1.
Broken Hill, WA (IPT 100%:IGO earning 75%)
• IGO to drill EM conductor at Platinum Springs as soon as
practicable.
COMPANY DETAILS
Market Cap: A$17m (0.007 p/s)
Issued Capital: 2,481,370,556
ABN 52 119 062 261
• All statutory approvals are in place.
2.
Arkun-Beau, WA (IPT 100%)
• Airborne EM survey, soil geochemistry surveys, field checking and
rock chip sampling completed at priority targets for Ni-Cu-PGE.
• Extensive time spent completing Land Access Negotiations across
the project area.
• Four large and significant soil geochemistry anomalies identified at
Beau, including:
o a large copper-nickel-PGM-silver-cobalt anomaly up to 2.5 km by
1 km in size and associated with previously unrecognised layered
mafic gabbros.
o a gold-palladium anomaly about 500 metres in diameter.
o two lithium-caesium-tantalum anomalies each about 1 km in
dimension that may be part of a large zoned intrusive pegmatite
system.
• Field checking and relevant follow-up sampling of all areas were
completed in August to identify reconnaissance drill targets as
quickly as practicable.
• A reconnaissance drill programme will be organised as soon as
practicable and subject to access and the harvest period.
3.
Commonwealth, NSW (IPT 100%)
Terms agreed for the sale of a 75% interest in its 100% owned
Commonwealth Project in the Lachlan copper-gold province of New
South Wales.
4.
Corporate
Cash: $2.8
Date of AGM 24th November 2022.
26 Richardson Street
West Perth
Western Australia 6005
Phone: +61 (8) 6454 6666
Facsimile: +61 (8) 6454 6670
Email: info@impactminerals.com.au
Website: impactminerals.com.au
DIRECTORS
Mr Peter Unsworth
Chairman
Dr Michael Jones
Managing Director
Mr Paul Ingram
Non-Executive Director
Dr Frank Bierlein
Non-Executive Director
Mr Bernard Crawford
Company Secretary
OVERVIEW
During the Quarter Impact continued work on its change in strategic focus from eastern Australia to the
emerging mineral province of south west Western Australia following the recent Julimar PGE-Ni-Cu discovery
(ASX:CHN) and also the home to the world class Greenbushes lithium-tantalum mine (Figure 1).
Impact has assembled a significant number of projects in this highly prospective region, both 100% owned,
(Arkun-Beau, Dinninup, Mineral Hill and Martup) and in joint venture (Hopetoun, Jumbo, Narryer and
Dalgaranga). In addition, the Company is in a joint venture at the Doonia gold project near Kambalda (Figure 1).
Current work programmes are aimed at defining drill targets at the flagship Arkun-Beau-Jumbo area and
progressing interpretation of data at Doonia. The other projects are also being progressed via compilations of
previous work and preliminary interpretations of the surface and bedrock geology to identify areas of interest
for follow up exploration.
Figure 1. Location of Impact’s projects in Western Australia.
2|P ag e
SEPTEMBER 2022 QUARTERLY REPORT
PROJECT REPORTS
1. BROKEN HILL, NSW (IPT 100%: IGO earning 75%)
During the Quarter, the large and significant electromagnetic survey at Impact’s Broken Hill project in New
South Wales, funded IGO Limited (ASX:IGO), was completed. This work is part of a joint venture to explore for
nickel-copper-PGM on EL7390 and EL8234 where IGO has the right earn up to a 75% interest in the two
tenements (ASX Release 9th November 2021).
A significant conductor modelled to be centred at a depth of about 350 metres below surface and 420 metres
long was identified at the southern end of the nine kilometre long Moorkai Trend where previous drilling
discovered high grade nickel-copper-PGM hosted by massive sulphides.
This conductor is considered prospective for massive sulphide mineralisation based on its discrete dimensions
and high conductance and is a priority target for follow-up work (ASX Release 3rd March 2022).
