ENCOURAGING SIGNS AT PLATINUM SPRINGS
• A proprietary geochemical vector towards high grade PGE mineralisation
identified in multi-element assay data in a significant technical breakthrough.
• The vector has identified two prospective corridors where drilling is still in
progress.
• Assays from the first 10 drill holes lie outside the corridors and have returned
modest grades of PGE’s in zones up to 24 metres thick.
• Vector to be applied at other prospects.
Impact Minerals Limited (ASX:IPT) is pleased to announce that it has identified a potentially powerful
geochemical vector that increases towards higher grade nickel-copper-platinum group element (PGE)
mineralisation at the company’s Platinum Springs prospect at Broken Hill in New South Wales and where
drilling is in progress (Figure 1). This is a significant technical break-through by Impact.
Figure 1. Location of Impact’s tenements
in the Broken Hill area and key prospects
for nickel-copper-PGM mineralisation.
Platinum Springs, Red Hill and Little
Broken Hill Gabbro are in the NE of the
map.
26 Richardson Street West Perth Western Australia 6005
Tel +61 (8) 6454 6666 Facsimile +61 (8) 6454 6667
Email info@impactminerals.com.au www.impactminerals.com.au
The vector may offer a method to help overcome one of the main exploration challenges that Impact and
all previous explorers have faced at Platinum Springs which is to discriminate and rank the numerous high
grade drill intercepts spread over many hundreds of metres that have proved difficult to track with the drill
rig.
This exploration challenge has also discouraged extensive exploration of the entire Moorkai Trend, a
major nine kilometre long dyke and chonolith complex of which Platinum Springs is a part of, that has
very high grade nickel-copper-PGM’s in rock chip samples along its entire length (Figure 2, ASX Release
3rd February 2016). Impact’s vector may open up the entire Trend to further systematic exploration for
the first time.
Figure 2. Rock chip sample
results from along the
Moorkai Trend.
A similar challenge also occurs in many other chonolith-feeder zone systems around the world where
despite commonly complex geometry, significant high grade mineralisation may persist for long distances
down plunge. This is being currently demonstrated for example at the Julimar intrusion in Western
Australia (Chalice Gold NL).
Three main target areas at the southern end of the Moorkai Trend are being tested in the current
programme by reverse circulation drilling: Platinum Springs, Plat Central and Plat West. These areas
cover three parts of a significant change in trend of the dyke from north-south to east-west over a distance
of about 1,500 metres (Figures 2, 4 and 5). As previously reported the drill programme has been delayed
by extensive and on-going wet weather and the loss of a batch of samples by the courier company in
transit to the laboratory.
VECTORS TO HIGH GRADE ORE AT PLATINUM SPRINGS
Impact has undertaken a considerable amount of in-house research on the nature and origin of the unusual
ultramafic and mafic rocks that host the exceptional grades of nickel-copper-PGE mineralisation at
Broken Hill (ASX Release 6th March 2019).
As part of that research Impact has very recently identified a specific multi-metal ratio (that is proprietary
to Impact) that shows an exceptional positive correlation with PGE grades and offers a possible vector
towards higher grade zones.
Figure 3 shows the relationship between the geochemical ratio and grades of platinum+palladium+gold
(3PGE) as determined by laboratory assay for all available data at Platinum Springs. All material assays
have been reported previously (ASX Releases 7th May 2020, 20th August 2020). The data also includes a
large number of non-material assays of lower grade PGM’s.
Figure 3. Graph of
platinum+palladium+gold (3PGE)
in parts per billion (y axis) against
Impact’s multi-metal ratio (x axis).
Green dots are ultramafic rocks
and orange dots are unmineralised
metasedimentary rocks.
Note key thresholds at a ratio of
between 2 to 5 and also in
particular of more than 10 that
mark increases in grade of the
3PGE. Note also that there are
some exceptions to the rule!
The positive relationship between the ratio and 3PGE grade is self-evident in the figure and suggests that
anomalous grades of more than 250 ppb 3PGE are generally associated with ratios greater than 2 to about
5 and that ratios greater than 10 are likely to have 3PGE grades greater than about 1 g/t.
A ratio value well in excess of 10,000 was returned from the narrow unit of magmatic nickel-copper-PGM
sulphides that returned 0.6 metres at 11.5 g/t platinum, 25.6 g/t palladium, 1.4 g/t gold, 7.6% copper,
7.4% nickel and 44.3 g/t silver from 57.1 metres down hole in Impact’s drill hole PSD02 further
supporting Impact’s thesis (ASX Release 3rd February 2016). This data point is not shown on the graph
because it is well off the scale.
