DECEMBER 2021 QUARTERLY REPORT
1.
ARKUN Ni-Cu-PGM PROJECT, WA (IPT 100%)
Issued Capital
• Numerous high priority targets for Rare Earth Elements (REE) and
rubidium identified in soil geochemistry data at the 1,900 sq km Arkun
Project about 150 km east of Perth.
• The soil anomalies occur over significant areas of many hundreds of
metres along individual reconnaissance soil geochemistry traverses.
• The REE comprise both heavy and light rare earth elements including the
valuable elements neodymium, praseodymium, dysprosium, terbium,
ytterbium, cerium and lanthanum.
• No previous REE or rubidium exploration in the region.
• Arkun increasingly recognised as a highly prospective part of the
emerging mineral province of SW Western Australia with the additional
recent identification of significant targets for nickel-copper-PGM
mineralisation and lithium-caesium-tantalum (LCT) pegmatites,
• Land access negotiations to commence as soon as practicable.
2,023,794,919
Directors
Peter Unsworth
Chairman
Dr. Michael Jones
Managing Director
Paul Ingram
Non-Executive Director
Dr. Markus Elsasser
Non-Executive Director
2.
EXPANSION OF WA PROJECT PORTFOLIO
• Impact to earn an 80% interest in four joint venture projects: Jumbo,
Narryer, Dalgaranga and Hopetoun, covering almost 1,000 square
kilometres and prospective for nickel-copper-PGM, lithium and other
metals.
3.
Dr. Frank Bierlein
Non-Executive Director
Bernard Crawford
Company Secretary
HOPETOUN PROJECT
• Thick alteration zone with abundant pyrite sulphide over four metres at
end-of-hole intersected in RC Drilling of a copper-gold target.
• Extremely difficult drilling conditions precluded the continuation of RC
drilling. A diamond drill rig is being sourced for follow up work in 2022.
4.
BROKEN HILL PROJECT
• Joint venture with IGO who can spend $18 million over 8 years to earn a
75% interest in EL7390 and EL8234 in two stages: $6 million to earn a
51% interest and a further $12 million to earn a further 24% interest.
• Minimum expenditure of $500,000 before withdrawal.
5.
CORPORATE
• Dr Frank Bierlein appointed as non-executive Director.
• $1.5 million cash as at 31st December 2021
a 26 Richardson Street
West Perth
Western Australia 6005
t +61 (8) 6454 6666
f +61 (8) 6314 6670
e info@impactminerals.com.au
www.impactminerals.com.au
1.
ARKUN PROJECT, WA (IPT 100%)
The Arkun Project, which covers about 1,900 square kilometres, is centred between York and Corrigin
130 km east of Perth and was staked following the recent significant PGM discovery at Julimar just
75 km north east of Perth by Chalice Mining Ltd (ASX:CHN) (Figure 1 and ASX Release 29th May
2020). Impact is one of the larger ground holders in the region.
During the Quarter further interpretation of assay results from a soil geochemistry survey covering 15
priority targets across the Arkun project identified a significant number of high priority targets for
Rare Earth Elements (REE) and rubidium (ASX Release 27th October 2021).
Previous target generation work by Impact using proprietary geophysical interpretations and models,
had identified 17 priority targets across the Arkun project area, principally for Ni-Cu-PGM
mineralisation (ASX Release 10th June 2021). Fifteen of these targets were covered by a single soil
geochemistry traverse up to several kilometres long along gazetted roads and tracks with soil samples
taken at 100 metre spacings along the traverses. Each traverse was long enough to extend well away
from the target area into areas of “background” in order to establish the relative anomalism of the
various metals in the target above background
The soil survey identified numerous priority targets for both Ni-Cu-PGE and, also unexpectedly,
lithium pegmatite mineralisation (ASX Release 21st September 2021).
Figure 1. Location and Regional Geology of the Arkun Project, showing key nickel-copper-PGE deposits and
recent discoveries. Note the large tenement holdings of Anglo American Corporation who applied for the
ground on the same day of Impact’s first announcement about Arkun.
2|Page
Further interpretation of the soil assay data has now also identified numerous target areas for REE and
rubidium mineralisation that warrant follow up work. Further details on some of the priority targets
identified and the sampling and analytical techniques used can be found in the ASX Release
27th October 2021.
