Annual Report to shareholders
Released
Released
Announcement PDF
ABN 52 119 062 261
ANNUAL REPORT
2022
Corporate Directory
BOARD OF DIRECTORS
Peter Unsworth
Michael Jones
Paul Ingram
Frank Bierlein
Non-Executive Chairman
Managing Director
Non-Executive Director
Non-Executive Director
COMPANY SECRETARY
Bernard Crawford
REGISTERED OFFICE & PRINCIPAL PLACE OF BUSINESS
26 Richardson Street
West Perth, WA 6005
Telephone: +61 (8) 6454 6666
Facsimile: +61 (8) 6314 6670
Email: info@impactminerals.com.au
Web: www.impactminerals.com.au
AUDITORS
Hall Chadwick WA Audit Pty Ltd
283 Rokeby Road
Subiaco, WA 6008
SHARE REGISTRY
Computershare Investor Services Pty Ltd
Level 11, 172 St Georges Terrace
Perth, WA 6000
Telephone: +61 (8) 9323 2000
Facsimile: +61 (8) 9323 2033
SECURITIES EXCHANGE LISTING
The Company is listed on the Australian Securities Exchange Ltd (“ASX”)
Home Exchange: Perth, Western Australia
ASX Code: IPT, IPTOB
Impact Minerals Ltd Annual Report 2022
Impact Minerals Limited
Impact Minerals Limited is an exploration company
listed on the ASX in November 2006.
The Company manages extensive tenement holdings of
nearly 4,000 square kilometres within Australia featuring
significant potential for high-grade mineral deposits of
gold, silver, lead, zinc, copper, nickel and PGM’s.
The Directors of the Company have extensive
experience in mineral exploration and a strong history
of exploration success, business development and
corporate management.
Impact Minerals intends to build wealth for its
shareholders through a vigorous campaign of project
generation and discovery of major mineral deposits
to move towards profitable mining operations.
Contents
2
Chairman’s Letter
3
Overview: A Year of Transition
4
Review of Operations
33 Directors’ Report
44 Auditor’s Independence Declaration
45 Consolidated Statement of Profit or Loss and Other Comprehensive Income
46 Consolidated Statement of Financial Position
47 Consolidated Statement of Changes in Equity
48 Consolidated Statement of Cash Flows
49 Notes to the Consolidated Financial Statements
72 Directors’ Declaration
73 Independent Auditor’s Report
79 Shareholder Information
82 Tenement Schedule
1
2
Impact Minerals Ltd Annual Report 2022
Chairman’s Letter
The year to 30th June 2022 saw a significant strategic change in focus for
your company from its long standing projects in eastern Australia to a new
and significant portfolio of battery, precious and strategic metals projects
in the emerging mineral province of south west Western Australia.
Exploration during the year has focussed on this new portfolio and in
particular on the flagship Arkun-Beau project centred about 200 km south
east of Perth and first staked in 2020 following the discovery of the world
class Julimar platinum group metal discovery in the region. First pass
reconnaissance soil geochemistry surveys at Arkun-Beau have already
returned a significant number of anomalies for a range of deposit styles
including nickel-copper-PGM hosted by mafic rocks, lithium pegmatites as well as rare earth elements and
rubidium. Follow up work will be a prime focus in the coming year and will involve negotiating numerous
land access agreements with land owners.
Impact also acquired three further 100% owned projects and entered into four joint ventures on very
attractive terms during the year bringing the company’s total land position in Western Australia to
about 4,000 sq km. Preliminary soil geochemistry traverses on all of the new projects have all returned
significant anomalies for the same range of metals as Arkun and this is very encouraging. These projects
will also be a focus of work in 2023.
First pass drill programmes were also completed at the Hopetoun joint venture located near the mining
centre of Ravensthorpe and also the previously acquired Doonia joint venture located 80 km east of
Kambalda. Data including assays from these drill programmes are still being interpreted with a view to
determining next steps.