Impact interprets the changes in ratio to reflect changes in specific physico-chemical conditions in the
parent ultramafic magma at the time of mineralisation.
HAND HELD XRF RESULTS
Impact has also demonstrated to its satisfaction that hand held XRF data is of sufficient accuracy and
precision compared to the laboratory assay data to be used to calculate the ratio in the field to now help
guide drilling as the programme progresses.
Figure 4 shows a 3D view looking north through Impact’s drill holes showing the ratio as calculated from
the XRF data. Two areas, or corridors, in particular stand out within the target ultramafic units that have
thicker zones of larger ratios and numerous ratio values greater than 10: Plat Central and an area to the
east of the main Platinum Springs drilling.
These corridors are shown in plan view in Figures 5 and 6 where it is evident that there is little or no
drilling to the north and large areas remain untested.
Figure 4. Three-dimensional view looking north of recent drilling at Platinum Springs showing ratio
values as calculated from hand-held XRF data. Note two areas of more coherent elevation of the ratio at
Plat Central and the eastern part of Platinum Springs (two drill holes are close together east of PSIPT20).
Drilling is still in progress at both prospects.
Figures 5 and 6. Surface geology (upper) and image of magnetic data (lower) of the Platinum Springs
area showing corridors of larger ratios at Plat Central and Plat Springs together with previous drill results.
Extra drill holes have been completed and are underway at both these target areas with the aim of further
determining the efficacy of the ratio and its ability to guide the drill rig towards higher grade
mineralisation, either along trend or down dip.
It is emphasised that assays are not yet available for these holes and it should not be construed that high
PGE grades will necessarily be returned.
DRILL RESULTS
Assays have now been received for 10 of the first 15 drill holes at Platinum Springs. Samples for four
further holes are part of the missing batch of samples and one hole was abandoned before target depth.
Details of the drill holes and the drill intercepts are given in Tables 1 and 2 with further information in the
JORC Table.
All of the drill holes lie outside the corridors identified by Impact’s ratio and may therefore be outside the
most prospective parts of the system. They do however further confirm that thick widths of modest grade
PGE’s are present over many hundreds of metres in this area which attests to the exceptional background
levels of these metals throughout the ultramafic unit.
Holes PSIPT01, 02, 07 and 08, 10 and 11 (together with missing holes 03-06) were designed to test
around the high grade intercept in Impact’s hole PSD02 at Platinum Springs. The assays for holes 03 to 06
are required to make a full interpretation of this area and a further narrow north-south trending corridor of
greater prospectivity may still be present here.
The highest values were in Hole PSIPT08 which returned:
17 metres at 321 ppb 3PGE from 42 metres downhole including 1 metre at 610 ppb (0.6 g/t) 3PGE
from 45 metres and 1 metre at 963 ppb (0.96 g/t) 3PGE from 57 metres.
Hole PSIPT011 returned 14 metres at 209 ppb 3PGE from 41 meters including 1 metre at 541 ppb
(0.54 g/t) 3PGE from 50 metres.
Hole PSIPT09 tested a gossan zone to the east of Platinum Springs and did not return any significant
results.
At Platinum West Hole PSIPT013 returned 26 metres at 202 ppb 3PGE from 97 metres including 1
metre at 725 ppb (0.73 g/t) 3 PGE from 108 metres; and 1 metre at 1,510 ppb (1.5 g/t) 3PGE from
111 metres, and Hole PSIPT014 returned 12 metres at 183 ppb 3PGE from 96 metres including
1 metre at 829 ppb 3PGE from 106 metres.
NEXT STEPS
Drilling is still in progress within the two identified corridors with completion here, as well as at Red Hill
and Dora East expected towards the end of the week, weather permitting.
Further research on the nature of the vector and its applicability both at Platinum Springs and other
prospects will now commence.
COMPLIANCE STATEMENT
This report contains collar locations for 15 new drill holes and assay data for 10 new drill holes drilled by
Impact.
Dr Mike Jones
Managing Director
The review of exploration activities and results contained in this report is based on information compiled by Dr Mike Jones, a Member
of the Australian Institute of Geoscientists. He is a director of the company and works for Impact Minerals Limited. He has sufficient
experience which is relevant to the style of mineralisation and types of deposits under consideration and to the activity which he is
undertaking to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves (the JORC Code). Mike Jones has consented to the inclusion in the report of the matters
based on his information in the form and context in which it appears.
