Further High Grade drill results from Commonwealth South
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
Date: 30 November 2018
Number: 617/301118
FURTHER HIGH GRADE MINERALISATION
CONFIRMED AT COMMONWEALTH SOUTH
Assays from the two diamond drill holes at Commonwealth South confirm significant
extensions to near the surface resource both along trend and at depth:
Hole 086 has returned:
8 metres at 5.1 g/t gold, 20 g/t silver, 1.3% zinc and 0.5% lead from 94 metres down hole;
including 5 metres at 7.7 g/t gold, 25 g/t silver 2.1% zinc and 0.7% lead; which includes
0.5 metres at 34.3 g/t gold, 40 g/t silver, 5.8% zinc and 2.3% lead from 97.6 metres.
Hole 087 has returned:
6 metres at 1.5 g/t gold, 22 g/t silver, 0.7% zinc and 0.2% lead from 96.8 metres down hole;
including 0.35 metres metres at 8.9 g/t gold, 21 g/t silver, 3.5% zinc and 0.6% lead.
Results extend the high grade veins for at least 40 metres down plunge to the south.
A second lower zone of mineralisation has been intersected from about 115 metres down
hole with increasing gold grades at depth which is open. Hole 087 in this zone returned
5 metres at 1.2 g/t gold within a 12 m thick zone of anomalous gold, silver, lead and zinc.
All 8 diamond drill holes from the recent programme returned high grade mineralisation
which is open along trend and at depth with further drilling required.
Further confirmation of strong geological similarities to the Eskay Creek VMS mine in
British Columbia (production of 3.3 million ounces of gold and 160 million ounces of silver)
where recent renewed exploration around the dormant mine shows close spaced drilling
(25 metres) is required to track the target high grade massive sulphide lenses down dip
(TSX:V Skeena Resources Limited).
High grade assay results from the final two of eight diamond drill holes completed at Impact Minerals
Limited’s (ASX:IPT) 100% owned Commonwealth Project located 100 km north of Orange in New
South Wales, have confirmed significant extensions to the mineralisation at the Commonwealth South
Prospect at the southern end of the Commonwealth deposit (Figure 1).
The results have materially extended the down plunge extent of high grade mineralisation at the
southern end of the Commonwealth deposit, beyond the extent of the current resource outline (Figures 1
and 2). The results also further demonstrate that the deposit contains numerous narrow high grade veins
commonly carrying grades of between 10 g/t and more than 30 g/t gold.
26 Richardson Street West Perth Western Australia 6005
Tel +61 (8) 6454 6666 Facsimile +61 (8) 6454 6667
Email info@impactminerals.com.au www.impactminerals.com.au
Figure 1. Location of new drill assays at Commonwealth South (Holes 86 and 87) as well as key
massive sulphide intercepts from Main Shaft Holes (Holes 83 and 84) (yellow labels).
The dotted Red outline shows the surface projection of the Commonwealth Inferred Resource.
The extensive mineralisation and drill holes at the Silica Hill prospect north east of Main Shaft have
been omitted for clarity.
In addition a second, lower zone of mineralisation below the Commonwealth rhyolite has been
confirmed below the main zone of mineralisation (Figure 2). Both zones are open at depth and along
trend and further drilling is required (Figures 2 and 3).
In the upper, main zone of mineralisation located within the Commonwealth rhyolite unit (Figure 2),
drill hole CMIPT086 has returned:
8 metres at 5.1 g/t gold, 20 g/t silver, 1.3% zinc and 0.5% lead from 94 metres down hole;
including 5 metres at 7.7 g/t gold, 25 g/t silver 2.1% zinc and 0.7% lead; which includes
0.5 metres at 34.3 g/t gold, 40 g/t silver, 5.8% zinc and 2.3% lead from 97.6 metres.
Figure 2. NE-SW Cross-section showing drill results for Holes 086 and 087 and showing upper and
lower zones of mineralisation.
In addition drill hole CMIPT087 has returned:
6 metres at 1.5 g/t gold, 22 g/t silver, 0.7% zinc and 0.2% lead from 96.8 metres down hole;
including 0.35 metres metres at 8.9 g/t gold, 21 g/t silver, 3.5% zinc and 0.6% lead.
Together, these drill holes and the four high grade massive sulphide results from Holes 082 to 085
reported recently7continue to demonstate the potential to significantly expand the size of the resource at
Commonwealth.