An integral part of the change in strategic focus has been the rationalisation of Impact’s projects in
eastern Australia. As part of this process during the year Impact completed the sale of two tenements
which were part of the Commonwealth project to ASX listed company Orange Minerals Limited and
agreed to the sale of the Blackridge gold project in Queensland. Subsequent to the year end Impact also
agreed to sell 75% of the Commonwealth Project to unlisted company Burrendong Resources Pty Ltd,
subject to Burrendong listing on the ASX by mid 2023.
Impact was also pleased to announce that IGO Limited, one of Australia’s leading mining and exploration
companies, agreed to farm into two tenements which form a small part of the company’s significant
Broken Hill project in NSW. IGO can spend up to $18 million over 8 years to earn a 75% interest in the
tenements. A significant deep seated EM conductor has been identified and IGO have indicated that this
will be drill tested by the end of 2022 if possible.
More details on the Company’s activities and projects are set out in the Review of Operations. We are
looking forward to an exciting 2023 with maiden drill programmes on a number of our new projects.
Peter Unsworth
Chairman
Impact Minerals Ltd Annual Report 2022
3
Overview: A Year of Transition
During the Year Impact completed a strategic transition in its exploration programme from eastern Australia to
Western Australia and assembled a portfolio of 10 projects covering about 4,000 square kilometres (Figure 1). All
10 projects are very poorly explored and yet have significant potential for the discovery of a wide range of battery,
strategic and precious metals. Of the ten projects, five are 100% owned (Beau, Arkun, Mineral Hill, Martup Hills and
Dinninup) and five are joint ventures with private groups (Jumbo, Narryer, Dalgaranga and Hopetoun which were
commenced during the year, and Doonia). All contain untested geophysical and geochemical targets in emerging
prospective terranes across Western Australia.
As part of strategic transition, a
rationalisation of Impact’s project
portfolio in eastern Australia was
continued during the year. The
company sold two tenements that
were part of the Commonwealth
Project (EL8632 and part of
EL8505) to Orange Minerals NL
for $180,000 cash and 250,000
shares in Orange (ASX Release 4th
February 2021). Orange listed on
the Australian Stock Exchange in
December 2021 (ASX:OMX) with the
shares currently trading at about
$0.16 per share. Impact’s shares are
escrowed until October 2022.
In addition Impact still holds
1,000,000 shares in Australasian
Metals Limited (ASX:A8G) which it
received for the sale of the Clermont
gold project in Queensland at a
nominal 10 cents per share. The
shares, which are escrowed until
April, are currently trading at about
$0.30 per share.
Impact also agreed to the sale
of its Blackridge gold project in
Queensland to an unlisted private
company. The project comprises
one small mining lease and three
exploration licences covering about
142 sq kilometres. The terms of the
sale are:
1.
$30,000 cash for the outright
sale of ML2386 (completed).
2. $50,000 cash as a nonrefundable option fee to
purchase Impact’s 100% owned
subsidiary company Blackridge
Exploration Pty Ltd within two
years for a further $350,000.
Blackridge holds three
exploration licences: EPM26806,
EPM27410 and EPM27571
(completed).
Figure 1: Location of Impact’s projects in Western Australia
3. A 1% NSR royalty for all gold
produced after the first 5,000
ounces of production.
In August 2022 Impact reached an
agreement to sell 75% interest in
the entire Commonwealth project
to unrelated company Burrendong
Resources Pty Ltd. Burrendong is
aiming to conduct an IPO in 2023.
4
Impact Minerals Ltd Annual Report 2022
Review of Operations
1. ARKUN PROJECT, WA (IPT 100%)
The Arkun Project, which covers
about 1,900 square kilometres, is
centred between York and Corrigin
130 km east of Perth and was
staked following the significant
PGM discovery at Julimar just 75 km
north east of Perth by Chalice
Mining Ltd (ASX:CHN) (ASX Release
29th May 2020). Impact is one of the
larger ground holders in the region
(Figure 1.1).
