Massive Sulphide intersected at Commonwealth
Released
Released
Announcement PDF
ASX Code: IPT
MARCH 5, 2026 CORPORATE RELEASE
Massive Sulphide and Vein Sulphide intersected at
Commonwealth-Silica Hill Project, Lachlan Fold Belt
Highlights:
• Phase 1 Drilling Progress: Three diamond holes completed to date for 540m, as part of a
planned 1,200m six-hole Phase 1 diamond drilling program at Commonwealth–Silica Hill
being undertaken by Kuniko Limited
• Hole CMKNI001: 3.7m of massive sulphide within a broader disseminated and stringer
sulphide interval of 47.3m.
• Hole CMKNI002: A further 2.9m of massive sulphide within a broader disseminated and
stringer sulphide interval of 41.9m, confirming continuity of the Main Shaft massive sulphide
lens.
• Down-Plunge Step-Out Success: Both holes at Commonwealth Main represent down-plunge
step-outs to the existing massive sulphide zone, which remains open at depth and along
plunge.
• Hole CMKNI003 (Silica Hill): Approximately 60m of disseminated and stringer sulphide
mineralisation intersected, including visible silver sulphosalts, highlighting strong mineralised
continuity.
• Program Timeline: Drilling is progressing well and is expected to be completed within the
next two weeks, with assay results anticipated in April.
• Phase II Acceleration: A larger Phase II drilling campaign, focused on resource validation and
expansion, and drill testing newly defined high-priority targets from the recent Mobile MT
program, will be accelerated in parallel with Phase 1 drilling.
• KNI is well funded: A strongly supported $3.75m placement funds Phase II drilling and
advancement of the growing pipeline of high-priority district-scale targets identified across
the project area.
Impact Minerals Limited (ASX:IPT) is pleased to advise that the first three diamond drill holes have
intersected mineralisation at the Company’s Commonwealth Gold–Silver Project in New South Wales
under the Earn-In and Joint Venture Agreement with Kuniko Limited. Kuniko can earn up to a 70%
interest in the project (ASX:KNI Release March 5th 2026, which is attached).
ASX:IPT | ABN 52 119 062 261 2
Impact Minerals’ Managing Director, Dr Mike Jones, said, “Kuniko’s Phase 1 drilling has made an
excellent start, with three diamond holes completed and multiple intersections of sulphide
mineralisation intersected, including thick intervals of disseminated and stringer sulphides with
discrete massive sulphide lenses at Commonwealth Main and encouraging sulphide continuity at
Silica Hill. These down-plunge step-outs reinforce the potential for the Main Shaft lens to continue at
depth and along trend towards Commonwealth South, and we look forward to the assay results
expected in April. Importantly, Kuniko has indicated it will accelerate planning for a larger Phase II
campaign in parallel, supported by its recent $3.75 million placement, which is aimed at validating
and expanding resources and testing new high-priority MobileMT targets — outcomes that could
materially increase the value of Impact’s retained interest in the project.”
Kuniko has started a Phase 1 diamond drilling program of about 1,200 metres to explore extensions
of the high-grade gold–silver mineralisation at Commonwealth Main, Silica Hill, and Commonwealth
South.
The program follows the completion of a comprehensive MobileMT™ airborne geophysical survey
and soil and rock chip geochemistry programs, which have significantly expanded the exploration
footprint across the Project, identifying a roughly 4-kilometre-long conductive corridor that extends
beyond the currently defined resources (IPT ASX Release February 9th 2026).
Impact previously defined JORC (2012) Inferred Mineral Resources at Commonwealth and Silica Hill,
totalling 88,800 ounces of gold and 3.3 million ounces of silver, including significant zinc and lead
credits (see ASX Release September 4th 2025 for a summary). These resources are shallow, within
approximately 250 metres of surface, and remain open at depth and along strike. Importantly,
copper values increase at depth in parts of the system, highlighting the potential for a deeper
porphyry copper–gold source beneath the high-sulphidation, gold-rich VMS mineralisation.