A long section of the deposit shows that the high grade zones are open at depth and along trend
(Figure 3). In addition an east to south-east plunge on the orezones is also evident. Further drilling is
demonstrably required.
Figure 3. Long section through the upper zone of mineralisation along the Commonwealth deposit and
showing significant areas that require drill testing.
The lower zone of mineralisation at Commonwealth South comprises a 9 metre to 15 metre thick zone
of alteration and weak zinc, lead and iron sulphides but with increasing grades, and gold in particular
with depth (Figure 2). The best result is from the deepest intercept in the zone which is in Hole 087 and
that returned:
12.5 metres at 0.6 g/t gold, 3.7 g/t silver, 0.25% zinc from 116.5 metres down hole;
including 5 metres at 1.2 g/t gold, 3.6 g/t silver and 0.2% zinc from 188.2 metres.
A significant number of drill holes have now intersected a lower zone of mineralisation over the entire
length of the Commonwealth deposit (Figure 1). This includes a narrow zone of high grade massive
sulphide that is at least 100 metres by 150 metres in dimension which was intersected and confirmed at
Main Shaft in the four holes completed there in this programme7. For example Hole 083 returned:
1 metre at 3.1 g/t gold, 57 g/t silver, 9.4% zinc and 4.3% lead from 143 metres down hole;
including 0.3 metres at 0.8 g/t gold, 150 g/t silver, 30.2% zinc and 13.6% lead7.
This lower zone, which appears to be improving at depth, is very poorly tested throughout the entire
length of the Commonwealth deposit.
The Eskay Creek gold-silver base metal deposit
In previous announcements Impact has demonstrated compelling similarities between the mineralisation
at Commonwealth-Silica Hill and the Eskay Creek deposit in famous “Golden Triangle” of northern
British Columbia, Canada8. This drill programme further confirms this comparison.
The discovery of Eskay Creek, in 1988, followed about 50 years of exploration in the area for gold,
silver and base metal mineralisation which was first found close to the actual mine in 1932. It is the type
example of a high sulphidation volcanogenic massive sulphide (VMS) deposit, a style of depoist only
recognised in the past 30 years.
Over its 14 year mine life Eskay Creek produced approximately 3.3 million ounces of gold and
160 million ounces of silver at average grades of 45 g/t gold and 2,224 g/t silver from 2.2 million tonnes
of ore. It was once the world’s highest-grade gold mine and fifth-largest silver mine by volume. Cut-off
grades ranged from 12 to 15 g/t AuEq for mill ore and 30 g/t AuEq for direct shipping smelter ore.
In recent months TSX:V listed company Skeena Resources Limited has started to re-explore at Eskay
Creek and surrounding area and considerable attention has been aroused from some outstanding drill
intercepts from remnant ore positions in the mine (see releases at www.skeenaresources.com).
The similarities between Commonwealth, also interpreted as a high sulphidation VMS, and Eskay Creek
include:
1. The host rocks and the style of mineralisation, in particular the presence of fragmental massive
sulphides.
2. The contained commodity (gold, silver sulphosalts, zinc, lead) and pathfinder metals (in
particular extensive barite and lesser arsenic and antimony).
3. The high grades of individual units and veins of commodity metals. For example, some of the
the higher-grade gold and silver veins discovered by Impact at Silica Hill returned 0.9 metres at
23 g/t gold and 1,100 g/t silver and 1 metre at 12.2 g/t gold and 680 g/t silver in CMIPT 0469.
In addition there are exceptional grades of silver within individual veins with the highest
discovered to date of 0.4 m at 1.6 g/t gold and 6,240 g/t silver in Hole 0745.
4. a very well developed alteration mineral assemblage that shows very clear timing relationships
of early silica-pyrite-K feldspar progressively overprinted by sericite and then chlorite.
Figure 4 shows a plan map of Eskay Creek with Commonwealth shown at the same scale and
highlighting the size of the massive sulphide lens at Main Shaft in comparison.
It is clear there is significant scope of Commonwealth to discover many more massive sulphide lenses.
It is evident from the comparison and also from recent drilling by Skeena Resources at Eskay Creek that
the target lenses are sometimes only 10’s of metres wide (as opposed to their thickness). Accordingly
the drill spacing required to effectively test these lenses has to be of the order of 25 metres between drill
holes. They can be easily missed.
