Exploration Update - Commonwealth Drill Programme
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
Date: 21 June 2016
Number: 475/210616
EXPLORATION UPDATE
Commonwealth Drill Programme
A major drill programme is underway at Impact Minerals Limited (ASX:IPT) 100% owned
Commonwealth Project 95 km north of Orange in New South Wales (Figure 1).
The programme, which will comprise up to 3,000 m of reverse circulation (RC) and diamond drilling, is
testing a significant number of targets that have been identified by Impact at four prospects: the
Commonwealth deposit, Silica Hill, Welcome Jack and Doughnut (Figure 1).
The targets were identified in geological, geochemical and geophysical data sets collected and compiled
over the past 12 to 18 months and in particular as areas of variably overlapping gravity, Induced
Polarisation (IP) and soil geochemistry anomalies. The targets are described in detail in announcements
dated 5 April, 18 April, 26 April and 5 May 2016.
Five diamond drill holes have now been completed: three at Commonwealth South and two at Silica Hill
with one in progress. In addition five reverse circulation drill holes have been completed; three at
Welcome Jack, one at Main Shaft and one at Commonwealth South in addition to several pre-collars for
further diamond drill holes.
The RC hole at Main Shaft intersected 6 metres of massive sulphide and has confirmed a down-plunge
extension of the high grade part of the Commonwealth deposit. All other completed holes have intersected
vein and disseminated sulphide mineralisation over widths varying from a few metres up to ten metres
and which is visually similar to the precious and base metal mineralisation seen in many previous holes at
Commonwealth.
First assays are expected later this week.
The drill programme has been on hold for three days and will not recommence until later this week
because of unsafe work conditions caused by the second bout of heavy rainfall that has affected much of
eastern Australia over the past few days.
26 Richardson Street West Perth Western Australia 6005
Tel +61 (8) 6454 6666 Facsimile +61 (8) 6454 6667
Email info@impactminerals.com.au www.impactminerals.com.au
Figure 1. Geology and location of the four priority prospects at the Commonwealth Project:
Commonwealth, Silica Hill, Welcome Jack and Doughnut.
Investment by Squadron Resources Pty Limited
The Commonwealth gold-silver-zinc-lead project and also Impact’s Broken Hill platinum-copper-nickel
project are part of the investment agreement between Impact Minerals and Squadron Resources Pty Ltd,
part of the Minderoo Group which represents the philanthropic and business interests of Andrew and
Nicola Forrest (see announcement 17 July 2015).
As part of the investment agreement, Squadron at its sole discretion, can invest a further A$1 million into
either or both of the projects to earn a 19.9% interest after Impact has spent a combined total of
$2.5 million on them.
It is anticipated that Impact will meet the $2.5 million expenditure target in the September Quarter 2016.
Dr Michael G Jones
Managing Director
The review of exploration activities and results contained in this report is based on information compiled by Dr Mike Jones, a Member
of the Australian Institute of Geoscientists. He is a director of the company and works for Impact Minerals Limited. He has sufficient
experience which is relevant to the style of mineralisation and types of deposits under consideration and to the activity which he is
undertaking to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves (the JORC Code). Mike Jones has consented to the inclusion in the report of the matters
based on his information in the form and context in which it appears.
APPENDIX 1 - SECTION 1 SAMPLING TECHNIQUES AND DATA
Criteria
JORC Code explanation
Commentary
Nature and quality of sampling (e.g. cut channels, random chips,
or specific specialised industry standard measurement tools
appropriate to the minerals under investigation, such as down
hole gamma sondes, or handheld XRF instruments, etc). These
examples should not be taken as limiting the broad meaning of
sampling.
Rock chip samples
Random grab samples were taken at surface which represented favourable geology and alteration to known mineralisation in the
region. Samples are variably weathered.
Soil Samples
About 250g of soil was taken from 15-20cm below surface and sieved to - 2mm size. Samples put in plastic snap seal bags.
Samples were subsequently sieved to -250 micron at SGS Laboratories for assay by aqua regia digest.
RC Drilling
Reverse Circulation (RC) percussion drilling was used to produce a 1m bulk sample (~25kg) which was collected in plastic bags and
representative 1m split samples (12.5%, or nominally 3kg) were collected using a riffle splitter and placed in a calico bag. The
cyclone was cleaned out with compressed air at the end of each hole and periodically during the drilling. Holes were drilled to
optimally intercept interpreted mineralised zones.
Diamond Drilling
Diamond drilling was used to produce drill core either with a diameter of 63.5 mm (HQ) or 47.6 mm (NQ).