The current drilling program is testing down-plunge and along-strike extensions to known
mineralisation, as well as priority geophysical targets identified by the MobileMT™ survey.
Additionally, recent soil and rock chip sampling by Kuniko at Gladstone West and Geenobby has
yielded promising high-grade gold–silver results, and further walk-up drill targets have been
identified.
Commonwealth is a very unusual gold-rich VMS system in Australia with strong similarities to the
world-class Eskay Creek deposit in the famed Golden Triangle of British Columbia. With defined
resources already in place and compelling deeper copper targets, this drilling program marks an
important step in unlocking the full potential of the Project.
Under the Earn-In and Joint Venture Agreement, Kuniko can earn a 51% stake by spending $1.5
million within two years, and increase to 70% by spending an additional $1.5 million within the
following two years. Impact retains a 30% free-carried interest until the Decision to Mine, offering
substantial leverage to exploration success. At a 30% interest, Impact can either contribute or dilute
down to 10% and then convert to a 2% Net Smelter Royalty.
Authorised by the Managing Director of Impact Minerals Limited.
ASX:IPT | ABN 52 119 062 261 3
Dr Michael G Jones
Managing Director
ASX Release
05.03.2026
- 1 –
Massive Sulphide and Vein Sulphide intersected at
Commonwealth-Silica Hill Project, Lachlan Fold Belt
Highlights:
▪ Phase 1 Drilling Progress: Three diamond holes completed to date for 540m, as part of a planned 1,200m
six-hole Phase 1 diamond drilling program at Commonwealth–Silica Hill.
▪ Hole CMKNI001: 3.7m of massive sulphide within a broader disseminated and stringer sulphide interval of
47.3m.
▪ Hole CMKNI002: A further 2.9m of massive sulphide within a broader disseminated and stringer sulphide
interval of 41.9m, confirming continuity of the Main Shaft massive sulphide lens.
▪ Down-Plunge Step-Out Success: Both holes at Commonwealth Main represent down-plunge step-outs to
the existing massive sulphide zone, which remains open at depth and along plunge.
▪ Hole CMKNI003 (Silica Hill): Approximately 60m of disseminated and stringer sulphide mineralisation
intersected, including visible silver sulphosalts, highlighting strong mineralised continuity.
▪ Program Timeline: Drilling is progressing well and is expected to be completed within the next two weeks,
with assay results anticipated in April.
▪ Phase II Acceleration: A larger Phase II drilling campaign, focused on resource validation and expansion,
and drill testing newly defined high-priority targets from the recent Mobile MT program, will be accelerated
in parallel with Phase 1 drilling.
▪ Funding Secured: A strongly supported $3.75m placement funds Phase II drilling and advancement of the
growing pipeline of high-priority district-scale targets identified across the project area.
Figure 1: Diamond drill core (HQ) from hole CMKNI001 showing 3.7 metres thick intercept of massive pyrite, sphalerite and galena.
Cautionary Note – Visual Estimates of Mineralisation: ‘Visual estimates of mineral abundance should never be considered a proxy or substitute
for laboratory analyses where concentrations or grades are the factor of principal economic interest. Visual estimates also potentially provide
no information regarding impurities or deleterious physical properties relevant to valuations.
- 2 –
Maja McGuire, Managing Director, commented:
“We are very encouraged by the early results from the Phase 1 drilling program at the Commonwealth Project. The
first three diamond holes have intersected significant zones of semi-massive and massive base metal sulphide
mineralisation, confirming the continuity and scale of the system.
Based on observations to date, we believe the Commonwealth Project continues to demonstrate strong potential as
a high-value gold, silver and base metals deposit.
With Phase 1 drilling ongoing and three further holes planned, we expect steady news flow in the coming months
as results are received and interpreted. In parallel, Kuniko is advancing geophysical and geochemical targeting
across the broader project area in preparation for the larger Phase 2 drilling program.