During the year, 17 first pass
targets for nickel-copper-PEMgold and lithium were identified
by a proprietary geophysical
method owned by Southern Sky
Energy Pty Ltd, with input from the
interpretation of regional magnetic
data, surface geology maps and
reconnaissance field checking and
rock chip samples. This work has
shown that:
1.
It is likely that mafic and
ultramafic rocks are more
widespread than shown on
the regional Geological Survey
maps.
Fifteen of these targets were
covered by a single line soil
geochemistry traverse, each up
to several kilometres long along
gazetted roads and tracks with soil
samples taken at 100 metre spacings
along the traverses.
Each traverse was long enough to
extend well away from the target
area into areas of “background”
in order to establish the relative
anomalism of the various metals in
the target above background.
A significant number of high priority
targets for nickel-copper-platinum
group metals-gold (PGM) and, for
the first time, lithium-caesiumtantalum pegmatites, rare earth
elements (REE) and rubidium were
defined by the soil geochemistry.
The overall results of the soil
geochemistry survey are described
below and presented as additive
Z scores in the following Figures.
Further details on some of the
priority targets identified and the
sampling and analytical techniques
used can be found in ASX
Release 21st September 2021 and
27th October 2021.
Beau
2. The mafic and ultramafic
rocks contain low levels of
PGE up to 25 to 30 ppb
platinum+palladium+gold in
rock chip samples in many
places. This is encouraging as it
suggests elevated background
levels of these metals are
widespread across the
project area.
3. Most of the project area is
covered by residual soils
and ferricrete with limited
transported cover meaning
that quick assessments of
target areas can be made with
conventional soil geochemistry
techniques.
Figure 1.1: Location of priority targets for follow up on Impact’s tenements.
Impact Minerals Ltd Annual Report 2022
5
Review of Operations
continued
1.1 NICKEL-COPPERPALLADIUM-PLATINUMGOLD RESULTS
The results for nickel-copperpalladium-platinum and gold
are shown as additive Z scores
in Figure 1.2. Gold has been
included because it shows a strong
mathematical correlation with the
other metals.
It is evident that the central part of
the Arkun project area stands out as
being strongly anomalous in all five
metals and six high priority targets
and five medium priority targets
have been identified as warranting
follow up work.
Of note is that the targets are
commonly anomalous in all five
metals and in particular palladium
and gold (Figure 1.2). This suggests
a potential relationship to sulphide
mineralisation rather than being the
result of elevated backgrounds of
only nickel and copper related to
areas of mafic rocks.
N4
N3
N1
N2
Figure 1.2: Additive Z scores for Ni-Cu-Pd-Pt-Au across the main Arkun project area. Note the
large areas of anomalism in the central part of the project area. Four priority areas for follow
up work are highlighted. Other areas of elevated response are also evident including the Beau
target to the north.
This is an exceptional result
and supports Impact’s original
contention that the Arkun area is
highly prospective for nickel-copperPGM mineralisation.
The drill results are presented as additive Z score indices. Z scores are a standard statistical calculation of the
number of standard deviations a raw data (assay) value is from the mean of the data. For example a Z score of
2 indicates a value 2 standard deviations above the mean. The higher the Z score, the more anomalous the data
point is with respect to the dataset. Z scores are a standard method of normalising data so that statistically
meaningful associations between datasets can be made. In this case the Z scores for individual metals that
occur within assemblages specific to the alteration zones around a nickel-copper-PGM deposits are simply
added together in order to amplify the association.
6
Impact Minerals Ltd Annual Report 2022
Review of Operations
continued
Four priority areas, N1 to N4 were described in the ASX Release dated 21st September 2021 and are shown in
(Figure 1.3). The soil anomalies all cover extensive areas and are coincident with either gravity highs or magnetic lows
which together may represent mafic-ultramafic intrusions that are potential hosts for nickel-copper-PGM sulphide
mineralisation.
N2
N1
N4
N3
Figure 1.3: Priority Targets for Ni-Cu-PGM-Au shown on images of regional gravity data and regional magnetic data (bottom right).