Figure 4. Comparison of Eskay Creek and Commonwealth (Figure 1) at the same scale. Note the
massive sulphide lens at Main Shaft (blue ellipse) and compare to the widths of all but the largest lens at
Eskay Creek. Close spaced drilling is required in further exploration.
DISCUSSION AND NEXT STEPS
All eight holes from the recent drill programme returned high grade mineralisation from the three main
prospects; Main Shaft, Commonwealth South and Silica Hill.
All of these results indicate the potential to increase the Inferred Resources at Commonwealth both for
the overall resource, which extends from Main Shaft to Commonweath South, and for the higher grade
massive sulphide resource within it, at Main Shaft (Figure 1).
The Inferred Resource was prepared in accordance with the JORC 2012 Code by independent resource
consultants Optiro2. At a 0.5 g/t gold cut off the entire Inferred Resource is:
720,000 tonnes at 2.8 g/t gold, 48 g/t silver, 1.5% zinc, 0.6% lead and 0.1% copper.
The resource extends from surface to an average depth of 90 metres, has a strike length of 400 metres
and is up to 25 metres thick.
A separate Inferred Resource (included within the overall resource) was also calculated for the massive
sulphide lens at Main Shaft alone to demonstrate the high grade nature of such deposits that are the
principal target for Impact’s exploration programme. The Main Shaft Inferred Resource is:
145,000 tonnes at 4.3 g/t gold, 142 g/t silver, 4.8% zinc, 1.7% lead and 0.2% copper.
A detailed synthesis and interpretation of all data collected will be commenced with a view to a resource
upgrade in early 2019 and to include a maiden resource estimate for Silica Hill.
In addition further drilling is required at all prospects. Impact will look to drill these areas in 2019.
COMPLIANCE STATEMENT
The new results presented here are Exploration Results comprising:
Assays from two diamond drill holes from the Commonwealth South Prospect.
Further details on these results can be found in the Appendix.
Previous Exploration Results and Mineral Resource Estimates have been reported to the ASX in a large
number of announcements over the past few years. The significant announcements referred to and
numbered in this report are:
1. 6 August 2018 – ASX Release “Further massive sulphide mineralisation at Commonwealth, NSW”
2. 19 February 2015 – ASX release “Maiden high grade resource at Commonwealth, NSW.”
3. 30 June 2016 – ASX release “High grade extensions to the Commonwealth Deposit.”
4. 28 March 2018 – ASX release “Further evidence of large mineralised system at Silica Hill.”
5. 13 February 2018 – ASX release “High grade silver intersected at Silica Hill.”
6. 22 September 2014 – ASX release “Bonanza gold grades at Commonwealth South.”
7. 18 September 2018 – ASX release “Further high grade mineralisation and second massive sulphide
unit confirmed at Commonwealth”.
8. 6 June 2018 – ASX Release “New Drill Targets at the Silica Hill East Prospect, Commonwealth”.
9. 22 February 2017 – ASX Release “
Details on these previous results can also be found in the Appendix.
Impact Minerals confirms that it is not aware of any new information or data that materially affects the
information included in the previous market announcements referred to and in the case of Mineral
Resource Estimates, that all material assumptions and technical parameters underpinning the estimates
continue to apply and have not materially changed.
Dr Michael G Jones
Managing Director
The review of exploration activities and results contained in this report is based on information compiled by Dr Mike Jones, a Member of
the Australian Institute of Geoscientists. He is a director of the company and works for Impact Minerals Limited. He has sufficient
experience which is relevant to the style of mineralisation and types of deposits under consideration and to the activity which he is
undertaking to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves (the JORC Code). Dr Jones has consented to the inclusion in the report of the matters based on his
information in the form and context in which it appears.