TABLE 1. DRILL HOLE DETAILS
Hole ID
PSIPT001
PSIPT002
PSIPT003
PSIPT004
PSIPT005
PSIPT006
PSIPT007
PSIPT008
PSIPT009
PSIPT010
PSIPT011
PSIPT012
PSIPT013
PSIPT014
PSIPT015
MGA_N
6472085
6472105
6472104
6472120
6472104
6472103
6472106
6472120
6471950
6472101
6472120
6472420
6472398
6472384
6472350
MGA_E
562990
562962
562961
562969
562980
562944
562943
562940
563230
562961
562925
562502
562500
562492
562531
RL Dip Azimuth Depth
235 90
0
57
235 90
0
37.5
235 90
0
52
235 90
0
70
235 90
0
67
235 90
0
67
235 70
192
70
235 90
0
70
252 70
245
70
237 75
165
67
234 90
0
70
234 60
270
154
234 65
270
139
234 70
270
130
234 90
0
97
TABLE 2. Significant Intercepts
Hole ID
PSIPT001
including
also
including
PSIPT002
PSIPT003
PSIPT004
PSIPT005
PSIPT006
PSIPT007
From
26
41
43
To
31
45
44
44
Interval
(m)
5
4
1
Cu_ppm
437
445
581.3
Ni_ppm
1121
1203
1294.8
Pd_ppb
129
148
191.3
Pt_ppb
68
72
93
Au_ppb
21
15
22
PGM
217
236
306.3
45
1
853.3
1388
256.3
120.9
24
401.2
33
33
3
288
813
119
51
13
183
13
37
24
275
1126
91
42
8
141
15
42
45
16
59
46
1
17
1
728
614
15
1570
1351
1085.2
207
194
376.5
85
104
231.7
31
22
2
323
321
610.2
49
51
2
821
1819
262
130
28
420
Finished in UM
Samples lost
Samples lost
Samples lost
Samples lost
which
includes
PSIPT008
including
and
including
also
including
57
58
1
1854.7
1424.2
607.9
289.2
66
963.1
PSIPT009
5
10
5
530
1285
117
68
21
206
PSIPT010
PSIPT011
30
41
43
55
13
14
180
298
965
1174
68
136
34
63
11
11
113
209
including
50
51
1
1041.3
1694
366
144.1
31
541.1
90
97
101
123
11
26
171
298
1312
1385
83
124
45
72
4
6
133
202
97
108
110
111
117
117
104
109
113
112
123
118
7
1
3
1
6
1
257
714.7
925
1680.9
283
389.3
1233
2078.2
1870
2600.3
1342
1594
99
454.7
429
939.7
100
193.4
57
252.8
246
535.6
57
104.3
7
18
18
35
5
9
163
725.5
692
1510.3
161
306.7
120
96
121
108
1
12
366
324
1605.8
1280
204.5
112
112.2
64
6
7
322.7
183
which
includes
105
107
2
1043
1878
386
215
18
618
including
106
107
1
1464.2
1967.8
516
286.6
27
829.6
NSA
NSA
PSIPT012
PSIPT013
which
includes
and includes
and;
including
including
including
PSIPT014
PSIPT015
Comment
NSA
NSA
NSA
NSA
NSA
Hole
abandoned
APPENDIX 1 - SECTION 1 SAMPLING TECHNIQUES AND DATA FOR THE BROKEN HILL PROJECT
Criteria
JORC Code explanation
Sampling techniques
Nature and quality of sampling (e.g. cut channels, random chips, or specific
specialised industry standard measurement tools appropriate to the
minerals under investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity and
the appropriate calibration of any measurement tools or systems used
Aspects of the determination of mineralisation that are Material to the
Public Report. In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases more explanation may be required,
such as where there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed information
Drilling techniques
Drill sample recovery
Commentary
Reverse Circulation (RC) percussion drilling was used to produce a 1m bulk sample (~25kg) which was
collected in plastic bags. 1m split samples (nominally 3kg) were collected using a riffle splitter and
placed in a calico bag. The cyclone was cleaned out with compressed air at the end of each hole and
periodically during the drilling. Holes were drilled to optimally intercept interpreted mineralised zones.
For samples within the target ultramafic unit, the 1m sample in the calico bag was sent for assay.
Outside the ultramafic unit the bulk sample was speared using standard techniques to produce either a
2 metre or 4 metre composite for assay.
Sample representivity was ensured by a combination of Company Procedures regarding quality control
(QC) and quality assurance / testing (QA).