Top left: Target N1. Strongly elevated soil geochemistry responses extend over an area of at least 600 metres by 300 metres and occurring close
to a significant gravity high (warmer colours).
Top right: Target N2. Multiple moderate to strongly elevated soil geochemistry responses extend over several line kilometres with about six areas
of interest within the one target identified and all coincident with a broad gravity high.
Bottom Left: Target N3. Moderate soil responses over about 1,000 metres are coincident with a moderate gravity high.
Bottom Right: Target N4. Moderate soil responses coincident with the western edge of a magnetic low (cooler colours). The magnetic low may
represent a mafic intrusion with elevated nickel-copper-PGM at its base on the western side.
Impact Minerals Ltd Annual Report 2022
7
Review of Operations
continued
1.2 LITHIUM-CAESIUM-TANTALUM RESULTS
The results for lithium-caesium-tantalum are shown as additive Z scores in Figure 1.4. The coincidence of the three
metals together suggests the potential for the source of the anomalies to be lithium-caesium-tantalum (LCT)
pegmatites, a key source of hard rock lithium for the emerging battery metals industry.
It is evident that numerous areas across the Arkun project stand out as being strongly anomalous in all three metals
and six high priority targets and at least five medium priority targets have been identified as warranting follow up work
(Figure 1.4).
One of the standout areas is the Beau target, the northern most priority area identified. This target was purchased
by Impact in 2020 for its nickel-copper-PGM potential and modest soil responses for those metals were returned
(Figure 1.2). However, there are numerous strong LCT responses in the area as well.
Beau
L3
L2
L1
Figure 1.4: Additive Z scores for Li-Cs-Ta across the main Arkun project area. Note the large areas with very elevated Z scores in the central east
part of the project area and at Beau to the north. Six priority areas for follow up work are highlighted. Other areas of elevated response are also
evident.
8
Impact Minerals Ltd Annual Report 2022
Review of Operations
continued
Three priority areas, L1 to L3 were described in the ASX Release dated 21st September 2021 (Figure 1.5). There has been
no previous exploration for lithium at Arkun.
Figure 1.5: Priority Targets for Li-Cs-Ta shown on images of regional magnetic data and regional gravity data (lower image).
Top Left: Target L1. Strongly elevated soil geochemistry responses extend over many hundreds of metres of extent along the traverses. The
prominent magnetic NW trending magnetic unit is a banded iron formation suggesting much of the area may be a deformed and metamorphosed
greenstone belt which are hosts to major lithium deposits in Western Australia.
Top Right: Target L2. Moderate soil geochemistry responses occur over several hundred metres in about four places along the traverse. The
responses are centred over an ovoid feature in the magnetic data interpreted as a granite intrusion that may represent a parent intrusion to LCT
pegmatites.
Lower Image: Target L3. Moderate soil responses over a prominent gravity low. The low may be caused by a granite intrusion. Note this is the
same traverse as Target N4 (Figure 4).
Impact Minerals Ltd Annual Report 2022
9
Review of Operations
continued
1.3 RARE EARTH ELEMENT RESULTS
The results for all 15 of the REE are shown as an additive Z scores in Figure 1.6. The REE comprise: lanthanum, cerium,
praseodymium, neodymium, promethium, samarium, europium, gadolinium, terbium, dysprosium, holmium, erbium,
thulium, ytterbium, and lutetium.
It is evident that the central part of the Arkun project area stands out as being strongly anomalous in the REE and six
high priority targets and have been identified as warranting follow up work. Numerous other areas of anomalism are
also present.
Of note is that the targets are generally anomalous in both the light and the more valuable heavy REE (ASX Release
27th October 2021).
This is a very exciting outcome for Impact and, also supports the Company’s original contention that the Arkun area is
a highly prospective part of the Yilgarn Craton.
Three priority areas, R1 to R3 are shown in more detail in Figure 1.8. The soil anomalies all cover extensive areas and
occur within larger magnetic granites.