DRILL HOLE DATA
Hole ID
Location
CMIPT086
Commonwealth
South
Commonwealth
South
CMIPT087
692359
6392610
Azimuth
(degrees
magnetic)
229
692359
6392612
219
Easting
MGA94
Northing
MGA94
Dip
(degrees)
EOH (m)
54
131.2
58
135.3
SIGNIFICANT INTERCEPTS REPORTED FOR THE FIRST TIME
Hole Id
From
To
Interval
Au
Ag
Zn
Pb
Cu
94
94
97.6
102
99
98.1
8
5
0.5
5.08
7.73
34.3
20
25
40
13543
21300
57900
4500
7092
22600
345
541
1600
CMIPT087
including
also including
113
96.75
96.75
96.75
116.45
122
102.88
98.15
97.1
129
9
6.13
1.4
0.35
12.55
0.6
1.51
4.17
8.89
0.65
4.6
3349
1044
NSA
22.17 7876.44 1804.78 434.71
51.10 30625 6872.50 1808.79
20.90 35500
6220
663
3.68 2502.51 347.97 362.37
including
118.17
123.15
4.98
1.23
3.58
CMIPT086
including
also including
2264.30
347.12
517.05
Cutoff
0.5 g/t Au cut
off
1 g/t Au Cutoff
10 g/t Cutoff
0.5 g/t Au cut
off
0.5 g/t Au
1 g/t Au
8 g/t Au
0.1 g/t Au
1 g/t Au
APPENDIX 1 - SECTION 1 SAMPLING TECHNIQUES AND DATA
Criteria
JORC Code explanation
Commentary
Nature and quality of sampling (e.g. cut channels, random chips,
or specific specialised industry standard measurement tools
appropriate to the minerals under investigation, such as down
hole gamma sondes, or handheld XRF instruments, etc). These
examples should not be taken as limiting the broad meaning of
sampling.
Rock chip samples
Random grab samples were taken at surface which represented favourable geology and alteration to known mineralisation in the
region. Samples are variably weathered.
Soil Samples
About 250g of soil was taken from 15-20cm below surface and sieved to - 2mm size. Samples put in plastic snap seal bags.
Samples were subsequently sieved to -250 micron at SGS Laboratories for assay by aqua regia digest.
RC Drilling
Reverse Circulation (RC) percussion drilling was used to produce a 1m bulk sample (~25kg) which was collected in plastic bags and
representative 1m split samples (12.5%, or nominally 3kg) were collected using a riffle splitter and placed in a calico bag. The
cyclone was cleaned out with compressed air at the end of each hole and periodically during the drilling. Holes were drilled to
optimally intercept interpreted mineralised zones.
Diamond Drilling
Diamond drilling was used to produce drill core either with a diameter of 63.5 mm (HQ) or 47.6 mm (NQ).
Hand-held XRF
Handheld XRF analysis was completed with a handheld Vanta M Series XRF 50KeV instrument at 50 cm and 1 m intervals on
diamond core and for every metre for RC samples. For individual veins or samples that are specifically reported, several readings
are taken to establish an average. Investors should note that the analyses are semi-quantitative and are a guide only to the metal
content. Laboratory assays are used in preference where available.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used
Rock chip samples
Representative samples at each sample site weigh between 0.8 and 1.2 kg. Sample sites were chosen due to historic rock and soil
assay results and the geophysical surveys conducted on the Commonwealth Project. Historic rock sample methods are unknown
but are considered immaterial.
Soil Samples and Drill Samples
Sample representivity was ensured by a combination of Company Procedures regarding quality control (QC) and quality assurance
/ testing (QA).
Examples of QC include (but are not limited to), daily workplace and equipment inspections, as well as drilling and sampling
procedures.
Examples of QA include (but are not limited to) collection of “field duplicates”, the use of certified standards and blank samples
approximately every 50 samples
Sampling techniques
Criteria
Drilling techniques
Drill sample recovery
JORC Code explanation
Commentary
Aspects of the determination of mineralisation that are Material
to the Public Report. In cases where ‘industry standard’ work has
been done this would be relatively simple (e.g. ‘reverse circulation
drilling was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other cases
more explanation may be required, such as where there is coarse
gold that has inherent sampling problems. Unusual commodities
or mineralisation types (e.g. submarine nodules) may warrant
disclosure of detailed information
Rock chip samples
Rock samples were sent to SGS Perth where they were crushed, dried and pulverised (total prep) to produce a 25-30 g subsamples for analysis initially by Aqua Regia digest with ICP-MS finish for base metals then by four acid digest with an ICP/AES
finish for ore grade base metal samples and lead collection fire assay with AAS finish for gold.
Soil Samples
Soil samples were sent to ACME Laboratories in Vancouver for analysis by aqua regia digest or to SGS Laboratories in Perth for
analysis by the MMI digest.
RC and diamond drill samples
RC samples and cut samples of core were submitted to ALS in Orange, NSW. Laboratory sample preparation involved: sample
crushed to 70% less than 2mm, riffle/rotary split off 1 kg, pulverise split to >85% passing 75 microns.
