Impact Triples Groundholding Around Commonwealth
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
Date: 14 October 2016
Number: 489/131016
IMPACT TRIPLES LANDHOLDING AROUND THE
COMMONWEALTH PROJECT IN THE LACHLAN FOLD BELT, NSW
Impact Minerals Limited (ASX:IPT) is pleased to announce that it has applied for three new
exploration licences both adjacent and close to its existing 100% owned Commonwealth Project
in the highly prospective Lachlan Fold Belt north of Orange in New South Wales (Figure 1).
The new licences are prospective for gold, silver and base metals similar to that found at the
Silica Hill Prospect at Commonwealth where Impact has recently made a breakthrough
discovery of high grade gold and very high grade silver mineralisation including a highlight
result of:
41.3 metres at 2.0 g/t gold and 176 g/t silver (4.7 g/t gold equivalent) from 61 metres;
which includes 16.3 metres at 3.7 g/t gold and 246 g/t silver (7.6 g/t gold equivalent) from
86 metres and including 1.7 metres at 3.8 g/t gold and 1,176 g/t silver;
(see announcements dated 19th August, 31st August, 2nd September and 13th September 2016).
Gold equivalency calculations are based on the following US dollar prices: Gold $1326/oz; silver and $18.82/oz.
The new licences bring Impact’s total ground holdings in the Lachlan Fold Belt, home to
numerous gold and copper mines including the Cadia-Ridgeway deposits that contain more than
25 million ounces of gold and 10 million tonnes of copper, to 1,000 square kilometres.
The licences will be 100% owned by Impact and will not form part of the investment agreement
with Squadron Resources Pty Ltd (see below).
Impact Minerals’ Managing Director Dr Mike Jones said:
“To be able to put our foot on such a significant ground holding in the richly mineralised Lachlan
Fold Belt is an excellent development for Impact and its shareholders.
The work we have done at Commonwealth over the past three years has shown that rocks on both
the eastern and western side of the Molong Belt which hosts the Cadia-Ridgeway Mine and which
were perceived to be relatively unprospective, do in fact have tremendous potential for the
discovery of deposits similar to the Commmonwealth deposit and our emerging high grade goldsilver discovery at Silica Hill.
We have also shown that good detective work using good old fashioned geological thinking and
field work can lead to exploration breakthroughs. Like Commonwealth when we acquired the
project, this new ground contains abundant mineralised locations most of which have not been
drilled and are poorly understood. They are exciting projects to be working on”.
26 Richardson Street West Perth Western Australia 6005
Tel +61 (8) 6454 6666 Facsimile +61 (8) 6454 6667
Email info@impactminerals.com.au www.impactminerals.com.au
The new licences are located in three areas and all contain a large number of precious and base
metal prospects, many of which have indications of high grade mineralisation (Figure 1).
Figure 1. Location of Impact’s licences north of Orange showing geology and key prospects.
About the new Exploration Licences
New application ELA5340 forms an extension to the Commonwealth Project; ELA 5341 is located
50 km north east of Orange is called the Day Dawn Project; and ELA5342 is located 50 km north
west of Orange and is called the Pine Hill Project (Figure 1). Exploration highlights include:
ELA5340, which covers several areas between 10 km and 50 km north and east of Wellington,
encompasses many kilometres of the same rocks that host the Silica Hill and Commonwealth
mineralisation. Examples of the key prospects include the Boda and Federal Prospects.
At Boda previous rock chip samples with copper sulphide and copper oxide returned up to
1.2% copper and are associated in places with several Induced Polarisation anomalies. A
diamond drill hole to 503 m completed by Goldfields returned 141 m at 0.11% copper,
0.1 g/t gold and 33 ppm Mo including 7 m at 0.4% copper and 0.8 g/t gold including 1 m at
4 g/t gold. Stockwork and disseminated pyrite-chalcopyrite mineralisation occurs within
skarn-altered basalt and a porphyry diorite stock at depth.