IGO has indicated that it will drill this conductor as soon as practicable. All statutory approvals are in place and
drilling will commence as and when IGO can source a drill rig, either in Q4 2022 or Q1 2023.
2. ARKUN-BEAU-JUMBO Ni-Cu-PGM, WA (IPT 100% and 80%)
The following work has recently been completed across the Arkun-Beau-Jumbo Project areas:
1. An extensive airborne HELITEM electromagnetic and magnetic survey comprising 920 line kilometres
was completed on 7 blocks covering the priority soil geochemistry targets identified at Beau and Arkun
(Figures 2 and 3). Final survey data has now been received and further processing and interpretation of
the data is underway with results expected in November.
2. Extensive time has been spent completing Land Access Agreements with landowners through the Beau
and Arkun areas. A total of 25 agreements have been signed which cover the majority of the Ni-Cu-PGE
targets in the northern part of the project area and negotiations are underway for the remaining targets
in the southern part of the area. In general, there has been a very good response from landowners in
allowing exploration to commence.
3. As a result of the Land Access Agreements, Impact has been able to complete several campaigns of field
checking, soil geochemistry and rock chip sampling across some of the priority targets for Ni-Cu-PGE. A
total of 949 soil samples and 171 rock chip samples have been collected and submitted for assay.
4. Reconnaissance field checking and rock chip sampling has been completed along the main access road
at Jumbo to follow up first pass soil geochemistry results. These samples have also been submitted for
assay.
3|P ag e
SEPTEMBER 2022 QUARTERLY REPORT
This work will allow further refinement of areas of interest for follow up work which will include drilling. Access
is limited in some places until later in the year when the harvest season is completed. There is still significant
follow up work to be done on the other targets and this is a priority for Impact going forward.
Figure 2. Location of airborne HELITEM survey areas, soil geochemistry surveys and rock chip samples recently
completed by Impact.
4|P ag e
SEPTEMBER 2022 QUARTERLY REPORT
Figure 3. Airborne EM survey blocks (in red) over previous roadside soil geochemistry anomalies for Ni-Cu -PGM, Li-Cs-Ta, REE and
Rb (additive Z scores: see ASX Releases 8th March 2022, 27th October 2021 and 21st September 2021 for details).
Previous work by Impact across the Arkun and Beau project areas using a proprietary geophysical-geochemical
technology owned by Southern Sky Energy Pty Ltd, identified 17 broad areas of interest, principally for
Ni-Cu-PGM mineralisation, for follow-up work (ASX Release 10th June 2021).
Reconnaissance soil geochemistry traverses along gazetted roads and tracks over 15 of these targets identified a
total of 22 more specific targets for both Ni-Cu-PGM mineralisation and, for the first time in the area,
lithium-caesium-tantalum pegmatites and Rare Earth Elements (REE). A number of the original targets returned
anomalous soil results for more than one style of mineralisation. Targets for both Ni-Cu-PGM and lithium were
identified at Beau (ASX Release 21st September 2021).
5|P ag e
SEPTEMBER 2022 QUARTERLY REPORT
Results of the Soil Geochemistry Survey
During the Quarter four significant anomalies were identified at Beau by a more detailed follow-up soil
geochemistry survey, one each for nickel-copper-PGM and gold-palladium and two for lithium-caesiumtantalum.
The samples were taken at a spacing of 200 metres by either 200 metres or 400 metres and submitted for the
ionic leach method at ALS Laboratories in Perth.
The results of the soil geochemistry survey are described below and presented as additive response ratios in
Figures 2 to 7. Further details on the survey, the analytical technique and calculation of the response ratios can
be found in the ASX Release 15th July 2022.
1. NICKEL-COPPER-PALLADIUM-PLATINUM-GOLD RESULTS
The results for nickel-copper-palladium-platinum, together with spatially associated metals silver, cobalt and
gold are shown as additive response ratios on an image of the regional magnetic data in Figure 4. These metals
are considered pathfinder metals for many mafic-associated massive sulphide systems globally (ASX Releases
10th June 2021 and 21st September 2021).