R2
R3
R1
Figure 1.6: Additive Z scores for REE across the Arkun project. Note the large areas of anomalism in the central part of the project area. Seven
priority areas for follow up work are highlighted. Other areas of elevated response are also evident.
10
Impact Minerals Ltd Annual Report 2022
Review of Operations
continued
1.4 RUBIDIUM RESULTS
The results for rubidium are shown in Figure 1.7. Numerous areas stand out as being strongly anomalous and four high
priority targets have been identified for follow up work. Two of these areas, Rb1 and Rb2, are shown in more detail in
Figure 1.9. Numerous other areas with anomalous rubidium results are also evident (Figure 1.7).
Rb1
Rb2
Figure 1.7: Ionic leach results for rubidium. Four priority areas for follow up work are highlighted. Other areas of elevated response are also
evident. Note that the low absolute levels of rubidium are a function of the very dilute nature of the chemical digest used in the Ionic Leach assay
method.
Impact Minerals Ltd Annual Report 2022
11
Review of Operations
continued
1.5 DISCUSSION AND NEXT STEPS
The results of Impact’s first ever soil geochemistry programme at Arkun have outlined a significant number of areas
for follow up work for a wide range of commodities: nickel-copper-PGM; lithium LCT pegmatites; REE and rubidium.
Follow-up field checking and sampling will continue with the aim of prioritising areas for more detailed soil
geochemistry and ground geophysical surveys that will extend away from the roads and into the surrounding
paddocks.
In order to explore in the paddocks, land access agreements will be required with the relevant land owners and this
process has commenced. Agreements with about 30 landholders have been signed or are in progress.
R1 R1
R2
R2
R3
Figure 1.8: Priority Targets for REE shown on images of regional magnetic data. Strongly elevated soil geochemistry responses extend over
distances of many hundreds of metres and are mainly associated with the magnetic units with larger granite bodies.
12
Impact Minerals Ltd Annual Report 2022
Review of Operations
continued
Rb1
Rb2
Figure 1.9: Priority Targets for rubidium shown on images of regional magnetic data. Numerous areas of strongly elevated values for rubidium
above background are evident.
An airborne EM survey was also completed during the year over 7 priority areas in the Arkun-Beau project area at a
broad line spacing of 400 metres between survey lines. Six of these areas were previously identified in proprietary
geophysical data and returned strong soil geochemical responses (N1 to N6) (ASX Release 21st September 2021).
One further area with a strong geophysical response but limited soil geochemistry response was also surveyed.
Processing of the data will commence shortly with final data expected in late 2023.
Follow up soil geochemistry surveys have also been completed on five priority areas including the Beau area. Samples
were taken on a nominal 400 m by 400 m or 200 m grid spacing. Results are expected by late 2022.
Impact Minerals Ltd Annual Report 2022
13
Review of Operations
continued
2. JUMBO JOINT VENTURE PROJECT (IMPACT 80%)
The Jumbo joint venture project
comprises one tenement (E70/5852)
covering 360 km2 and is adjacent
to Impact’s Arkun project centred
about 150 km south east of Perth.
The project contains many of the
same geological features and
extensions of the similar structures
as those considered prospective
at Arkun and is therefore a natural
addition to Impact’s large strategic
ground holding in this very under
explored part of Western Australia.
During the year significant high
priority targets for a wide range of
battery and strategic metals were
identified in new soil geochemistry
results from Jumbo.
The soil geochemistry survey
was limited to one major access
road across the project area and
samples were taken mostly at about
100 metre spacings at the side of
the road over a distance of about
30 kilometres (Figures 2.1 to 2.4).
Figure 2.1: Additive Z scores for Ni-Cu-Pd-Pt-Au across the Jumbo-Arkun project area.
Nine priority areas for follow-up work are highlighted including three new ones at Jumbo.
Other areas of elevated response are also evident including the Beau target to the north.
The traverse was designed to get
as close as possible to first pass
geophysical anomalies identified
by Impact’s joint venture partner,
Southern Sky Energy Pty Ltd, using
its proprietary EPR technology.
