Large Rare Earth Anomaly Identifed at Arkun Project
Released
Released
Announcement PDF
ASX Code: IPT
JUNE 1, 2023
LARGE REE SOIL GEOCHEMISTRY ANOMALY
IDENTIFIED AT THE ARKUN PROJECT WA
•
A large Rare Earth Element (REE) soil geochemistry anomaly about 10 kilometers long, up to 2,000
meters wide, and comprising Light and Heavy REE has been identified in the NE of the Arkun Project.
•
The anomaly, called the Horseshoe Prospect, occurs in the contact zone of an intrusion adjacent to a
major regional fault, a prime location for REE.
•
Further surveys are in progress to follow up on numerous other REE (and other metal) anomalies
identified in reconnaissance roadside soil geochemistry surveys.
•
Southwest WA is starting to emerge as an REE Province similar to the Gascoyne and Esperance areas.
•
Interpretation of nickel-copper-PGM and lithium soil geochemistry data, HeliTEM and DGPR data are in
progress.
A significant and large soil geochemistry anomaly for Rare Earth Elements (REE) and called the Horseshoe
Prospect, has been identified at Impact Minerals Limited’s (ASX: IPT) 100% owned Arkun project in the
emerging mineral province of southwest Western Australia (Figure 1).
The anomaly is about 10 kilometers long, up to 2,000 meters wide and comprises both the more valuable
Heavy Rare Earth Elements (HREE) and the Light Rare Earth Elements (LREE) (Figures 2 and 3).
The anomaly is arcuate and centered around a prominent magnetic low adjacent to a major regional fault
visible in regional magnetic data. In addition, it coincides with an elevated potassium response in regional
radiometric data (Figure 4).
This is all interpreted to indicate that the REE may be associated with a zone of potassic alteration related to
the immediate contact zone (goldilocks zone) of a weakly magnetic felsic or possibly alkaline/carbonatite
intrusion that may have migrated from depth along a major fault. Field checking and rock chip sampling are
now required to test this further and help identify specific drill targets.
Impact Minerals’ Managing Director, Dr Mike Jones, said, “The new and exciting Horseshoe Prospect is in a
prime location for REE being associated with the contact zone of an intrusion adjacent to a major fault zone.
In addition, the area is also very weathered, so there is also the potential for REE ionic clay deposits. We are
looking forward to getting our follow-up fieldwork underway to check this.
Horseshoe is just one of numerous REE anomalies we have identified in roadside sampling, and so we look
forward to further results from infill soil surveys that are underway. This and other recent discoveries in the
region suggest that southwest Western Australia could also become an REE province like the Gascoyne
Province and the Albany-Fraser Belt near Esperance. We are happy to have such a significant ground-holding
in this region.
We are also interpreting the soil geochemistry results for nickel-copper-PGM and lithium and look forward to
announcing those results when completed.’
Figure 1. Location and geology of Impact’s projects in Western Australia, including the Arkun Project and the company’s
flagship Lake Hope HPA project.
ASX:IPT | ABN 52 119 062 261
2
Figure 2. Additive response ratios for Total Rare Earth Elements (TREE) across the greater Arkun-Jumbo-Beau project
area, highlighting the Horseshoe anomaly. Grids of close-spaced sample points identify the areas covered by the new
detailed soil geochemistry surveys reported here. The linear zones of samples mark the location of previously reported
soil geochemistry samples taken on roadside traverses with numerous areas of anomalous REE identified, all requiring
detailed follow-up surveys (ASX Releases 27th October 2021 and 8th March 2022). The Horseshoe Prospect was
originally identified as anomalous in REE from the roadside traverses, and it is possible that other significant anomalies
similar to Horseshoe may be identified as soil geochemistry surveys progress throughout the project area.
Figure 3. Summed absolute soil assay values at the Horseshoe Prospect showing combined anomalism in heavy (HREE )
and light (LREE) rare earth elements.
ASX:IPT | ABN 52 119 062 261
3
Figure 4. The Horseshoe REE anomaly (top) showing its relationship to a magnetic low (ellipse) and major regional
structure (red line) in an image of regional magnetic data (middle) and potassium in an image of regional radiometric
data (bottom).
ASX:IPT | ABN 52 119 062 261
4
NEXT STEPS
The Horseshoe REE Prospect is a new and exciting target area for follow-up work which will include field
checking and rock chip sampling. This work will commence in the next Quarter.
Numerous other REE anomalies identified in the previous reconnaissance roadside soil geochemistry have
yet to be followed up. Follow-up soil geochemistry surveys are in progress, with about 1,000 samples
planned, to test some of these areas and other areas identified as prospective for nickel-copper-PGM and
lithium mineralisation. Results are due late next Quarter.