At the Federal Mine rock chip samples returned up to 19.9 g/t gold from quartz-pyrite
veins in granite and up to 39.2 g/t gold and 1.2% lead from the nearby Bonnie Doon
workings. Drilling intersected up to 2 m at 1.4 g/t gold and 12 m at 0.4% gold in silicaaltered porphyry granite near the contact with surrounding sedimentary rocks.
ELA5341 to the north east of Orange also contains rocks of the same age as those at
Commonwealth. It lies 15 km east of the Copper Hill porphyry copper-gold deposit (Figure 1) and
contains rocks prospective for massive sulphide, epithermal and intrusion-related gold and base
metal deposits.
At the Day Dawn area, a number of base and precious metal prospects occur over a 2 km
strike and include the Day Dawn North, South, Southeast, Far South and Lone Pine
workings. At Day Dawn North rock chip samples returned up to 2.0 g/t gold, 720 g/t silver,
0.1% copper, 0.1% zinc and 1.7% lead. Coincident IP, PEM and SP anomalies have been
reported. Drilling intersected up to 5 m at 3.2% zinc, 0.1% copper, 0.7% lead and
9 g/t silver. Gold was not assayed for. Of note, the well respected epithermal specialist,
Dr Greg Corbett, assessed the drill core and assay data and concluded the mineralisation
displays similarities to intrusion-related epithermal systems which overprint massive
sulphide (VMS)-style mineralisation. This is a similar environment to that proposed by
Impact at Commonwealth.
ELA5342 to the north west of Orange and 10 km west of the Copper Hill deposit contains rocks of
a variety of ages that are cut by several major faults that control a number of old gold, silver and
copper mine workings in the Cumnock, Gumble and Delaneys area. In addition the sedimentary
and volcanic rocks have been intruded by granites and are prospective for so called “skarn
mineralisation” in the contact zone of the granite.
At the Delaneys Mine, drilling of two soil anomalies near the historic mine area
intersected skarn mineralisation with up to 8 m at 0.7% copper, 0.15% tin, 0.2 g/t gold and
30 g/t silver.
At the Gumble Copper Mine historic records indicate the mine produced a small tonnage of
copper oxide ore with grades in excess of 10% copper, and up to three ounces each of gold
and silver. This area has not been drilled.
At the Pine Hill Prospect drilling intersected significant skarn mineralisation and returned
19 m at 0.3% tin and 0.3% copper including 2 m at 0.6% tin and 1.0% copper. Gold was not
assayed for. A nearby hole returned 6 m at 0.3% tin and 30 m at 0.2% tin (no other assay
data) and the mineralisation remains open at depth and along strike along the granite
contact.
Next Steps
On granting of the new licences a comprehensive review of previous exploration data will be
completed before field programmes commence.
In addition, the drill programme at Commonwealth has now ceased following the completion of a
drill hole at Welcome Jack. As well as the discovery at Silica Hill and the high grade extensions
found to the Commonwealth deposit, all of the targets drilled returned variably altered and
mineralised intercepts that are very encouraging. A detailed synthesis and review of all of the
data collected over the past five months of field activities is now in progress with a view to follow
up drilling as soon as possible.
One of the main aims of the recent drill programme was to confirm that the four main areas
drilled were part of one large mineralised system covering many square kilometres. Initial work
by Impact has demonstrated that this is likely to be correct.
Impact is aiming to commence the next phase of drilling during the current Quarter subject to
statutory approvals.
Investment by Squadron Resources Pty Limited
The Commonwealth gold-silver-zinc-lead project and also Impact’s Broken Hill platinum-coppernickel project are part of the investment agreement between Impact Minerals and Squadron
Resources Pty Ltd, part of the Minderoo Group which represents the philanthropic and business
interests of Andrew and Nicola Forrest (see announcement 17 July 2015).
As part of the investment agreement Squadron can at its sole discretion, invest a further A$1
million into either or both of the projects to earn a 19.9% interest after Impact has spent a
combined total of $2.5 million on them from a total of $3 million of exploration funds provided.