Examples of QC include (but are not limited to), daily workplace and equipment inspections, as well as
drilling and sampling procedures. Examples of QA include (but are not limited to) collection of “field
duplicates”, the use of certified standards and blank samples approximately every 50 samples
RC samples were submitted to Intertek Laboratories in Perth for assay by 4 acid digest with ICP-MS
finish and Fire Assay technique FA/50 MS for gold, platinum and palladium. Sample preparation
involved: sample crushed to 70% less than 2mm, riffle split off 1 kg, pulverise split to >85% passing 75
microns.
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (e.g. core diameter, triple or
standard tube, depth of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method, etc).
RC drilling comprises 4-inch hammer.
Method of recording and assessing core and chip sample recoveries and
results assessed
RC samples were visually checked for recovery, moisture and contamination as determined from
previous drill logs.
Measures taken to maximise sample recovery and ensure representative
nature of the samples
The RC samples were collected by plastic bag directly from the rig-mounted cyclone and laid directly on
the ground in rows of 10. The drill cyclone and sample buckets are cleaned between rod-changes and
after each hole to minimise down-hole and/or cross contamination.
Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain of
fine/coarse material.
No relationship has been established and it is considered unlikely to be a material issue.
Criteria
Logging
Sub-sampling techniques and
sample preparation
Quality of assay data and
laboratory tests
Verification of sampling and
assaying
JORC Code explanation
Whether core and chip samples have been geologically and geotechnically
logged to a level of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical studies.
Commentary
Geological logging of samples followed company and industry common practice. Qualitative logging of
samples included (but not limited to); lithology, mineralogy, alteration, veining and weathering.
Whether logging is qualitative or quantitative in nature. Core (or costean,
channel, etc) photography.
All logging is quantitative, based on visual field estimates. Systematic photography of the RC chip trays
was completed.
The total length and percentage of the relevant intersections logged
All RC chips samples were geologically logged by on-site geologists.
If core, whether cut or sawn and whether quarter, half or all core taken.
Not applicable.
If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
All RC samples collected in calico bags were split using a riffle splitter. Samples were dry when sampled.
Composite samples were collected from the bulk sample bags using a poly pipe spear.
For all sample types, the nature, quality and appropriateness of the sample
preparation technique.
Company procedures were followed to ensure sub-sampling adequacy and consistency. These included
(but were not limited to), daily work place inspections of sampling equipment and practices, as well as
sub-sample duplicates (“field duplicates”).
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Laboratory QC procedures for rock sample assays involve the use of internal certified reference material
as assay standards, along with blanks, duplicates and replicates. Impact uses field duplicates and
standards for every 1 in 50 samples and blanks every 1 in 100 samples.
Measures taken to ensure that the sampling is representative of the in situ
material collected, including for instance results for field duplicate/secondhalf sampling.
All QA/QC results were within acceptable levels of +/- 15-20%
Whether sample sizes are appropriate to the grain size of the material
being sampled.
Sample sizes are considered appropriate for the mineralisation style.
The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total.
Industry standard fire assay and 4 acid digest analytical techniques were used. Both techniques are
considered to be almost a total digest apart from certain refractory minerals not relevant to exploration
at Platinum Springs.
For geophysical tools, spectrometers, handheld XRF instruments, etc, the
parameters used in determining the analysis including instrument make
and model, reading times, calibrations factors applied and their derivation,
etc.
N/A
Nature of quality control procedures adopted (e.g. standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels of
accuracy (i.e. lack of bias) and precision have been established.
Field duplicates: 1 in every 50 samples. Standards 1 in 50 samples. Blanks 1 in 100 samples. In addition,
standards, duplicates and blanks were inserted by the analytical laboratory at industry standard
intervals.
The verification of significant intersections by either independent or
alternative company personnel.
The results have not been verified by independent or alternative companies. This is not required at this
stage of exploration.
Criteria
Location of data points
JORC Code explanation
The use of twinned holes.
N/A
Documentation of primary data, data entry procedures, data verification,
data storage (physical and electronic) protocols.
Primary assay data for drill assays has been received digitally from the laboratory then later combined
with hole numbers and depths by Impact into a standard Excel templates for plotting in Mapinfo,
Geosoft Target and Leapfrog. Original pdf laboratory assay certificates are saved for verification when
required.
Discuss any adjustment to assay data.
There are no adjustments to the assay data.
Accuracy and quality of surveys used to locate drillholes (collar and downhole surveys), trenches, mine workings and other locations used in Mineral
Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Data spacing and distribution
Commentary
Drill holes were located by hand held GPS.
The grid system for Broken Hill is MGA_GDA94, Zone 54.
Standard government topographic maps have been used for topographic validation.
Data spacing for reporting of Exploration Results.
RC drill holes are drilled at varying spacings, orientations and depths deemed appropriate for early stage
exploration
Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and classifications
applied.