The results of the soil geochemistry
survey (combined with the Arkun
soil results) are presented as additive
Z scores in Figures 2.1 to 2.4.
Figure 2.2: Additive Z scores for Li-Cs-Ta across the Jumbo-Arkun project area. Eight
priority areas for follow up work are highlighted including two new areas at Jumbo. Other
areas of elevated response are also evident throughout the project area which will also
require follow-up work.
14
Impact Minerals Ltd Annual Report 2022
Review of Operations
continued
New targets have been identified at
Jumbo as follows:
Nickel-copper-Platinum Group
Elements-Gold (Figure 2.1): three
new priority targets identified. The
eastern most target has a significant
gold-dominant response, and which
covers an area of several hundred
metres across trend.
Lithium-caesium-tantalum
(Figure 2.2): two new priority targets
identified with several lower priority
areas also warranting follow up. The
two priority targets are at least a few
hundred metres wide.
Rare Earth Elements (Figure 2.3):
three new priority targets identified
with numerous other lower priority
areas also warranting follow up.
Figure 2.3: Additive Z scores for all REE across the Jumbo-Arkun project area. Seven
priority areas for follow up work are highlighted including three new areas at Jumbo. Note
that there several other areas with strong responses within the Jumbo project which will
also require follow-up work.
Rubidium (Figure 2.4): the entire
soil geochemistry traverse stands
out as being elevated in rubidium, in
particular in comparison with Arkun.
The large area covered by
elevated REE and rubidium results
suggests that the Jumbo area
may be underlain by extensive
areas of granitoid and pegmatite
rocks that are enriched in these
metals compared to Arkun. This is
encouraging for future exploration.
First pass follow-up field checking,
and sampling will start in 2023 with
the aim of prioritising areas for more
detailed soil geochemistry and
ground geophysics. Land access
agreements will be required with
relevant landowners and this process
will also be commenced.
Figure 2.4: Rubidium assay values across the Jumbo-Arkun project area. The Jumbo
project stands out as a very elevated area for rubidium compared to most of the Arkun
project. This may reflect a higher background for rubidium in this area and therefore may
be more prospective for this valuable alkali metal.
Impact Minerals Ltd Annual Report 2022
15
Review of Operations
continued
3. DINNINUP PROJECT
The Dinninup project comprises
4 exploration licences covering
about 485 square kilometres
located about 350km south west of
Perth (Overview Figure; E70/5842,
E70/6111, E70/6112 and E70/6113)
(ASX Release 22nd April 2022).
The project was brought to Impact’s
attention by an unrelated private
group Fiddler’s Creek Mining
Company Pty Ltd. As consideration
for a 100% interest in the project,
Impact paid $20,000 cash to the
vendor, and issued 3 million unlisted
options exercisable at 2.4 cents
expiring on 31 October 2025.
The area is underlain by a variety of
Archaean-aged granites and highgrade metamorphic rocks including
gneisses that are cross-cut by
numerous, mostly northwest trending
faults and shear zones, as well as
younger west-northwest trending
Proterozoic dykes (Figure 3.1).
A number of areas of interest for
follow up were identified by
Southern Sky Energy Pty Ltd using
their proprietary EPR technology
and which were close to a major
access road that traverses the
project area. A reconnaissance soil
geochemistry survey was completed
along the main access road with
samples taken mostly at about
100 metre spacings at the side of
the road over a distance of about
20 kilometres (Figure 3.1).
Figure 3.1: Geology of (left) and magnetic data (right) of the Dinninup Project showing major
structures and the location of the soil geochemistry traverses.
16
Impact Minerals Ltd Annual Report 2022
Review of Operations
continued
Ni-Cu-Pd-Pt-Au
Soil Geochemistry Results
The results of the soil geochemistry
survey are presented as additive
Z scores in Figures 3.2, 3.3 and 3.4.
Further details about the soil survey
and the calculation of Z Scores can
be found in the ASX Release dated
22nd April 2022.