Impact has now met the $2.5 million expenditure target and in accordance with the agreement
Squadron now has 90 days from 2nd September 2016 to make its investment decision.
Dr Michael G Jones
Managing Director
The review of exploration activities and results contained in this report is based on information compiled by Dr Mike Jones, a
Member of the Australian Institute of Geoscientists. He is a director of the company and works for Impact Minerals Limited.
He has sufficient experience which is relevant to the style of mineralisation and types of deposits under consideration and to
the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code). Dr Jones has consented to the
inclusion in the report of the matters based on his information in the form and context in which it appears.
Impact Minerals confirms that it is not aware of any new information or data that materially affects the information included in
the previous market announcements referred to and in the case of mineral resource estimates, that all material assumptions
and technical parameters underpinning the estimates continue to apply and have not materially changed.
APPENDIX 1 - SECTION 1 SAMPLING TECHNIQUES AND DATA
Criteria
JORC Code explanation
Commentary
Nature and quality of sampling (e.g. cut channels, random chips,
or specific specialised industry standard measurement tools
appropriate to the minerals under investigation, such as down
hole gamma sondes, or handheld XRF instruments, etc). These
examples should not be taken as limiting the broad meaning of
sampling.
Rock chip samples
Random grab samples were taken at surface which represented favourable geology and alteration to known mineralisation in
the region. Samples are variably weathered.
Soil Samples
About 250g of soil was taken from 15-20cm below surface and sieved to - 2mm size. Samples put in plastic snap seal bags.
Samples were subsequently sieved to -250 micron at SGS Laboratories for assay by aqua regia digest.
RC Drilling
Reverse Circulation (RC) percussion drilling was used to produce a 1m bulk sample (~25kg) which was collected in plastic bags
and representative 1m split samples (12.5%, or nominally 3kg) were collected using a riffle splitter and placed in a calico bag.
The cyclone was cleaned out with compressed air at the end of each hole and periodically during the drilling. Holes were drilled
to optimally intercept interpreted mineralised zones.
Diamond Drilling
Diamond drilling was used to produce drill core either with a diameter of 63.5 mm (HQ) or 47.6 mm (NQ).
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used
Rock chip samples
Representative samples at each sample site weigh between 0.8 and 1.2 kg. Sample sites were chosen due to historic rock and
soil assay results and the geophysical surveys conducted on the Commonwealth Project. Historic rock sample methods are
unknown but are considered immaterial.
Soil Samples and Drill Samples
Sample representivity was ensured by a combination of Company Procedures regarding quality control (QC) and quality
assurance / testing (QA).
Examples of QC include (but are not limited to), daily workplace and equipment inspections, as well as drilling and sampling
procedures.
Examples of QA include (but are not limited to) collection of “field duplicates”, the use of certified standards and blank samples
approximately every 50 samples
Sampling techniques
Criteria
Drilling techniques
Drill sample recovery
JORC Code explanation
Commentary
Aspects of the determination of mineralisation that are Material
to the Public Report. In cases where ‘industry standard’ work has
been done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m samples from which 3
kg was pulverised to produce a 30 g charge for fire assay’). In
other cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed information
Rock chip samples
Rock samples were sent to SGS Perth where they were crushed, dried and pulverised (total prep) to produce a 25-30 g subsamples for analysis initially by Aqua Regia digest with ICP-MS finish for base metals then by four acid digest with an ICP/AES
finish for ore grade base metal samples and lead collection fire assay with AAS finish for gold.
Soil Samples
Soil samples were sent to ACME Laboratories in Vancouver for analysis by aqua regia digest or to SGS Laboratories in Perth for
analysis by the MMI digest.
RC and diamond drill samples
RC samples and cut samples of core were submitted to ALS in Orange, NSW. Laboratory sample preparation involved: sample
crushed to 70% less than 2mm, riffle/rotary split off 1 kg, pulverise split to >85% passing 75 microns.