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used
Rock chip samples
Representative samples at each sample site weigh between 0.8 and 1.2 kg. Sample sites were chosen due to historic rock and soil
assay results and the geophysical surveys conducted on the Commonwealth Project. Historic rock sample methods are unknown
but are considered immaterial.
Soil Samples and Drill Samples
Sample representivity was ensured by a combination of Company Procedures regarding quality control (QC) and quality assurance
/ testing (QA).
Examples of QC include (but are not limited to), daily workplace and equipment inspections, as well as drilling and sampling
procedures.
Examples of QA include (but are not limited to) collection of “field duplicates”, the use of certified standards and blank samples
approximately every 50 samples
Sampling techniques
Criteria
Drilling techniques
Drill sample recovery
JORC Code explanation
Commentary
Aspects of the determination of mineralisation that are Material
to the Public Report. In cases where ‘industry standard’ work has
been done this would be relatively simple (e.g. ‘reverse circulation
drilling was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other cases
more explanation may be required, such as where there is coarse
gold that has inherent sampling problems. Unusual commodities
or mineralisation types (e.g. submarine nodules) may warrant
disclosure of detailed information
Rock chip samples
Rock samples were sent to SGS Perth where they were crushed, dried and pulverised (total prep) to produce a 25-30 g subsamples for analysis initially by Aqua Regia digest with ICP-MS finish for base metals then by four acid digest with an ICP/AES
finish for ore grade base metal samples and lead collection fire assay with AAS finish for gold.
Soil Samples
Soil samples were sent to ACME Laboratories in Vancouver for analysis by aqua regia digest or to SGS Laboratories in Perth for
analysis by the MMI digest.
RC and diamond drill samples
RC samples and cut samples of core were submitted to ALS in Orange, NSW. Laboratory sample preparation involved: sample
crushed to 70% less than 2mm, riffle/rotary split off 1 kg, pulverise split to >85% passing 75 microns.
RC samples analysed by MEICP41 or MEOG46 for ore grade samples, aqua regia digest with ICP OES analysis and AA24 fire assay
with AAS finish.
Historical diamond and RC samples were sent to Fox Anamet, Brookvale NSW where gold was determined by fire assay, base
metals by DCP and AAS methods.
Weathered samples contained gossanous sulphide material and fresh samples containing visible pyrite, galena, sphalerite and
chalcopyrite.
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary
air blast, auger, Bangka, sonic, etc) and details (e.g. core
diameter, triple or standard tube, depth of diamond tails, facesampling bit or other type, whether core is oriented and if so, by
what method, etc).
Diamond drilling accounts for about 50 % of the drilling and comprises NQ (47.6 mm diameter) and HQ (63.5 mm diameter) sized
core. Impact diamond core is triple tube and is oriented. Historical diamond core was not oriented.
RC drilling accounts for about 50% of the drilling and comprises 4 inch hammer.
Method of recording and assessing core and chip sample
recoveries and results assessed
Diamond core recoveries for all holes are logged and recorded. Recoveries are estimated to be approximately >97% for the
Commonwealth Project. No significant core loss or sample recovery problems are observed in the drill core or historic reports. RC
samples were visually checked for recovery, moisture and contamination.
Diamond core is reconstructed into continuous runs on an angle iron cradle for orientation marking. Depths are checked against
the depth given on the core blocks and rod counts are routinely carried out by the driller.
Measures taken to maximise sample recovery and ensure
representative nature of the samples
Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
The RC samples are collected by plastic bag directly from the rig-mounted cyclone and laid directly on the ground in rows of 10.
The drill cyclone and sample buckets are cleaned between rod-changes and after each hole to minimise down-hole and/or cross
contamination.
No sample bias has been established.
Criteria
JORC Code explanation
Logging
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
Commentary
Geological logging of samples followed company and industry common practice. Qualitative logging of samples included (but not
limited to); lithology, mineralogy, alteration, veining and weathering. Diamond core logging included additional fields such as
structure and geotechnical parameters.
Magnetic Susceptibility measurements were taken for each 1m RC sample and each 1m diamond core interval.
For diamond core, information on structure type, dip, dip direction, texture, shape and fill material has been recorded in the logs.
RQD data has been recorded on selected diamond holes. Handheld XRF analysis was completed at 50 cm and 1 m intervals on
diamond core and for every metre for RC samples.
All logging is quantitative, based on visual field estimates. Systematic photography of the diamond core in the wet and dry form
was completed.
Chip trays with representative 1m RC samples were collected and photographed then stored for future reference.
All diamond drill holes were logged in full.
The total length and percentage of the relevant intersections
logged
All RC chips samples were geologically logged by Impact’s on-site geologist on a 1m basis, with digital capture in the field.