Nine new targets have been
identified at Dinninup as follows:
Figure 3.2: Additive Z scores for Ni-Cu-Pd-Pt-Au across the Dinninup project area. Three
priority areas for follow-up work are highlighted
Nickel-copper-Platinum Group
Elements-Gold (Figure 3.2): three
new priority targets identified. The
easternmost target has a significant
response, and which covers an area
of several hundred metres across
trend. This anomaly is coincident
with a series of Proterozoic dykes
which may be a potential host for
this style of mineralisation.
Lithium-caesium-tantalum
(Figure 3.3): two new priority targets
identified with one area covering at
least several hundred metres.
Rare Earth Elements (Figure 3.4):
four new priority targets identified
with numerous other lower priority
areas also warranting follow-up.
Figure 3.3: Additive Z scores for Li-Cs-Ta across the Dinninup project area. Two priority
areas for follow up work are highlighted.
Impact Minerals Ltd Annual Report 2022
17
Review of Operations
continued
Figure 3.4: Additive Z scores for all REE across the Dinninup project area. Four priority areas for follow up work are highlighted. Note that there
are several other areas with strong responses which will also require follow-up work.
NEXT STEPS
The results of Impact’s first ever
soil geochemistry programme at
Dinninup, as at the Company’s other
projects in the region, Arkun, Beau
and Jumbo, have outlined a number
of areas for follow-up work for
nickel-copper-PGM mineralisation,
LCT pegmatites and REE. These
results further confirm the
prospectivity of this poorly explored
part of the emerging mineral
province of south west Western
Australia.
First pass follow-up field checking,
and sampling will commence in
2023, with the aim of prioritising
areas for more detailed soil
geochemistry and ground
geophysics that will extend away
from the roads and into the
surrounding paddocks. This work will
dovetail with continuing on-ground
follow-up work at Arkun and Jumbo.
In order to explore in the paddocks,
land access agreements will be
required with the relevant landowners
and this process has been initiated.
18
Impact Minerals Ltd Annual Report 2022
Review of Operations
continued
4. HOPETOUN (Impact earning 80%)
The Hopetoun project comprises
two tenements (E74/563 and
E74/679) covering 75 km2 and is
located just north of the town of
Hopetoun, close to the Ravensthorpe
mining centre (Figure 4.1). The
project covers part of the Albany
Fraser Mobile Belt which is
considered prospective for a variety
of mineral deposits. The project
contains six drill ready targets for
base and precious metals of which
two were fully permitted for drilling.
The targets were identified by
Impact’s joint venture partner using
the proprietary EPR technology
owned by Southern Sky Energy Pty
Ltd and associated soil geochemistry
anomalies in limited sampling.
During the year drilling programmes
were completed at the Top Knotch
(RC and diamond drilling) and
Silverstar (diamond drilling) prospects.
The Hopetoun area has received
very little exploration because of a
perception that much of the area
is underlain by barren Proterozoic
gneisses. In addition, there is
extensive younger cover which has
hindered previous explorers.
However, a review of the regional
airborne magnetic data over the area
suggests that much of the gneiss
terrane may be an extension of the
Ravensthorpe greenstone belt to
the north which contains numerous
mines and deposits of lithium
(Mt Cattlin mine, Allkem Limited,
ASX:AKE), nickel sulphide (the
dormant RAV 8 mine and associated
deposits), copper-gold (including
the Kundip historic mining centre,
Medallion Metals Ltd ASX:MM8),
zinc-lead-copper (Trilogy deposit,
ASX:MM8) as well as nickel laterite
(First Quantum Minerals Limited,
TSX:FM).
Accordingly, Impact on behalf of the
joint venture has applied for a new
Figure 4.1: Image of airborne magnetic data over the Ravensthorpe-Hopetoun area showing
the interpreted extension of the Ravensthorpe greenstone belt south of the Jerdacuttup Fault
together with the licences in the Hopetoun Joint Venture. The new licence is EL74/730.
exploration lice
Share your feedback
Discover