This positions the Company for a very active period of exploration as we expand and refine the mineralised footprint
at Commonwealth–Silica Hill while advancing new district-scale targets.”
Figure 2: Diamond drill core (HQ) from hole CMKNI002 showing banded sphalerite (red), pyrite (bronze), galena(blue) and chalcopyrite (yellow) core
(left) and 2.9 metres thick intercept semi massive to massive sulphide intersected down hole (right).
Cautionary Note – Visual Estimates of Mineralisation: ‘Visual estimates of mineral abundance should never be considered a proxy or substitute
for laboratory analyses where concentrations or grades are the factor of principal economic interest. Visual estimates also potentially provide
no information regarding impurities or deleterious physical properties relevant to valuations.
- 3 –
Drilling Program Update
Varying widths of sulphide mineralisation have been intersected in the three diamond drill holes completed to date
as part of the Phase I Commonwealth–Silica Hill drilling program.
At the Commonwealth Main Shaft, two diamond holes were designed to test for extensions of the known massive
sulphide mineralisation at depth and along strike. Both holes intersected zones of massive to semi-massive
sulphide comprising approximately 70–85% sulphides. Mineralisation is dominated by thick accumulations of pyrite
with interlayers of up to ~20% sphalerite and ~5% galena, with lesser chalcopyrite (Figure 2).
The massive sulphide intersectedin hole CMKNI001 occurs approximately 20m down-dip of historical hole CMIPT010
(7m @ 7.0 g/t Au, 330 g/t Ag, 7.3% Zn and 2.7% Pb) and approximately 15m along strike from CMIPT021 (8.1m @ 6.0
g/t Au, 193 g/t Ag, 5.9% Zn and 2.3% Pb).
Hole CMKNI002 intersected additional massive sulphide approximately 20m from historical hole CMIPT082 (2.6m @
7.9 g/t Au, 164 g/t Ag, 5.3% Zn and 3.1% Pb), representing a meaningful step-out from previously drilled
mineralisation where limited drilling has been completed.
Figure 3: CMKNI 003 Showing an example of “ruby red” proustite silver minerals (left) and banded pyrite/arsenopyrite veins from 10-40cm thick down
hole within a silica sericite altered rhyolite porphyry.
Cautionary Note – Visual Estimates of Mineralisation: ‘Visual estimates of mineral abundance should never be considered a proxy or substitute
for laboratory analyses where concentrations or grades are the factor of principal economic interest. Visual estimates also potentially provide
no information regarding impurities or deleterious physical properties relevant to valuations.
Importantly, these new intersections demonstrate that the Commonwealth Main massive sulphide lens remains
open at depth and down-plunge to both the north and south (Figure 4). The geometry of the intercepts also suggests
the potential for feeder-style structures beneath the massive sulphide position at Commonwealth Main Shaft.
At neighbouring Silica Hill, diamond drill hole CMKNI003 was completed to test down-dip and along-strike
extensions to previously identified high-grade gold–silver mineralisation intersected in hole CMIPT043, which
returned 68m at 0.5 g/t Au and 43 g/t Ag from 99m.
The new hole intersected approximately 60m of disseminated and stringer sulphide mineralisation, including visible
“ruby-red” silver sulphosalts, interpreted to include minerals such as proustite. Mineralisation comprises pyrite–
arsenopyrite veins up to 10 cm thick, with occasional veins up to 40 cm, hosted within strongly sulphidised rhyolite
(Figure 3). The surrounding wall rock also contains up to ~10% disseminated pyrite and arsenopyrite. The hole
represents an approximate 15m step-out from CMIPT043.
Previous work by Impact Minerals has identified two east–west trending zones of mineralisation within the south-
western portion of the Silica Hill rhyolite, referred to as the Northern Lode and Southern Lode. Hole CMKNI003
- 4 –
tested a key gap within the Southern Lode, confirming strong continuity of mineralisation over approximately 150 m
down-dip from near surface, which is encouraging in the context of potential open-pit scenarios. The fourth planned
drill hole will target the Northern Lode to test the continuity and potential extent of mineralisation along this parallel
structure.