Estimations of grade and tonnes have not yet been made.
Whether sample compositing has been applied.
Sample compositing was done for samples outside the target ultramafic unit. This was done to provide
geochemical data that may help vector towards ore.
Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering the
deposit type.
The orientation of mineralisation is yet to be determined. A 3D review of the mineralisation is currently
underway to better interpret the orientation of mineralisation and assist follow-up drilling.
If the relationship between the drilling orientation and the orientation of
key mineralised structures is considered to have introduced a sampling
bias, this should be assessed and reported if material.
Not relevant to early stage exploration drill results. No sampling bias has been detected.
Sample security
The measures taken to ensure sample security.
Chain of custody is managed by Impact Minerals Ltd. A courier is contracted by Impact Minerals to
transport the samples from Broken Hill to the Intertek laboratory in Alice Springs for preparation and
then sent to Intertek in Perth for assay. Whilst in storage, they are kept in a locked yard. Tracking sheets
have been set up to track the progress of batches of samples.
Audits or reviews
The results of any audits or reviews of sampling techniques and data.
At this stage of exploration, a review of the sampling techniques and data by an external party is not
warranted.
Orientation of data in relation
to geological structure
SECTION 2 REPORTING OF EXPLORATION RESULTS
Criteria
Mineral tenement and land
tenure status
JORC Code explanation
Commentary
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint ventures,
partnerships, overriding royalties, native title interests, historical sites,
wilderness or national park and environmental settings.
The Broken Hill Project currently comprises 8 exploration licences covering 825 km2. The tenements are
held 100% by Impact Minerals Limited. No aboriginal sites or places have been declared or recorded
over the licence area. There are no national parks over the licence area.
The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
The tenements are in good standing with no known impediments.
Exploration done by other
parties
Acknowledgment and appraisal of exploration by other parties.
Previous work has been reported where required in accordance with the JORC Code in reports referred
to in the text.
Geology
Deposit type, geological setting and style of mineralisation.
Nickel-copper-PGE sulphide mineralisation associated with an ultramafic intrusion.
Drill hole Information
A summary of all information material to the understanding of the
exploration results including a tabulation of the following information for
all Material drill holes:
•
easting and northing of the drill hole collar
•
elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
•
dip and azimuth of the hole
•
down hole length and interception depth
•
hole length.
See Table details within the main body of this ASX Release.
In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (e.g. cutting of high grades)
and cut-off grades are usually Material and should be stated.
All reported assays have been length weighted. No top cuts have been applied. A minimum grade of
100 ppb 3PGE has been used.
Where aggregate intercepts incorporate short lengths of high grade
results and longer lengths of low grade results, the procedure used for
such aggregation should be stated and some typical examples of such
aggregations should be shown in detail.
High grade semi-massive and vein-style sulphide intervals internal to broader zones of disseminated
sulphide mineralisation are reported as included intervals.
The assumptions used for any reporting of metal equivalent values should
be clearly stated.
No metal equivalents have been reported.
Data aggregation methods
Relationship between
mineralisation widths and
intercept lengths
These relationships are particularly important in the reporting of
Exploration Results.
If the geometry of the mineralisation with respect to the drill hole angle is
known, its nature should be reported.
If it is not known and only the down hole lengths are reported, there
should be a clear statement to this effect (e.g. ‘down hole length, true
width not known’).
The orientation of mineralisation is yet to be determined. A 3D review of the mineralisation is currently
underway to better interpret the orientation of mineralisation and assist follow-up drilling.
Criteria
Diagrams
Balanced reporting
JORC Code explanation
Commentary
Appropriate maps and sections (with scales) and tabulations of intercepts
should be included for any significant discovery being reported These
should include, but not be limited to a plan view of drill hole collar
locations and appropriate sectional views.
Refer to Figures in body of text.
Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades and/or
widths should be practiced to avoid misleading reporting of Exploration
Results.
All results reported are representative
Other substantive exploration
data
Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical survey
results; geochemical survey results; bulk samples – size and method of
treatment; metallurgical test results; bulk density, groundwater,
geotechnical and rock characteristics; potential deleterious or
contaminating substances.
Further work
The nature and scale of planned further work (e.g. tests for lateral
extensions or depth extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of possible extensions, including
the main geological interpretations and future drilling areas, provided this
information is not commercially sensitive
Assessment of other substantive exploration data is not yet complete however considered immaterial at
this stage.
Follow up work programmes will be subject to interpretation of results which is ongoing. A 3D review of
the mineralisation is currently underway to better interpret the orientation of mineralisation and assist
follow-up drilling.