1.1 Rare Earth Element Results
The results for all 15 of the REE are shown as an additive Z score in Figure 2. The REE comprise:
lanthanum, cerium, praseodymium, neodymium, promethium, samarium, europium, gadolinium,
terbium, dysprosium, holmium, erbium, thulium, ytterbium, and lutetium.
It is evident that the central part of the Arkun project area stands out as being strongly anomalous in
the REE and six high priority targets and have been identified as warranting follow up work.
Numerous other areas of anomalism are also present.
Of note is that the targets are generally anomalous in both the light and the more valuable heavy REE
(ASX Release 27th October 2021).
This is a very exciting outcome for Impact and supports the Company’s original contention that the
Arkun area is a highly prospective part of the Yilgarn Craton (Figure 1).
Three priority areas, R1 to R3 are shown in more detail in Figure 4. The soil anomalies all cover
extensive areas and occur within larger magnetic granites.
R2
R3
R1
Figure 2. Additive Z scores for REE across the Arkun project. Note the large areas of anomalism in the central
part of the project area. Seven priority areas for follow up work are highlighted. Other areas of elevated
response are also evident.
3|Page
1.2 Rubidium Results
The results for rubidium are shown in Figure 3. Numerous areas stand out as being strongly
anomalous and four high priority targets have been identified for follow up work. Two of these areas,
Rb1 and Rb2, are shown in more detail in Figure 5. Numerous other areas with anomalous rubidium
results are also evident (Figure 3).
Rb1
Rb2
Figure 3. Ionic leach results for rubidium. Four priority areas for follow up work are highlighted. Other areas of
elevated response are also evident. Note that the low absolute levels of rubidium are a function of the very
dilute nature of the chemical digest used in the Ionic Leach assay method.
1.3. Discussion and Next Steps
The results of Impact’s first ever soil geochemistry programme at Arkun have outlined a significant
number of areas for follow up work for a wide range of commodities: nickel-copper-PGM; lithium
LCT pegmatites; REE and rubidium,
Follow-up field checking and sampling will continue with the aim of prioritising areas for more
detailed soil geochemistry and ground geophysical surveys that will extend away from the roads and
into the surrounding paddocks.
In order to explore in the paddocks, land access agreements will be required with the relevant land
owners and this process has commenced.
4|Page
R1 R1
R2
R2
R3
Figure 4. Priority Targets for REE shown on images of regional magnetic data. Strongly elevated soil
geochemistry responses extend over distances of many hundreds of metres and are mainly associated with the
magnetic units with larger granite bodies.
Rb1
Rb2
Figure 5. Priority Targets for rubidium shown on images of regional magnetic data. Numerous areas of strongly
elevated values for rubidium above background are evident.
5|Page
2.
EXPANSION OF WESTERN AUSTRALIAN PROJECT PORTFOLIO (IPT 80%)
During the Quarter Impact significantly increased its ground holdings for Ni-Cu-PGM and other metals in
Western Australia through four joint venture agreements on projects in very prospective parts of the state
(ASX Release 8th December 2021).
The joint ventures, which were identified with private groups, all contain untested geophysical and
geochemical targets in emerging prospective terranes across Western Australia.
2.1 Jumbo
The Jumbo project comprises one tenement (E70/5852) covering 360 square kilometres and is adjacent to
Impact’s Arkun project centred about 150 km south east of Perth (Figure 6).
The project contains many of the same geological features and extensions of the same structures as those
considered prospective at Arkun and is therefore a natural addition to Impact’s large strategic ground
holding in this very under explored part of Western Australia.
2.2 Narryer
The Narryer project comprises two tenements (E52/3967 and E52/3985) covering 405 square kilometres
in the Narryer Terrane on the north western margin of the Yilgarn Craton (Figure 6). This Terrane has
become the focus of a surge in exploration for Ni-Cu-PGM following the Julimar discovery as well as
Rare Earth Elements. Other companies active in the area include Chalice Mining Ltd (ASX:CHN),
Krakatoa Resources Ltd (ASX:KTA), Rarex Ltd (ASX:REE) and Desert Metals Ltd (ASX:DM1).