RC samples analysed by MEICP41 or MEOG46 for ore grade samples, aqua region digest with ICP OES analysis and AA24 fire assay
with AAS finish.
Historical diamond and RC samples were sent to Fox Anamet, Brookvale NSW where gold was determined by fire assay, base
metals by DCP and AAS methods.
Weathered samples contained gossanous sulphide material and fresh samples containing visible pyrite, galena, sphalerite and
chalcopyrite.
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary
air blast, auger, Bangka, sonic, etc) and details (e.g. core
diameter, triple or standard tube, depth of diamond tails, facesampling bit or other type, whether core is oriented and if so, by
what method, etc).
Diamond drilling accounts for about 50 % of the drilling and comprises NQ (47.6 mm diameter) and HQ (63.5 mm diameter) sized
core. Impact diamond core is mostly triple tube and is oriented. Historical diamond core was not oriented.
RC drilling accounts for about 50% of the drilling and comprises 4 inch hammer.
Method of recording and assessing core and chip sample
recoveries and results assessed
Diamond core recoveries for all holes are logged and recorded. Recoveries are estimated to be approximately >97% for the
Commonwealth Project. No significant core loss or sample recovery problems are observed in the drill core or historic reports. RC
samples were visually checked for recovery, moisture and contamination.
Measures taken to maximise sample recovery and ensure
representative nature of the samples
Diamond core is reconstructed into continuous runs on an angle iron cradle for orientation marking. Depths are checked against
the depth given on the core blocks and rod counts are routinely carried out by the driller.
The RC samples are collected by plastic bag directly from the rig-mounted cyclone and laid directly on the ground in rows of 10.
The drill cyclone and sample buckets are cleaned between rod-changes and after each hole to minimise down-hole and/or cross
contamination.
Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
No sample bias has been established.
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
Geological logging of samples followed company and industry common practice. Qualitative logging of samples included (but not
limited to); lithology, mineralogy, alteration, veining and weathering. Diamond core logging included additional fields such as
structure and geotechnical parameters.
Magnetic Susceptibility measurements were taken for each 1m RC sample and each 1m diamond core interval.
For diamond core, information on structure type, dip, dip direction, texture, shape and fill material has been recorded in the logs.
RQD data has been recorded on selected diamond holes.
Logging
Criteria
Sub-sampling
techniques and
sample preparation
Quality of assay data
and laboratory tests
Verification of
sampling and assaying
JORC Code explanation
Commentary
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
All logging is quantitative, based on visual field estimates. Systematic photography of the diamond core in the wet and dry form
was completed.
Chip trays with representative 1m RC samples were collected and photographed then stored for future reference.
The total length and percentage of the relevant intersections
logged
All diamond drill holes were logged in full.
All RC chips samples were geologically logged by Impact’s on-site geologist on a 1m basis, with digital capture in the field.
Detailed diamond core logging, with digital capture was conducted for 100% of the core by Impact’s on-site geologist.
If core, whether cut or sawn and whether quarter, half or all core
taken.
All core samples were sampled by half core. Selected intervals of quarter core will be selected for check assays if required.
If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
RC samples were split using a riffle splitter.
For all sample types, the nature, quality and appropriateness of
the sample preparation technique.
Company procedures were followed to ensure sub-sampling adequacy and consistency. These included (but were not limited to),
daily work place inspections of sampling equipment and practices, as well as sub-sample duplicates (“field duplicates”).
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Laboratory QC procedures for rock sample assays involve the use of internal certified reference material as assay standards, along
with blanks, duplicates and replicates.
The QC procedure for historical diamond and RC samples is unknown but considered immaterial.
Measures taken to ensure that the sampling is representative of
the in situ material collected, including for instance results for
field duplicate/second-half sampling.
Sample duplicates from the historical drilling were taken from selected intervals and compared to the original assay. Quarter core
was taken for diamond samples and riffle re-splits for RC samples.
Whether sample sizes are appropriate to the grain size of the
material being sampled.
The samples sizes at Commonwealth are considered appropriate since gold has been identified as predominantly fine-grained by
thin section analysis which would indicate the nugget effect is minimal.
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
An industry standard fire assay technique for samples using lead collection with an Atomic Absorption Spectrometry (AAS) finish
was used for gold and aqua regia digest for base metals and silver.
The quality of historical drill sample assays is unknown, however this is considered immaterial at this stage of exploration.