An interpretation of the nickel-copper-PGM and lithium results from the surveys reported here is still in
progress.
In addition, the re-processing of the 2022 HeliTEM survey over priority target areas for nickel-copper-PGM
mineralisation in the Arkun-Beau area has also been completed. A DGPR survey has also been conducted at
Beau, and interpretation of this data for lithium pegmatites is also in progress.
Impact has also engaged with SensOre (ASX: S3N) to help reprocess the HELITEM data and prospectivity
mapping for Nickel and Lithium. They apply integrated AI/machine learning algorithms to large datasets to
fingerprint and “predict” locations for mineral deposits.
All of this data will be synthesised to identify drill targets with the aim of completing a maiden drill program
in late 2023 or early 2024, depending on the harvest season.
ABOUT THE SOIL GEOCHEMISTRY SURVEY
Previous work by Impact across the Arkun and Beau project areas using a proprietary geophysicalgeochemical technology owned by Southern Sky Energy Pty Ltd identified 17 broad areas of interest for
follow-up work, principally for nickel-copper-platinum group metals (PGM) (ASX Release 10th June 2021).
Reconnaissance roadside soil geochemistry traverses over 15 of these areas identified 22 more specific
targets for not only nickel-copper-PGM but also, for the first time, lithium (LCT) pegmatites and Rare Earth
Elements (REE) and rubidium (ASX Releases 21st September 2021 and 27th October 2021 respectively). A
similar workflow at the adjacent Jumbo joint venture project also identified numerous targets for the same
suites of metals (ASX Releases 8th December 2021 and 8th March 2022).
Following significant time spent completing land access negotiations, which are still ongoing, a further 972
soil samples were collected over several of the initial targets at Arkun. These are the first-ever detailed soil
geochemistry programs undertaken within the Arkun project area.
The samples were taken at a spacing of 200 metres by either 200 metres or 400 metres and submitted for
the ionic leach method at ALS Laboratories in Perth. This so-called “partial digest” technique uses very dilute
chemical solutions that only extract weakly bound ions from the sample for analysis.
Many case studies have shown that partial digests tend to give better discrimination of soil geochemical
anomalies over background values. However, the weak nature of the chemical solutions used means that
the absolute values of metals returned in the analysis are much lower than those returned from more
aggressive digestion techniques such as aqua regia and four acid digests. It is the background-to-anomaly
ratio that is the critical factor to consider.
ASX:IPT | ABN 52 119 062 261
5
A response ratio is a simple measure of how anomalous a soil geochemical value for a particular element is
above that element's local background value, which is conventionally calculated as the mean of the lowest
quartile of data. The magnitude of each analytical result is then expressed as a response ratio, a “times
background” value, calculated by dividing each result by the background value. Thus, a response ratio of 3 is
three times the background.
This procedure normalises the data and allows the response ratios for individual metals that occur within
assemblages specific to nickel-copper-PGM-gold or lithium-caesium-tantalum mineralisation to be added
together to amplify the metal associations. Background values and maximum and minimum assay values for
the elements of interest are provided for reference in Table 1.
The results of the soil geochemistry survey are presented as additive response ratios in Figure 2.
COMPLIANCE STATEMENT
This report contains new Exploration Results for soil geochemistry samples across the Arkun Project.
This announcement has been approved for release to the ASX by Dr Michael Jones, the Managing Director of
Impact Minerals Limited.
Dr Michael G Jones
Managing Director
Competent Person’s Statement
The review of exploration activities and results in this report is based on information compiled by Dr Mike Jones, a Member
of the Australian Institute of Geoscientists. He is a director of the company and works for Impact Minerals Limited. He has
sufficient experience which is relevant to the style of mineralisation and types of deposits under consideration and to the
activity which he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code). Dr Jones has consented to the
inclusion in the report of the matters based on his information in the form and context in which it appears.