The Narryer Project contains several untested magnetic and other geophysical anomalies that require
follow up work.
2.3 Dalgaranga
The Dalgaranga Project comprises one tenement (E59/2620) covering 150 square kilometres along the
western margin of the Dalgaranga greenstone belt (Figure 6) which contains the dormant Western Queen
open pits as well as the dormant Dalgaranga tantalum mine now being explored by Krakatoa Resources
Ltd. The project is prospective for Ni-Cu-PGM’s and pegmatite dykes. Rio Tinto Exploration recently
pegged the eastern side of the same greenstone belt.
2.4 Hopetoun
The Hopetoun project comprises two tenements (E74/563 and E74/679) covering 75 square kilometres
and is located just north of the town of Hopetoun, close to the Ravensthorpe mining centre (Figure 6). The
project covers part of the Albany Fraser Mobile Belt which is considered prospective for a variety of
mineral deposits. The project contains at least five drill ready targets for base and precious metals of
which two were fully permitted for drilling as described in the next section.
The terms of the joint ventures, which are with private companies unrelated to Impact, are summarised in
in the Company’s ASX Release of 8th December 2021. Impact is earning an 80% interest in all four
projects.
6|Page
Figure 6. Location of Impact’s projects in Western Australia with the new projects shown in yellow.
7|Page
3.
HOPETOUN PROJECT (IPT earning 80%)
One of the targets at the Hopetoun Project, Top Knotch, is a significant copper-gold target identified in
geophysical and soil geochemistry data which was fully permitted for drilling. By coincidence the RC
drill rig that Impact had booked for the company’s Doonia project was working near to Hopetoun and
so a decision was made to drill the Hopetoun target first.
A four metre thick zone of pyrite was intersected at the very end of one of the drill holes within a zone
of extensive potassic alteration with variable low level copper that is at least 75 metres thick (Figure 7
and ASX Release 20th December 2021).
Figure 7. Cross section from the Top Knotch Prospect with sub horizontal alteration and copper zones which
are increasing in intensity down hole.
The alteration (K-feldspar and biotite), copper values (up to 250 ppm as measured with a hand held
XRF instrument) and sulphide intensity all increase down hole, are open at depth and along trend and
suggest that the drill may have stopped at the edge of a large mineralised system (Figure 7).
The drill hole (HPIPT004) failed to reach its target depth of at least 150 metres below surface because
of unexpected very difficult drilling conditions for the RC drill rig caused by running sands that
blocked the drill rods in younger cover rocks that overlie the target Proterozoic basement rocks.
The hole was the fourth attempt to reach the target depth and it was deemed unsafe and potentially
very expensive to continue the programme (Figure 7). Accordingly the RC programme was curtailed
and efforts are now underway to secure a diamond drill rig to undertake follow up drilling as soon as
practicable
8|Page
4.
BROKEN HILL PROJECT
During the Quarter Impact announced that IGO Newsearch Pty Ltd, a 100% owned subsidiary of IGO
Limited (ASX:IGO) agreed to farm into the Company’s Broken Hill nickel-copper-platinum group metals
(PGM) project in New South Wales (Figure 8).
Previous work by Impact had established that a large amount of deep drilling will be required to further
explore the exciting prospects generated at Broken Hill and therefore it was appropriate that a well-funded
partner with excellent credentials was brought in to help fund what could be quite significant expenditures
going forward. Impact is pleased to have the joint venture with IGO, one of Australia’s most outstanding
exploration and mining companies.
Figure 8. Impact’s ground holdings around Broken Hill. EL7390 (blue) and EL8234 (green) are highlighted.
The principal terms of the deal, which applies only to EL7390 and EL8234, two of the 11 tenements that
comprise Impact’s holdings around Broken Hill are:
1. IGO can spend $6 million over four years to earn a 51% interest in the project (Stage 1 earn in).
An unincorporated joint venture between IGO and Impact will be formed at this time.
2. IGO can spend a further $12 million over a further four years to earn a 75% interest in the project
(Stage 2 earn in).