One large coherent anomaly that is up to 2.5 km long north-south and 1 km wide with combined responses up
to 88 times background has been identified in the north west of the Beau tenement (Figure 4). Particularly
strong responses occur along two traverses (Traverse A and B, Figure 5).
On Traverse A strong responses in particular for copper-nickel-palladium-cobalt occur at the western end of the
traverse in an area where there are numerous loose boulders of layered gabbro (Figure 6).
Layered gabbros are mostly found as part of large mafic intrusions that host massive nickel-copper sulphide
deposits. Impact is the first company to record such rocks in the area. This is a highly encouraging development
and further field checking is required.
On Traverse B moderate responses for copper-nickel-cobalt-palladium occur over a broad area of about
one kilometre. This area has not been field checked and is also a priority area for follow up work.
6|P ag e
SEPTEMBER 2022 QUARTERLY REPORT
Traverse A
Traverse B
Figure 4. Combined response ratios for nickel-copper-cobalt-platinum-palladium-silver-gold-cobalt plotted on an image of
the regional magnetic data (more magnetic units in warmer colours). The main soil anomaly is highlighted and is mostly
coincident with rocks of low magnetic response and interpreted as part of a large mafic intrusion. The strong magnetic unit
in the northeast is probably a unit of banded iron formation.
7|P ag e
SEPTEMBER 2022 QUARTERLY REPORT
Traverse A
Traverse B
Figure 5. Stacked bar charts of additive response ratios for Traverse A (top) and Traverse B (bottom).
Figure 6. Loose boulder of rhythmically layered gabbro from Traverse A. Such textures occur within many layered mafic
intrusions globally that host major metal deposits.
8|P ag e
SEPTEMBER 2022 QUARTERLY REPORT
2. GOLD
A discrete gold-palladium-in-soil anomaly about 500 metres in diameter has been identified in the central part
of the Beau project (Figure 7). The responses for both metals are moderate and are associated with strong
magnesium responses. Although not discussed here, magnesium is strongly correlated with REE elements in the
soil geochemistry data and together these suggest the responses may be related to an alkaline intrusion. The
area has not been field checked and this is a priority area for further work.
Figure 7. Combined response ratios for gold-palladium-magnesium plotted on an image of the regional magnetic data
(more magnetic units in warmer colours) and showing a coherent anomaly about 500 metres in diameter. The elevated
magnesium responses show a strong correlation to elevated REE responses. This area has not been field checked.
9|P ag e
SEPTEMBER 2022 QUARTERLY REPORT
3. LITHIUM-CAESIUM-TANTALUM
Two large irregular shaped soil anomalies each about 1 kilometre in dimension with modest to strong response
ratios for lithium-caesium-tantalum have been identified in the north east and central parts of the Beau project.
As well as these three metals, there are also variable responses for the associated metals beryllium and niobium
and additive response ratios for all five metals are shown in Figure 8. Particularly strong responses occur on
Traverse C (Figure 8 and Figure 9).
These five metals commonly form part of a zoned system of pegmatites in a widely used model for exploration for
lithium-dominant pegmatites (Figure 8). Responses for the individual metals do vary significantly within the two
areas identified, but together the responses are permissive of a large zoned pegmatite system. There are
indications of such zonation along Traverse C (Figure 7). Of note, the southern anomaly also partly rings the goldpalladium anomaly, suggesting a possible genetic relationship.
Both of the geochemical anomalies occur in areas of poor outcrop and extensive laterite and require detailed
field checking and possible infill soil geochemistry samples to better define any possible zonation.
Traverse C
Figure 8. Combined response ratios for lithium-caesium-tantalum-beryllium-niobium plotted on an image of the regional
magnetic data (more magnetic units in warmer colours). These areas have not been field checked.