Detailed diamond core logging, with digital capture was conducted for 100% of the core by Impact’s on-site geologist.
Sub-sampling
techniques and
sample preparation
If core, whether cut or sawn and whether quarter, half or all core
taken.
All core samples were sampled by half core. Selected intervals of quarter core will be selected for check assays if required.
If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
RC samples were split using a riffle splitter.
For all sample types, the nature, quality and appropriateness of
the sample preparation technique.
Company procedures were followed to ensure sub-sampling adequacy and consistency. These included (but were not limited to),
daily work place inspections of sampling equipment and practices, as well as sub-sample duplicates (“field duplicates”).
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Laboratory QC procedures for rock sample assays involve the use of internal certified reference material as assay standards, along
with blanks, duplicates and replicates.
The QC procedure for historical diamond and RC samples is unknown but is assumed to have been minimal; however, the impact
of historical samples has been somewhat mitigated by recent drilling.
Measures taken to ensure that the sampling is representative of
the in situ material collected, including for instance results for
field duplicate/second-half sampling.
Sample duplicates from the historical drilling were taken from selected intervals and compared to the original assay. Quarter core
was taken for diamond samples and riffle resplits for RC samples.
Whether sample sizes are appropriate to the grain size of the
material being sampled.
The samples sizes at Commonwealth are considered appropriate since gold has been identified as predominantly fine-grained by
thin section analysis which would indicate the nugget effect is minimal.
Criteria
Quality of assay data
and laboratory tests
JORC Code explanation
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
For geophysical tools, spectrometers, handheld XRF instruments,
etc, the parameters used in determining the analysis including
instrument make and model, reading times, calibrations factors
applied and their derivation, etc.
Commentary
An industry standard fire assay technique for samples using lead collection with an Atomic Absorption Spectrometry (AAS) finish
was used for gold and aqua regia digest for base metals and silver.
The quality of historical drill sample assays is unknown; however it is reasonable to assume that core samples were
representative of the mineralisation.
No geophysical tools were used to determine material element concentrations. A handheld XRF was used for qualitative analysis
only.
For the rock chips, quality control procedures for assays were followed via internal laboratory protocols. Accuracy and precision
are within acceptable limits.
Nature of quality control procedures adopted (e.g. standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of bias) and precision have
been established.
Reference standards and blanks are routinely inserted into every batch of samples at a rate of 1 in every 25 samples in the Impact
drilling. Impact’s inserted standards in general showed results within expected ranges. The calculated means for Lab standards
are very close to expected for the majority of standards and are within industry expectations.
Laboratoy repeat checks and original samples correlated very well.
There is minimal quality control of historical drill sample assays. Twin holes have been drilled to verify historical drilling.
The QAQC results indicate that the assays used for resource estimation are a fair representation of the material that has been
sampled.
Verification of
sampling and assaying
Location of data
points
The verification of significant intersections by either independent
or alternative company personnel.
Significant intersections from drilling have not been verified by independent or alternative companies or by Impact.
The use of twinned holes.
Two twin diamond holes versus historic RC holes have been drilled at Commonwealth South and Main Shaft.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Primary assay data for rock chips has been entered into standard Excel templates for plotting in Mapinfo and Target. All historical
drill data has been entered digitally by previous explorers and verified internally by Impact.
Discuss any adjustment to assay data.
No significant adjustments have been required.
Accuracy and quality of surveys used to locate drillholes (collar
and down-hole surveys), trenches, mine workings and other
locations used in Mineral Resource estimation.
Specification of the grid system used.
Recent drill holes have been located by DGPS. Historical drill holes and mine shafts have been verified by DGPS.
The grid system for Commonwealth is MGA_GDA94, Zone 55.
Criteria
JORC Code explanation
Commentary
Standard government topographic maps have been used for topographic validation. The DGPS is considered sufficiently accurate
for elevation data.
Quality and adequacy of topographic control.
For the diamond holes, down-hole single shot surveys were conducted by the drilling contractor. Surveys were conducted at 6m,
18, 30m and then approximately every 30m down-hole.
For the RC drill holes, downhole dip surveys were taken at approximately 30m intervals and at the bottom of the hole.
Data spacing and
distribution
Data spacing for reporting of Exploration Results.
Drill spacing of drill holes ranges between 10 and 30 m which is considered adequate for Exploration Results.
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied.
Spacing of drill holes ranges between 10 m and 50 m on section and are considered adequate for Mineral Resource estimation
procedures.
Whether sample compositing has been applied.
Sample compositing has been applied for quoting drill composite results only.
