of 0.3% to 0.5% nickel has been applied.
Where aggregate intercepts incorporate short lengths of high grade results
and longer lengths of low grade results, the procedure used for such
aggregation should be stated and some typical examples of such
aggregations should be shown in detail.
High grade massive sulphide intervals internal to broader zones of sulphide mineralisation are
reported as included intervals.
The assumptions used for any reporting of metal equivalent values should
be clearly stated.
No metal equivalent values are used for reporting exploration results.
Relationship between
mineralisation widths and
intercept lengths
These relationships are particularly important in the reporting of
Exploration Results.
If the geometry of the mineralisation with respect to the drill hole angle is
known, its nature should be reported.
If it is not known and only the down hole lengths are reported, there should
be a clear statement to this effect (e.g. ‘down hole length, true width not
known’).
Diagrams
Appropriate maps and sections (with scales) and tabulations of intercepts
should be included for any significant discovery being reported These
should include, but not be limited to a plan view of drill hole collar locations
and appropriate sectional views.
Refer to Figures in body of text.
Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades and/or
widths should be practiced to avoid misleading reporting of Exploration
Results.
All results reported are representative
Balanced reporting
The Mulga Tank deposit is a flat lying ultramafic sill. Holes to date have been sub-vertical and
whilst this is perpendicular to stratigraphy, steeply dipping sulphide veins are at a sub-optimal
orientation to the drillhole.
Criteria
JORC Code explanation
Other substantive exploration
data
Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical survey
results; geochemical survey results; bulk samples – size and method of
treatment; metallurgical test results; bulk density, groundwater,
geotechnical and rock characteristics; potential deleterious or
contaminating substances.
Further work
The nature and scale of planned further work (e.g. tests for lateral
extensions or depth extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of possible extensions, including the
main geological interpretations and future drilling areas, provided this
information is not commercially sensitive
Commentary
The drill targets at Mulga Tank have been ranked on the basis of soil geochemistry and ground
EM results.
Information on structure type, dip, dip direction, alpha angle, beta angle, texture, shape,
roughness and fill material is stored in the structure table of the database.
Follow up work programmes will be subject to interpretation of assay results which is ongoing.