10 | P a g e
SEPTEMBER 2022 QUARTERLY REPORT
Traverse C
Figure 9. Stacked bar charts of additive response ratios for Traverse C. The elements are
plotted in order from bottom to top as per the exploration model and suggest they may be
part of a zoned system (Figure 7).
Figure 10. Cartoon of a widely used exploration model for zoned pegmatite systems showing
a core of beryllium (Be) dominant mineralisation passing outwards to tantalum, niobium,
lithium and caesium dominant mineralisation.
11 | P a g e
SEPTEMBER 2022 QUARTERLY REPORT
4. DISCUSSION AND NEXT STEPS
The results of Impact’s first ever detailed soil geochemistry programme at Beau and within the greater
Arkun-Beau-Jumbo project area has successfully identified four high-priority target areas for further work and
cover a wide range of battery and precious metals. The geological terrain, which is very poorly explored, is
permissive for significant mineralisation of the types discussed here, and Impact considers the results from its
exploration targeting work in this region thus far highly encouraging.
It is equally encouraging that Impact’s targeting methodology and exploration workflow exemplified here has
returned numerous areas for follow-up work and this augers well for Impact’s other projects throughout the
emerging mineral province of Western Australia where the same work flow is being applied (Figure 1).
A further 600 soil samples have already been taken across a number of other targets within the Arkun project
and have been submitted to ALS for assay. Results are expected in November.
At Beau, follow-up field checking and sampling has also been completed with the aim of prioritising areas for
reconnaissance drill traverses as soon as practicable. Access will be restricted for drilling until the harvest period
later in the year. This will however allow time for the statutory approvals to be lodged.
12 | P a g e
SEPTEMBER 2022 QUARTERLY REPORT
3. COMMONWEALTH PROJECT (IPT 100%)
As announced to ASX on 8th August 2022, Impact has agreed terms for the sale of a 75% interest in its 100%
owned Commonwealth Project in the Lachlan copper-gold province of New South Wales. The principal terms of
the sale, which is to Burrendong Minerals Limited, an unrelated public company looking to list on the ASX, are:
1. A non-refundable option fee of $25,000 for an eight-week Exclusivity Period to complete a Share
Purchase Agreement (SPA) and Joint Venture Agreement (JVA). The Exclusivity Period has been
extended to 8th November, 2022.
2. On execution of the SPA Impact to receive a non-refundable payment of $250,000 cash.
3. Following execution of the SPA Burrendong will have nine months to complete a listing on the ASX.
4. Upon listing Impact will receive a further $250,000 cash, a 19.9% interest in the newly listed company
and will also retain a 25% interest in the project.
5. The project will then operate under an Incorporated Joint Venture with Burrendong to sole fund
exploration until the earlier of the first $5 million of expenditure or a Decision to Mine.
6. Normal dilution clauses will subsequently apply and if Impact reduces to less than a 10% interest it will
convert to a royalty of 2% NSR.
7. Impact shareholders will be entitled to a priority right to subscribe for up to $3,000,000 worth of shares.
8. Impact will have the right to nominate a Director to the Board of Burrendong.
9. Upon listing, Burrendong has the right to purchase Impact’s interest in the project at a price to be
agreed between the parties or at a price determined by an independent third-party valuation.
4. HOPETOUN WA (Impact earning 80%)
During the Quarter results were received from the diamond drill programme and these are being interpreted.
Discussions are underway to renegotiate the terms of the joint venture.
5. OTHER PROJECTS
Work progressed on analysing the previous exploration results at the Dinninup, Mineral Hill, Dalgaranga and
Narryer projects.
At Doonia soil geochemistry results, along with drill assay results were received and are being interpreted.
13 | P a g e
SEPTEMBER 2022 QUARTERLY REPORT
6. CORPORATE
DATE OF AGM
The 2022 Annual General Meeting of the Company will take place on Thursday 24 November 2022. A Notice of
Meeting has been released to ASX and Shareholders have been notified.