Whether the orientation of sampling achieves unbiased sampling
of possible structures and the extent to which this is known,
considering the deposit type.
Drilling is oriented sub-perpendicular to the mineralised trend and stratigraphic contacts as determined by field data and cross
section interpretation.
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to have
introduced a sampling bias, this should be assessed and reported
if material.
No significant sample bias has been identified from drilling due to the optimum drill orientation described above. Where present,
sample bias will be reported.
Sample security
The measures taken to ensure sample security.
For rock samples, chain of custody is managed by Impact Minerals Ltd. Samples for Commonwealth are delivered by Impact
Minerals Ltd personnel to ALS in Orange, NSW or to SGS Perth for prep and assay. Whilst in storage, they are kept in a locked
yard. Tracking sheets have been set up to track the progress of batches of samples.
Security of historic drill samples is unknown however is considered immaterial.
Audits or reviews
The results of any audits or reviews of sampling techniques and
data.
A review of the sampling techniques and data both of historic drill holes and of Impact’s procedures has been completed by
Optiro Consultants of Perth, WA.
Orientation of data in
relation to geological
structure
SECTION 2 REPORTING OF EXPLORATION RESULTS
Criteria
JORC Code explanation
Commentary
Mineral
tenement
and
land
tenure
status
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
The Commonwealth Project currently comprises 3 exploration licences covering 315 km 2. The tenements are held 100% by
Endeavour Minerals Pty Ltd, a subsidiary company of Impact Minerals Limited. No aboriginal sites or places have been
declared or recorded in areas where Impact is currently exploring. There are no national parks over the license area.
The security of the tenure held at the time of reporting along
with any known impediments to obtaining a licence to operate in
the area.
The tenements are in good standing with no known impediments.
Acknowledgment and appraisal of exploration by other parties.
A total of 66 drillholes have been completed over 300 m strike between the Commonwealth main shaft and Commonwealth
South by previous explorers to an average depth of 53 m.
Deposit type, geological setting and style of mineralisation.
The Commonwealth and Commonwealth South deposits are considered gold-rich volcanic hosted massive sulphide (VMS)
deposits that occur at and below the contact with a porphyritic rhyolite and overlying volcanic sedimentary rocks. The
mineralisation may have been overprinted by epithermal mineralisation.
Exploration done by
other parties
Geology
Drill hole Information
Data aggregation
methods
A summary of all information material to the understanding of
the exploration results including a tabulation of the following
information for all Material drill holes:
easting and northing of the drill hole collar
elevation or RL (Reduced Level – elevation above sea
level in metres) of the drill hole collar
dip and azimuth of the hole
down hole length and interception depth
hole length.
A tabulation of this information is considered not material for this inferred mineral resource.
In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (e.g. cutting of
high grades) and cut-off grades are usually Material and should
be stated.
All reported assays have been length weighted. No top cuts have been applied in the reporting of the drill assays. A nominal
cut-off of approximately 0.5 g/t Au has been applied.
Where aggregate intercepts incorporate short lengths of high
grade results and longer lengths of low grade results, the
procedure used for such aggregation should be stated and some
typical examples of such aggregations should be shown in detail.
High grade massive sulphide intervals internal to broader zones of disseminated sulphide mineralisation are reported as
included intervals.
The assumptions used for any reporting of metal equivalent
values should be clearly stated.
Gold equivalent values have been used in the long section and in the resource calculation. Australian metal prices used for
the gold equivalent were $1,580/oz gold, $22/oz silver, $2,740/t zinc, $2,396/t lead and $7,320/t copper. Given the high
grade results, it is assumed that very high recoveries will be achieved. However no metallurgical studies have been completed
to verify this. Such studies will be done as and when appropriate.
Criteria
JORC Code explanation
Relationship between
mineralisation widths
and intercept lengths
These relationships are particularly important in the reporting of
Exploration Results.
If the geometry of the mineralisation with respect to the drill hole
angle is known, its nature should be reported.
If it is not known and only the down hole lengths are reported,
there should be a clear statement to this effect (e.g. ‘down hole
length, true width not known’).
Diagrams
Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view
of drill hole collar locations and appropriate sectional views.
Refer to figures in body of text.
Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades
and/or widths should be practiced to avoid misleading reporting
of Exploration Results.
All results reported are representative
Balanced reporting
Other substantive
exploration data
Further work
Other exploration data, if meaningful and material, should be
reported including (but not limited to): geological observations;
geophysical survey results; geochemical survey results; bulk
samples – size and method of treatment; metallurgical test
results; bulk density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating
substances.