9|Page
3. After Stage 2 is complete, the parties can elect to contribute pro-rata or dilute. If one party’s
interest dilutes to less than 10% then its interest will convert to a 1% Net Smelter Royalty.
4. If, after completing Stage 1, IGO elects not to proceed to Stage 2 or, during Stage 2 does not meet
its expenditure requirements, IGO will revert to a 49% interest in the project giving Impact a
majority 51% interest.
5. A minimum expenditure of $500,000 in the first year is required. IGO can withdraw prior to the
minimum expenditure being reached by paying the lesser amount of either the balance of unspent
minimum expenditure or $200,000.
IGO has recently commenced a detailed ground electromagnetic (EM) geophysical survey using a deep
penetrating SQUID system over the entire joint venture area including the Moorkai Trend and the Little
Broken Hill Gabbro.
The Moorkai Trend is a nine kilometre long ultramafic to mafic dyke and chonolith complex that is very
poorly explored. Drilling by Impact at the southern end of the Trend has returned high grades of nickelcopper-PGM’s in the Platinum Springs area in a channel-like structure at the base of the ultramafic unit
(ASX Release 9th March 2021). There has been no drilling of significance along the rest of the Trend.
At the Little Broken Hill Gabbro, Impact completed the first ever drill programme across the sevenkilometre-long intrusion and identified numerous areas of highly anomalous nickel, copper and/or PGM’s
in the basal unit to the intrusion over several kilometres (ASX Release 15th April 2021).
Extensive further deep drilling is required at both prospects and the initial work by IGO will be aimed at
identifying specific EM targets that may represent targets for high grade massive sulphide deposits.
The farm-in applies only to two tenements, EL7390 and EL8234, of Impact’s extensive tenement holdings
at Broken Hill (Figure 8). The remaining tenements, which are all 100% owned by Impact, are
considered by Impact to be one of the most under explored parts of Australia given the long history of
mining at the nearby Broken Hill deposit itself.
There has been limited exploration for the best part of 30 years in the area and there is significant
potential on this ground for the discovery of major deposits of silver-lead-zinc and in particular copper.
The company is considering its options for progressing exploration on these tenements.
5.
OTHER ASSETS
As part of a rationalisation of Impact’s project portfolio in eastern Australia, the company sold two
tenements that were part of the Commonwealth Project (EL8632 and part of EL8505) to Orange
Minerals NL for $180,000 cash and 250,000 shares in Orange (ASX Release 4th February 2021).
Orange listed on the Australian Stock Exchange in December 2021 (ASX:OMX) with the shares
currently trading at about $0.16 per share. Impact’s shares are escrowed until October 2022.
In addition Impact still holds 1,000,000 shares in Australasian Metals Limited (ASX:A8G) which it
received for the sale of the Clermont gold project in Queensland at a nominal 10 cents per share. The
shares, which are escrowed until April, are currently trading at about $0.50 per share.
10 | P a g e
6.
CORPORATE
Appointment of New Non-Executive Director
Dr. Frank Bierlein was appointed to the Board of Impact during the Quarter. Dr Bierlein is a geologist
with 30 years experience as a consultant, researcher, lecturer and industry professional. He has held
exploration and generative geology management positions with QMSD mining Co. Ltd, Qatar Mining,
Afmeco Australia and Areva NC, and consulted to, among other, Newmont Gold, Resolute Mining,
Goldfields International, Freeport McMoRan and the International Atomic Energy Agency. He is
currently a non-executive Director of PNX Metals Limited and chaired the Advisory Board of a
Luxembourg-based private equity fund between 2014 and 2021.
Financial Commentary
The Quarterly Cashflow Report (Appendix 5B) for the current period provides an overview of the
Company’s financial activities.
Cash exploration expenditure for the current period was $0.6 million. Corporate and other expenditure
amounted to $310k. The total amount paid to directors of the entity and their associates in the period
(item 6.1 of the Appendix 5B) was $104k and includes salary, directors’ fees and superannuation.
Cash at December 31st 2021 was $1.5 million.