Financial Commentary
The Quarterly Cashflow Report (Appendix 5B) for the current period provides an overview of the Company’s
financial activities.
Cash exploration expenditure for the period was 768k. Corporate and administration expenditure amounted to
$334k. The total amount paid to directors of the entity and their associates in the period (item 6.1 of the Appendix
5B) was $96k and includes salary, directors’ fees and superannuation.
Cash at September 30th was $2.8 million.
Dr Michael G Jones
Managing Director
Competent Persons Statement
Exploration Results
The review of exploration activities and results contained in this report is based on information compiled by Dr Mike Jones, a Member of the Australian
Institute of Geoscientists. He is a director of the Company and works for Impact Minerals Limited. He has sufficient experience which is releva nt to the style
of mineralisation and types of deposits under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the
2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code ). Dr Jones has consented to
the inclusion in the report of the matters based on his information in the form and context in which it appears.
Impact Minerals confirms that it is not aware of any new information or data that materially affects the information included in the previous market
announcements referred to and in the case of mineral resource estimates, that all material assumptions and technical parameters underpinning the estimates
continue to apply and have not materially changed.
14 | P a g e
SEPTEMBER 2022 QUARTERLY REPORT
Tenement Information in accordance with Listing Rule 5.3.3
Status
IPT Interest at
start of quarter
IPT Interest at
end of quarter
EL5874
Granted
100%
100%
EL8212
Granted
100%
100%
EL8252
Granted
100%
100%
EL8504
Granted
100%
100%
EL8505
Granted
100%
100%
EL7390
Granted
100%
100%
EL8234
Granted
100%
100%
EL8636
Granted
100%
100%
EL8674
Granted
100%
100%
EL8609
Granted
100%
100%
EL9036
Granted
100%
100%
EL9037
Granted
100%
100%
EL9115
Granted
100%
100%
EL9294
Granted
100%
100%
EL9384
Granted
100%
100%
ELA6519
Application
-
-
EPM26806
Granted
100%
100%
EPM27571
Granted
100%
100%
EPM27410
Granted
100%
100%
E70/5424
Granted
100%
100%
E70/5430
Granted
100%
100%
E70/5431
Granted
100%
100%
E70/5432
Granted
100%
100%
E70/5433
Granted
100%
100%
E70/5434
Granted
100%
100%
E70/5490
Granted
100%
100%
E70/5504
Granted
100%
100%
E70/5505
Granted
100%
100%
E70/5816
Granted
100%
100%
Granted
80%
80%
Project / Tenement
Commonwealth
Broken Hill
Blackridge
Arkun
Doonia
E15/1790
15 | P a g e
Location
New South Wales
New South Wales
Queensland
Western Australia
Western Australia
SEPTEMBER 2022 QUARTERLY REPORT
Status
IPT Interest at
start of quarter
IPT Interest at
end of quarter
Granted
80%
80%
Granted
80%
80%
E52/3967
Granted
80%
80%
E52/3985
Granted
80%
80%
E74/563
Earning In
-
-
EL74/730
Application
-
-
E74/679
Earning In
-
-
E70/5842
Granted
100%
100%
E70/6111
Granted
-
100%
E70/6112
Granted
-
100%
E70/6113
Granted
-
100%
E7016178
Granted
-
100%
Granted
100%
100%
Granted
100%
100%
E52/4113
Application
-
-
E52/4114
Application
-
-
Project / Tenement
Jumbo
Location
Western Australia
E70/5852
Dalgaranga
Western Australia
E59/2620
Narryer
Hopetoun
Dinninup
Martup
Western Australia
Western Australia
Western Australia
Western Australia
E70/5761
Mineral Hill
Western Australia
E70/5780
Gascoyne
16 | P a g e
Western Australia
SEPTEMBER 2022 QUARTERLY REPORT
Share your feedback
Discover