For geophysical tools, spectrometers, handheld XRF instruments,
etc, the parameters used in determining the analysis including
instrument make and model, reading times, calibrations factors
applied and their derivation, etc.
No geophysical tools were used to determine material element concentrations. A handheld Vanta M Series XRF 50KeV instrument
was used for semi-quantitative analysis only. The sampling interval was two times 20 second intervals. Calibration is carried out
at the start of the sampling procedure each time the machine is turned on and appropriate standards are used every 25th sample.
Elements analysed include:Ag, As, Ba, Se, Ca, K, S, Sb, Sn, Cd, Sr, Rb, Pb, Hg, W, Cu, Ni, Co, V, Ti, Fe, Mn, P, Cr, Mo, U and Ta.
Nature of quality control procedures adopted (e.g. standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of bias) and precision have
been established.
For the rock chips, quality control procedures for assays were followed via internal laboratory protocols. Accuracy and precision
are within acceptable limits.
The quality control of historical drill sample assays is unknown, however this is considered immaterial at this stage of exploration.
The verification of significant intersections by either independent
or alternative company personnel.
Significant intersections from drilling have not been verified by independent or alternative companies. This is not required at this
stage of exploration.
Criteria
Location of data
points
JORC Code explanation
Commentary
The use of twinned holes.
Two twin diamond holes versus historic RC holes have been drilled at Commonwealth South and Main Shaft.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Primary assay data for rock chips has been entered into standard Excel templates for plotting in Mapinfo and Target. All historical
drill data has been entered digitally by previous explorers and verified internally by Impact.
Discuss any adjustment to assay data.
No significant adjustments have been required.
Accuracy and quality of surveys used to locate drill holes (collar
and down-hole surveys), trenches, mine workings and other
locations used in Mineral Resource estimation.
Recent drill holes have been located by DGPS. Historical drill holes and mine shafts have been verified by DGPS.
Specification of the grid system used.
The grid system for Commonwealth is MGA_GDA94, Zone 55.
Quality and adequacy of topographic control.
Standard government topographic maps have been used for topographic validation. The DGPS is considered sufficiently accurate
for elevation data.
For the diamond holes, down-hole single shot surveys were conducted by the drilling contractor. Surveys were conducted at 6m,
18, 30m and then approximately every 30m down-hole.
For the RC drill holes, down hole dip surveys were taken at approximately 30m intervals and at the bottom of the hole.
Data spacing for reporting of Exploration Results.
Drill spacing of drill holes ranges between 10 and 30 m which is considered adequate for Exploration Results.
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied.
Drill spacing of drill holes ranges between 10 and 50 m and may be considered adequate for Mineral Resource and Ore reserve
estimation procedures. However estimations of grade and tonnes have not yet been made.
Whether sample compositing has been applied.
Sample compositing has been applied for quoting drill composite results only.
Whether the orientation of sampling achieves unbiased sampling
of possible structures and the extent to which this is known,
considering the deposit type.
Drilling is oriented sub-perpendicular to the mineralised trend and stratigraphic contacts as determined by field data and cross
section interpretation.
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to have
introduced a sampling bias, this should be assessed and reported
if material.
No significant sample bias has been identified from drilling due to the optimum drill orientation described above. Where present,
sample bias will be reported.
Sample security
The measures taken to ensure sample security.
For rock samples, chain of custody is managed by Impact Minerals Ltd. Samples for Commonwealth are delivered by Impact
Minerals Ltd personnel to ALS in Orange, NSW or to SGS Perth for prep and assay. Whilst in storage, they are kept in a locked
yard. Tracking sheets have been set up to track the progress of batches of samples.
Security of historic drill samples is unknown however is considered immaterial.
Audits or reviews
The results of any audits or reviews of sampling techniques and
data.
A review of the sampling techniques and data both of historic drill holes and of Impact’s procedures has been completed by
Optiro Consultants of Perth, WA.
Data spacing and
distribution
Orientation of data in
relation to geological
structure
SECTION 2 REPORTING OF EXPLORATION RESULTS
Criteria
Mineral tenement and land
tenure status
Exploration done by other
parties
JORC Code explanation
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint ventures,
partnerships, overriding royalties, native title interests, historical sites,
wilderness or national park and environmental settings.
The Commonwealth Project currently comprises 3 exploration licences covering 31
Share your feedback
Discover