Dr Michael G Jones
Managing Director
Competent Persons Statement
Exploration Results
The review of exploration activities and results contained in this report is based on information compiled by Dr Mike Jones, a Member of the Australian
Institute of Geoscientists. He is a director of the Company and works for Impact Minerals Limited. He has sufficient experience which is relevant to the
style of mineralisation and types of deposits under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in
the 2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code). Dr Jones has
consented to the inclusion in the report of the matters based on his information in the form and context in which it appears.
Impact Minerals confirms that it is not aware of any new information or data that materially affects the information included in the previous market
announcements referred to and in the case of mineral resource estimates, that all material assumptions and technical parameters underpinning the estimates
continue to apply and have not materially changed.
11 | P a g e
Tenement Information in accordance with Listing Rule 5.3.3
Status
IPT Interest at start of
quarter
IPT Interest at end of quarter
EL5874
Granted
100%
100%
EL8212
Granted
100%
100%
EL8252
Granted
100%
100%
EL8504
Granted
100%
100%
EL8505
Granted
100%
100%
EL8632
Disposed
100%
-
EL7390
Granted
100%
100%
EL8234
Granted
100%
100%
EL8636
Granted
100%
100%
EL8674
Granted
100%
100%
EL8609
Granted
100%
100%
EL9036
Granted
100%
100%
EL9037
Granted
100%
100%
EL9115
Granted
100%
100%
EL9294
Granted
100%
100%
ELA6324
Application
-
-
EPM26806
Granted
100%
100%
ML2386
Granted
100%
100%
EPM27571
Granted
100%
100%
EPM27410
Granted
100%
100%
E70/5424
Granted
100%
100%
E70/5430
Granted
100%
100%
E70/5431
Granted
100%
100%
E70/5432
Granted
100%
100%
E70/5433
Granted
100%
100%
E70/5434
Granted
100%
100%
E70/5490
Granted
100%
100%
E70/5504
Granted
100%
100%
E70/5505
Granted
100%
100%
E70/5816
Granted
100%
100%
Granted
80%
80%
Project / Tenement ID
Commonwealth, NSW
Broken Hill, NSW
Black Ridge, Qld
Arkun, WA
Doonia, WA
E15/1790
12 | P a g e
Status
IPT Interest at start of
quarter
IPT Interest at end of quarter
Granted
-
80%
Application
-
80%
E52/3967
Application
-
80%
E52/3985
Application
-
80%
E74/563
Earning In
-
-
E74/679
Earning In
-
-
Project / Tenement ID
Jumbo, WA
E70/5852
Dalgaranga, WA
E59/2620
Narryer, WA
Hopetoun, WA
13 | P a g e
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
IMPACT MINERALS LIMITED
Quarter ended (“current quarter”)
ABN
52 119 062 261
Consolidated statement of cash flows
31 DECEMBER 2021
Current quarter
$A’000
Year to date
(6 months)
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
-
-
1.2
Payments for
-
-
(b) development
-
-
(c) production
-
-
(d) staff costs
(81)
(128)
(e) administration and corporate costs
(229)
(444)
(a) exploration & evaluation
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
3
3
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(307)
(569)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
-
-
(60)
(60)
-
(5)
(569)
(1,468)
(e) investments
-
-
(f)
-
-
(a) entities
(b) tenements
(c) property, plant and equipment
(d) exploration & evaluation
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Current quarter
$A’000
Year to date
(6 months)
$A’000
(a) entities
-
-
(b) tenements
165
165
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(464)
(1,368)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
-
Consolidated statement of cash flows
2.2
Proceeds from the disposal of:
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
-
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
-
-
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
2,250
3,416
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(307)
(569)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(464)
(1,368)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
-
-
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(6 months)
$A’000
4.5
Effect of movement in exchange rates on
cash held
-
-
4.6
Cash and cash equivalents at end of
period
1,479
1,479
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
954
225
5.2
Call deposits
525
2,025
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
1,479
2,250
6.
Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
104
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.
Estimated cash available for future operating activities
$A’000
8.1
Net cash from / (used in) operating activities (item 1.9)
(307)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(569)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(876)
8.4
Cash and cash equivalents at quarter end (item 4.6)
1479
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
1,479
2
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
N/A
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
N/A
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
31 January 2022
Authorised by: The Board
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards
and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a
sound system of risk management and internal control which is operating effectively.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing R
Share your feedback
Discover