Detailed geological interpretation of the new drill holes at both Commonwealth Main Shaft and Silica Hill is ongoing
and will be refined once assay results are received. To date, three holes have been completed as part of the planned
six-hole Phase 1 diamond drilling program. Drilling remains in progress and Kuniko will update the market as results
become available.
Figure 4: Long section of the Commonwealth project showing gold equivalent grade x thickness contours, showing historical drill intercepts and
position of recent Kuniko diamond drill holes which are open at depth.
- 5 –
Figure 5: Plan view of 3 diamond holes drilled to date in white with showing downhole traces in Ag ppm of previous drilling.
Next Steps
1. Complete the remaining three diamond drill holes in the Phase 1 program targeting:
• the Northern Lode structure at Silica Hill,
• an untested induced polarisation (IP) anomaly at Commonwealth South, and
• the down-plunge extension of mineralisation at Commonwealth South, where previous drilling returned 8m @ 5
g/t Au, 20 g/t Ag and 1.4% Zn in CMIPT086.
2. Continue interpretation of the recent MobileMT survey to further refine and prioritise regional drill targets across the
project area.
3. Plan and design a Phase 2 drilling program aimed at expanding and upgrading the Mineral Resource Estimate (MRE) at
Commonwealth–Silica Hill, while also testing regional targets identified from MobileMT and recent soil geochemistry
programs at Gladstone West and Geenobby.
4. Assessment of Gradient Array Induced Polarisation (GAIP) survey data across Geenobby and Gladstone West to identify
zones of sulphide development and associated hydrothermal alteration.
5. Advance drill targeting at Gladstone West and Geenobby, with permitting to commence for a regional drill program.
- 6 –
*Sulphide tenor py=pyrite; sp=sphalerite; ga=galena; cpy=chalcopyrite; asp=arsenopyrite; pro=proustite
Table 1: Preliminary Observations of sulphide zones intersected in recent diamond drilling.
Table 2: Drill collar table of 3 diamond holes drilled to date totalling 540m of drilling.
Hole ID From To Interval (m) Estimated Total Sulphide % Sulphide Tenor Preliminary Observations
CMKNI001 94.7 98.4 3.7 85 py>sp>ga>cpy Semi Massive to Massive Sulphide on Hanging Wallcontact
CMKNI001 98.4 138 39.6 3 py>sp>ga Disseminated and Stringer Sulphides within rhyolite porphyry
CMKNI001 138 142 4 25 py>sp>ga>cpy Disseminated and Stringer Sulphides on footwallcontact. Up to 60 cm veins of sulphide
CMKNI002 104.1 107 2.9 70 py>sp>ga>cpy Semi Massive to Massive Sulphide
CMKNI002 107 141 34 3 py>sp>ga Disseminated and Stringer Sulphides within rhyolite porphyry
CMKNI002 141 146 5 15 py>sp>ga>cpy Disseminated and Stringer Sulphides on footwallcontact.
CMKNI003 65 76 11 15 py>asp>pro Disseminated and Stringer Sulphides within rhyolite porphyry
CMKNI003 76 82 6 5 py>asp Disseminated and Stringer Sulphides within rhyolite porphyry
CMKNI003 82 87 5 15 py>asp>pro Disseminated and Stringer Sulphides within rhyolite porphyry
CMKNI003 87 92 5 5 py>asp Disseminated and Stringer Sulphides within rhyolite porphyry
CMKNI003 92 98 6 2 py>asp Disseminated and Stringer Sulphides within rhyolite porphyry
CMKNI003 98 105 7 15 py>asp>pro Disseminated and Stringer Sulphides within rhyolite porphyry
CMKNI003 105 117 12 4 py>asp Disseminated and Stringer Sulphides within rhyolite porphyry
CMKNI003 117 121 4 20 py>asp Disseminated and Stringer Sulphides within rhyolite porphyry
CMKNI003 121 125 4 2 py>asp Disseminated and Stringer Sulphides within rhyolite porphyry
Hole ID Hole Type Grid ID Easting Northing Rl Azi Dip Depth(m)
CMKNI001 DDH MGA94_55 692235 6392948 360 225 55 174
CMKNI002 DDH MGA94_55 692256 6392915 365 236 55 192.9
CMKNI003 DDH MGA94_55 692343 6393009 390 256 63 173.1
- 7 –
Commonwealth
Gold–Silver
Project Overview
The Commonwealth Project lies ~100 km north of Orange, NSW, within the prolific Lachlan Fold Belt — a Tier-1
region hosting major operations such as Cadia–Ridgeway, North Parkes and Cowal (Refer: Figure 4).