Commentary
Historical drill holes to date have been sub-perpendicular to the mineralised trend and stratigraphy so intervals are close to
true width or otherwise stated.
Assessment of other substantive exploration data is not yet complete however, it is not considered material at this stage to a
Mineral Resource Estimate.
The nature and scale of planned further work (e.g. tests for
lateral extensions or depth extensions or large-scale step-out
Follow up work programmes will be subject to interpretation of recent and historic results which is ongoing.
drilling).
Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling
areas, provided this information is not commercially sensitive
SECTION 3 ESTIMATION AND REPORTING OF MINERAL RESOURCES
Criteria
Database integrity
JORC Code explanation
Commentary
Measures taken to ensure that data has not been corrupted by,
for example, transcription or keying errors, between its initial A visual comparison is completed between assay results and original logs (if hand drawn/logged) and detailed print outs and
collection and its use for Mineral Resource estimation down hole logs for each hole. All errors are corrected.
purposes.
Data validation procedures used.
Site visits
Comment on any site visits undertaken by the Competent
Person and the outcome of those visits.
Impact’s database has industry standard protocols to ensure that only valid data is accepted. For example, only geological
codes that form part of the Impact logging code system can be accepted into the database.
The geology competent person, Dr Mike Jones has been with Impact since its inception and is closely involved in the
Commonwealth project. He was present during a significant part of the drill programme and helped supervise the geological
interpretation of the deposit. The majority of the work was compiled by Mr Leo Horn who is also a Competent Person for the
reporting of Exploration Results and has been responsible for all aspects of the exploration programmes at the
Commonwealth Project. The Competent Person for the Mineral Resource estimate, Mr Ian Glacken, has not visited site.
If no site visits have been undertaken indicate why this is the
case.
Geological
interpretation
Dimensions
Confidence in (or conversely, the uncertainty of) the geological
interpretation of the mineral deposit.
There is a high level of confidence in the geological interpretation due to the historical operating experience and the readily
identifiable stratigraphic control on mineralisation.
Wireframes are used to constrain the estimation and are based on drill hole intercepts and geological boundaries. All
wireframes are constructed to 0.5 g/t Au cut-off grades for shape consistency.
Nature of the data used and of any assumptions made.
The mineralisation is generally quite consistent and drill intercepts clearly define the shape of the mineralised body with
limited options for large scale alternate interpretations.
The effect, if any, of alternative interpretations on Mineral
Resource estimation.
The controls on and interpretation of mineralisation is relatively straightforward and no alternative interpretations have been
considered.
The use of geology in guiding and controlling Mineral Resource
estimation.
Wireframes are used to constrain the estimation and are based on drill hole intercepts and geological boundaries.
The factors affecting continuity both of grade and geology.
Wireframes are constructed to 0.5 g/t Au cut-off grade for shape consistency.
The extent and variability of the Mineral Resource expressed as
length (along strike or otherwise), plan width, and depth below
surface to the upper and lower limits of the Mineral Resource
The mineral resource at Commonwealth comprises two main areas, being Main Shaft and Commonwealth South, which have a
total strike length of 400 m and extend vertically for approximately 120 m below surface. Main Shaft has been historically
mined from surface to 40 m below surface.
Criteria
Estimation and
modelling techniques
JORC Code explanation
The nature and appropriateness of the estimation technique(s)
applied and key assumptions, including treatment of extreme
grade values, domaining, interpolation parameters and
maximum distance of extrapolation from data points. If a
computer assisted estimation method was chosen include a
description of computer software and parameters used.
Commentary
Grade estimation using Ordinary Kriging (OK) was completed using Datamine software for six elements; Au, Ag, Cu, Pb, Zn and
As. Drill grid spacing was between 10 m and 30 m.
Variogram orientations were largely controlled by the strike of mineralisation and downhole variography. Variograms for
estimation were determined individually for each element.
Other estimation parameters, such as search distance, minimum and maximum sample numbers was derived from KNA.
Search distances varied depending on the element being estimated.
The availability of check estimates, previous estimates and/or
mine production records and whether the Mineral Resource
estimate takes appropriate account of such data.
There has been no previous resource estimation on the Commonwealth Project, hence no comparisons are available.
The assumptions made regarding recovery of by-products.
No assumptions have been made regarding recovery of any by-products.
Estimation of deleterious elements or other non-grade
variables of economic significance (e.g. sulphur for acid mine
drainage characterisation).
Arsenic was the only deleterious element estimated.
In the case of block model interpolation, the block size in
relation to the average sample spacing and the search
employed.
The resource model has not been compared to any reconciliation data.
The block model dimensions and parameters were based on the geological boundaries and average drill grid