Response Ratio
Minimum
Maximum
Background
LCT
TREE
3
215
18.2
Ni Cu PGM
14
1104
92.3
5
2779
33.6
Table 1: Minimum, maximum and background values for combined response ratios mentioned in this report.
ppb Ni_ppb Cu_ppb Pt_ppb Pd_ppb
Sm_ppb Ta_ppb
Eu_ppb La_ppb
Gd_ppb Ce_ppb
Tb_ppb Pr_ppb
Dy_ppb Nd_ppb
Ho_ppb Sm_ppb
Er_ppb Eu_ppb
Tm_ppb Gd_ppb
Yb_ppb Tb_ppb
Lu_ppb Dy_ppb Ho_ppb Er_ppb
ResponseLi_ppb
Ratio Cs_ppb
Au_ppb Ta_ppb
Ni_ppb La_ppb
Cu_ppb Ce_ppb
Pt_ppb Pr_ppb
Pd_ppb LiNd_ppb
_ppb Cs_ppb
1
1
1
1 Minim1um 1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2537 217 103 12 Maxi275mum 166 253722 21749 138
144 166
108 2285 4975 13878 24574 14468 10875 8560 7563 7888 7496 68 75 60
103 24512 275
11.4 6.9 8.8 1.1 Background
5.5 9.0 11.4
4.1 5.1
7.5 9.0
6.2 4.1
4.8 5.1
4.5 9.1
4.5 16.8
4.4 7.5
4.6 6.2
4.7 4.8
4.9 4.5
5.1 4.5
5.4 4.4
5.3 4.6 4.7 4.9
6.9 9.1
8.8 16.8
1.1 5.5
Table 2: Minimum, maximum and background response ratio values for metals mentioned in this report.
ASX:IPT | ABN 52 119 062 261
6
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Sampling techniques
•
Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard measurement
tools appropriate to the minerals under investigation, such as
down hole gamma sondes, or handheld XRF instruments, etc).
These examples should not be taken as limiting the broad
meaning of sampling.
•
•
Soil samples of a weight of about
250 grams were taken from a depth
of about 15-20 cm below surface.
They were sieved on site to -2 mm
and placed in plastic snap seal bags
for transport to the laboratory.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
•
•
Aspects of the determination of mineralisation that are
Material to the Public Report.
•
Description of ‘industry standard’ work
The soil samples were taken at
between 400 m and 200 m spacings
within paddocks. There are sufficient
samples to calculate estimates of the
background values for the metals of
interest.
Drilling techniques
•
Drill type (e.g. core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc) and details (e.g. core
diameter, triple or standard tube, depth of diamond tails, facesampling bit or other type, whether core is oriented and if so, by
what method, etc).
Drill sample recovery
•
Method of recording and assessing core and chip sample
recoveries and results assessed.
•
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
•
Logging
Sub-sampling
techniques and
sample preparation
Commentary
N/A
•
N/A
•
The survey was completed on a
grid to ensure representative
sampling.
Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
•
No sample bias is likely.
•
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
•
N/A
•
Whether logging is qualitative or quantitative in nature. Core
(or costean, channel, etc) photography.
•
The total length and percentage of the relevant intersections
logged.
•
If core, whether cut or sawn and whether quarter, half or all
core taken.
•
N/A
•
•
N/A
If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
•
•
For all sample types, the nature, quality and appropriateness of
the sample preparation technique.
The size and distribution of the soil
samples is appropriate for first pass
exploration.
•
•
Quality control procedures adopted for all sub-sampling stages
to maximise representivity of samples.
•
Measures taken to ensure that the sampling is representative of
the in-situ material collected, including for instance results for
field duplicate/second-half sampling.
Laboratory QC procedures for soil
samples involve the use of internal
certified reference material as assay
standards, along with blanks,
duplicates and replicates.
•
•
Whether sample sizes are appropriate to the grain size of the
material being sampled.
No field duplicates were taken as this is
not warranted at this early stage of
exploration.
•
Sample sizes are appropriate.
ASX:IPT | ABN 52 119 062 261
7
Criteria
JORC Code explanation
Commentary
Quality of assay data
and laboratory tests
•
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
•
•
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining the
analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.
•
Nature of quality control procedures adopted (e.g. standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of bias) and precision
have been established.
Samples were submitted to ALS
Laboratories in Perth for analysis
by the ionic leach method MEMS23 with ICP-MS finish for 61
elements including: Ag, Au, Bi, Cd,
Co, Cr, Cs, Cu, Li, Mo, Ni, Pb, Pd, Pt,
Sn, Ta, W, Zn. Sample preparation
involved weighing out of 50 g of
the soil sample and adding a fixed
aliquot of the digest.
•
Internal laboratory checks were
within acceptable variability
•
This level of QAQC is
commensurate with the earlystage nature of investigations
•
The results have not been verified
by independent or alternative
companies. This is not required at
this stage of exploration.
•
Primary Assay data was entered
into Excel templates for plotting in
QGIS and IOGAS.
•
There are no adjustments to the
assay data.
Accuracy and quality of surveys used to locate drill holes (collar
and down-hole surveys), trenches, mine workings and other
locations used in Mineral Resource estimation.