The Project comprises:
• Commonwealth deposit: a volcanogenic massive sulphide (VMS) style system containing gold, silver,
zinc, lead and copper.
• Silica Hill deposit: an epithermal/VMS hybrid system with high-grade silver-gold shoots within broader
zones.
• Regional upside: multiple untested targets including Silica Hill East, Geenobbys and Gladstone, where
geophysical and geochemical anomalies remain untested by drilling.
Impact Minerals has previously noted that the Commonwealth mineral system shares geological characteristics
with several globally recognised VMS–epithermal deposits, such as Eskay Creek in Canada, where precious
metals are closely associated with volcanic-hosted sulphide mineralisation1
. These analogies provide valuable
context for Kuniko’s exploration approach while the Company continues to develop its own geological model
specific to the Lachlan Fold Belt setting.
Impact Minerals has previously reported JORC (2012) Inferred Mineral Resource Estimates at both
Commonwealth and Silica Hill (Refer: Impact Minerals ASX releases dated 2 September 2016, 1 February 2018 and
22 August 2019). These estimates demonstrate the presence of significant gold and silver mineralisation within
a broader system that remains open along strike and depth. Kuniko notes that it has not independently verified
or adopted these estimates, and they should not be relied upon as Kuniko’s own. During Stage-1, Kuniko intends
to undertake technical work and, if appropriate, validate and update the estimates through its own Competent
Person.
With existing permits and landholder agreements in place, the Project is considered drill-ready, allowing rapid
progression of exploration programs.
Figure 6: Location of
the Commonwealth &
Silica Hill Project and
major gold–copper
deposits within the
Lachlan Fold Belt.
The Silica Hills prospect is
approximately 200 m
northeast of the northern
extent of the
Commonwealth prospect.
1
ASX:IPT “New drill targets along the Welcome Jack trend, Commonwealth Project, New South Wales” released 13 Apr. 2018.
- 8 –
Figure 7: Location of
Kuniko’s exploration
licences and key
prospects within the
Commonwealth Gold–
Silver Project, central
New South Wales.
The project covers four
granted exploration
licences (EL8212, EL8252,
EL8504 and EL8505)
encompassing multiple
gold–silver–base-metal
prospects, including
Commonwealth, Silica
Hill, Gladstone, Geenobby
and Pine Hill, situated
along the highly
prospective Lachlan Fold
Belt.
- 9 –
About Kuniko Kuniko Limited (ASX: KNI) is a mineral exploration company advancing a diversified portfolio of strategic
and critical mineral projects aligned with the global energy transition and economic security objectives.
The Company’s portfolio now includes gold, silver and base metals in Australia alongside copper, nickel,
and cobalt projects in the Nordics, and it is committed to high ethical and environmental standards for all
company activities. Key assets include:
▪ Commonwealth Gold–Silver Project (NSW, Australia): Binding earn-in and JV with Impact
Minerals (ASX: IPT) to earn up to 70% of a VMS/epithermal gold-silver system in the Lachlan Fold
Belt, hosting JORC (2012) Inferred Mineral Resource Estimates at Commonwealth and Silica Hill.
▪ Ertelien Nickel-Copper-Cobalt Project located in southern Norway, Ertelien hosts a JORC (2012)
Mineral Resource Estimate reported by Kuniko of 40Mt @ 0.25% NiEq, including 22Mt of Indicated
and 18Mt of Inferred resources (Refer: ASX release dated 12 December 2024) *.
▪ Ringerike Battery Metals Project: a license package hosting multiple Ni-Cu-Co-PGE targets
across a 20km mineralised trend, anchored by the Ertelien deposit.
▪ Skuterud Cobalt Project: has had over 1 million tonnes of cobalt ore mined historically and was
once the world’s largest cobalt producer. Kuniko’s drill programs have seen multiple cobalt
intercepts, including high grade from shallow depths, at the priority “Middagshvile” target.
▪ Vågå Copper Project: A VMS-style copper project with large-scale geophysical anomalies and
near-surface targets, including a prospective horizon with a known strike extent of ~9km. A further
shallow conductor can also be traced for several kilometres.
Kuniko is committed to ethical sourcing and responsible development. Across all projects, Kuniko
prioritises low-carbon operations, transparent stakeholder engagement, and alignment with the United
Nations Sustainable Development Goals. Its Norwegian operations benefit from access to 98% renewable
energy.
* Note: The individual average grades are 0.18% nickel, 0.12% copper, and 0.014% cobalt. Nickel equivalent (NiEq) was calculated using the formula: NiEq (%) = Ni%
+ (Cu% × 0.4091) + (Co% × 1.8182), based on metal prices of US$22,000/t Ni, US$9,000/t Cu, and US$40,000/t Co. Preliminary metallurgical test work conducted at
SGS Canada indicates potential nickel recoveries of 70–75% and copper recoveries of up to 90%. The company believes, based on this work and comparison with
similar deposits, that all metals used in the NiEq calculation have a reasonable potential to be recovered and sold.
Forward Looking
Statements
Certain information in this document refers to the intentions of Kuniko, however these are not intended
to be forecasts, forward looking statements, or statements about the future matters for the purposes of
the Corporations Act or any other applicable law. Statements regarding plans with respect to Kuniko’s
projects are forward looking statements and can generally be identified using words such as ‘project’,
‘foresee’, ‘plan’, ‘expect’, ‘aim’, ‘intend’, ‘anticipate’, ‘believe’, ‘estimate’, ‘may’, ‘should’, ‘will’ or similar
expressions. There can be no assurance that the Kuniko’s plans for its projects will proceed as expected
and there can be no assurance of future events which are subject to risk, uncertainties and other actions
that may cause Kuniko’s actual results, performance, or achievements to differ from those referred to in
this document. While the information contained in this document has been prepared in good faith, there
can be given no assurance or guarantee that the occurrence of these events referred to in the document
will occur as contemplated. Accordingly, to the maximum extent permitted by law, Kuniko and any of its
affiliates and their directors, officers, employees, agents and advisors disclaim any liability whether direct
or indirect, express or limited, contractual, tortuous, statutory or otherwise, in respect of, the accuracy,
reliability or completeness of the information in this document, or likelihood of fulfilment of any forward-
looking statement or any event or results expressed or implied in any forward-looking statement; and do
not make any representation or warranty, express or implied, as to the accuracy, reliability or
completeness of the information in this document, or likelihood of fulfilment of any forward-looking
statement or any event or results expressed or implied in any forward-looking statement; and disclaim all
responsibility and liability for these forward-looking statements (including, without limitation, liability for
negligence).
- 10 –
Competent
Person
Statement
The information in this announcement that relates to Exploration Results is based on, and fairly reflects,
information compiled or reviewed by James Cumming, a Competent Person who is a Member of the
Australian Institute of Geoscientists.
Mr Cumming has sufficient experience relevant to the style of mineralisation and type of deposit under
consideration, and to the activity being undertaken, to qualify as a Competent Person as defined in the
2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves (JORC Code).
Mr Cumming is a consultant geologist to Kuniko Limited and consents to the inclusion in this
announcement of the matters based on his information in the form and context in which it appears.