•
Commercial handheld GPS
•
•
Datum is MGA 2020 Zone 51
South
Specification of the grid system used.
•
•
Quality and adequacy of topographic control.
Topographic control on RL is
adequate for exploration results
•
Data spacing for reporting of Exploration Results.
•
•
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
Spacing is a nominal offset 200m x
200m to 400m grid
•
N/A
•
N/A
•
There was no sample
compositing.
•
An offset grid of sample locations
was used to help reduce bias.
•
N/A
Verification of
sampling and
assaying
Location of data
points
Data spacing and
distribution
•
The verification of significant intersections by either
independent or alternative company personnel.
•
The use of twinned holes.
•
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
•
Discuss any adjustment to assay data.
•
•
Whether sample compositing has been applied.
•
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this is
known, considering the deposit type.
•
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to have
introduced a sampling bias, this should be assessed and
reported if material.
Sample security
•
The measures taken to ensure sample security.
•
Samples were delivered to the
laboratory by company personnel
Audits or reviews
•
The results of any audits or reviews of sampling techniques and
data.
•
At this stage of exploration a review
of the sampling techniques and data
by an external party is not
warranted.
Orientation of data
in relation to
geological structure
ASX:IPT | ABN 52 119 062 261
8
Section 2 Reporting of Exploration Results
Criteria listed in the preceding section also apply to this section.
Criteria
JORC Code explanation
Commentary
Mineral tenement
and land tenure
status
•
Type, reference name/number, location and ownership
including agreements or material issues with third parties such
as joint ventures, partnerships, overriding royalties, native title
interests, historical sites, wilderness or national park and
environmental settings.
•
•
The security of the tenure held at the time of reporting along
with any known impediments to obtaining a licence to operate
in the area.
The Arkun-Beau-Jumbo
Project currently comprises 9
exploration licences covering
about 2,100 km2. The
tenements are held 100% by
Aurigen Pty Ltd a 100%
owned subsidiary of Impact
Minerals Limited. Impact has
signed Land Access
agreements in place with the
various Native Title claimants
that cover the area and with
selected landowners. No
known impediment to
exploration is known
Exploration done by
other parties
•
Acknowledgment and appraisal of exploration by other parties.
•
Nil
Geology
•
Deposit type, geological setting and style of mineralisation.
•
REE mineralisation in veins and as
ionic clays
Drill hole
Information
•
A summary of all information material to the understanding of
the exploration results including a tabulation of the following
information for all Material drill holes:
•
N/A
•
easting and northing of the drill hole collar
•
elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
•
dip and azimuth of the hole
•
down hole length and interception depth
•
hole length.
•
If the exclusion of this information is justified on the basis that
the information is not Material and this exclusion does not
detract from the understanding of the report, the Competent
Person should clearly explain why this is the case.
•
In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations (e.g.
cutting of high grades) and cut-off grades are usually Material
and should be stated.
•
N/A
•
Where aggregate intercepts incorporate short lengths of highgrade results and longer lengths of low grade results, the
procedure used for such aggregation should be stated and some
typical examples of such aggregations should be shown in
detail.
•
The assumptions used for any reporting of metal equivalent
values should be clearly stated.
Relationship
between
mineralisation
widths and intercept
lengths
•
These relationships are particularly important in the reporting
of Exploration Results.
•
N/A
•
If the geometry of the mineralisation with respect to the drill
hole angle is known, its nature should be reported.
•
If it is not known and only the down hole lengths are reported,
there should be a clear statement to this effect (e.g. ‘down hole
length, true width not known’).
Diagrams
•
Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view
of drill hole collar locations and appropriate sectional views.
•
A map showing tenement
locations has been included
•
Maps showing exploration results are
provided
Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high
grades and/or widths should be practiced to avoid misleading
reporting of Exploration Results.
•
Summary assay data is reported in the
tables.
Data aggregation
methods
Balanced reporting
•
ASX:IPT | ABN 52 119 062 261
9
Criteria
JORC Code explanation
Commentary
Other substantive
exploration data
•
Other exploration data, if meaningful and material, should be
reported including (but not limited to): geological observations;
geophysical survey results; geochemical survey results; bulk
samples – size and method of treatment; metallurgical test
results; bulk density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating
substances.
•
N/A
Further work
•
The nature and scale of planned further work (e.g. tests for
lateral extensions or depth extensions or large-scale step-out
drilling).
•
Follow up soil geochemistry surveys.
•
Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling
areas, provided this information is not commercially sensitive.
ASX:IPT | ABN 52 119 062 261
10
Share your feedback
Discover