This announcement includes a summary of historic drilling, soil sampling and rock-chip assay results
originally reported by Impact Minerals Limited (ASX: IPT) between 2016 and 2023. Mr Cumming was
employed by Impact Minerals during part of that period and has reviewed the original datasets, sampling
procedures, analytical methods and QA/QC records. Based on this review and his prior involvement, he
considers the historic results to be accurate and suitable for re-release by Kuniko Limited in accordance
with the JORC Code and ASX Listing Rules.
No new
information
Except where explicitly stated, this announcement contains references to prior exploration results, all of
which have been cross-referenced to previous market announcements made by the Company. The
Company confirms that it is not aware of any new information or data that materially affects the
information included in the relevant market announcements.
This announcement includes historical assay results that are now released by Kuniko under Listing Rule
5.7. The Company confirms that it is not aware of any new information that materially affects the historical
results as originally reported.
The information in this report relating to the Mineral Resource estimate for the Ertelien Project is
extracted from the Company’s ASX announcements dated 12 December 2024. KNI confirms that it is not
aware of any new information or data that materially affects the information included in the original
announcement and that all material assumptions and technical parameters underpinning the Mineral
Resource estimate continue to apply.
Enquiries Maja McGuire, Managing Director
Telephone: +61 422 764 633
Email: mmc@kuniko.eu
Joel Ives, Company Secretary
Telephone: +61 8 6364 5095
Email: info@kuniko.eu
Authorisation This announcement has been authorised by the Board of Directors of Kuniko Limited.
- 11 –
ANNEXURE – JORC Code, 2012 Edition – Table 1
Note: The following JORC (2012) Table 1 information relates to exploration results for the Commonwealth and Silica Hill Projects, including Geenobby and Gladstone West prospects. The data originate from
historical work completed by Impact Minerals Ltd and have been reviewed by Kuniko’s Competent Person. Kuniko is not reporting or adopting any Mineral Resource Estimate, and Section 3 of the JORC
(2012) Table 1 is therefore not included.
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut channels, random chips, or
specific specialised industry standard measurement tools appropriate to
the minerals under investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample representivity and
the appropriate calibration of any measurement tools or systems used.
• Aspects of the determination of mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (e.g. ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems. Unusual
commodities or mineralisation types (e.g. submarine nodules) may
warrant disclosure of detailed information.
• This announcement covers the completion of 3 diamond holes at the Commonwealth-
Silica Hill project. Receipt of assays is awaiting. No new assays reported.
Historic results
• Half core samples-typically from NQ core and 1m RC samples
Current Drilling
• No new assays are reported in this announcement, however samples have been
submitted to the lab and were taken from HQ3 core.
• Sampling is based on visual observations of mineralisation
• Diamond drill core (HQ3 diameter) was cut in half using a diamond saw, with one half
retained in the core trays for reference and the other half submitted for analysis.
Sampling intervals were determined based on geological boundaries and typically
ranged between approximately 0.2 m and 1.0 m.
• Half-core samples were placed in labelled calico bags and transported to SGS Orange
(NSW) for sample preparation. Prepared pulps were subsequently transported to SGS
Perth (WA) for geochemical analysis.
• Gold analyses were undertaken using 50 g fire assay with AAS finish, with gravimetric
finish used for over-limit results. Multi-element analyses were completed using a
four-acid digestion followed by ICP-OES and ICP-MS finish, which is considered a
near-total digestion suitable for base metal and pathfinder element determination.
• Industry standard QAQC procedures were implemented including the insertion of
certified reference materials, blanks and duplicate samples at regular intervals
within the sample stream.
• All intervals were logged and recorded in KNI standard templates and saved in the
Company’s database. Data included: From To measurements, lithology, veining,
alteration, structures and magnetic susceptibility.
- 12 –
Criteria JORC Code explanation Commentary
Drilling
techniques
• Drill type (e.g. core, reverse circulation, open-hole
Share your feedback
Discover