RC samples analysed by MEICP41 or MEOG46 for ore grade samples, aqua region digest with ICP OES analysis and AA24 fire
assay with AAS finish.
Historical diamond and RC samples were sent to Fox Anamet, Brookvale NSW where gold was determined by fire assay, base
metals by DCP and AAS methods.
Weathered samples contained gossanous sulphide material and fresh samples containing visible pyrite, galena, sphalerite and
chalcopyrite.
Drill type (e.g. core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc) and details (e.g. core
diameter, triple or standard tube, depth of diamond tails, facesampling bit or other type, whether core is oriented and if so, by
what method, etc).
Diamond drilling accounts for about 50 % of the drilling and comprises NQ (47.6 mm diameter) and HQ (63.5 mm diameter)
sized core. Impact diamond core is triple tube and is oriented. Historical diamond core was not oriented.
RC drilling accounts for about 50% of the drilling and comprises 4 inch hammer.
Method of recording and assessing core and chip sample
recoveries and results assessed
Diamond core recoveries for all holes are logged and recorded. Recoveries are estimated to be approximately >97% for the
Commonwealth Project. No significant core loss or sample recovery problems are observed in the drill core or historic reports.
RC samples were visually checked for recovery, moisture and contamination.
Measures taken to maximise sample recovery and ensure
representative nature of the samples
Diamond core is reconstructed into continuous runs on an angle iron cradle for orientation marking. Depths are checked against
the depth given on the core blocks and rod counts are routinely carried out by the driller.
The RC samples are collected by plastic bag directly from the rig-mounted cyclone and laid directly on the ground in rows of 10.
The drill cyclone and sample buckets are cleaned between rod-changes and after each hole to minimise down-hole and/or cross
contamination.
Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
No sample bias has been established.
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
Geological logging of samples followed company and industry common practice. Qualitative logging of samples included (but
not limited to); lithology, mineralogy, alteration, veining and weathering. Diamond core logging included additional fields such
as structure and geotechnical parameters.
Magnetic Susceptibility measurements were taken for each 1m RC sample and each 1m diamond core interval.
For diamond core, information on structure type, dip, dip direction, texture, shape and fill material has been recorded in the
logs. RQD data has been recorded on selected diamond holes. Handheld XRF analysis was completed at 50 cm and 1 m intervals
on diamond core and for every metre for RC samples.
Logging
Criteria
Sub-sampling
techniques and
sample preparation
Quality of assay data
and laboratory tests
Verification of
sampling and
assaying
JORC Code explanation
Commentary
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
All logging is quantitative, based on visual field estimates. Systematic photography of the diamond core in the wet and dry form
was completed.
Chip trays with representative 1m RC samples were collected and photographed then stored for future reference.
The total length and percentage of the relevant intersections
logged
All diamond drill holes were logged in full.
All RC chips samples were geologically logged by Impact’s on-site geologist on a 1m basis, with digital capture in the field.
Detailed diamond core logging, with digital capture was conducted for 100% of the core by Impact’s on-site geologist.
If core, whether cut or sawn and whether quarter, half or all core
taken.
All core samples were sampled by half core. Selected intervals of quarter core will be selected for check assays if required.
If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
RC samples were split using a riffle splitter.
For all sample types, the nature, quality and appropriateness of
the sample preparation technique.
Company procedures were followed to ensure sub-sampling adequacy and consistency. These included (but were not limited
to), daily work place inspections of sampling equipment and practices, as well as sub-sample duplicates (“field duplicates”).
Quality control procedures adopted for all sub-sampling stages
to maximise representivity of samples.
Laboratory QC procedures for rock sample assays involve the use of internal certified reference material as assay standards,
along with blanks, duplicates and replicates.
The QC procedure for historical diamond and RC samples is unknown but considered immaterial.
Measures taken to ensure that the sampling is representative of
the in situ material collected, including for instance results for
field duplicate/second-half sampling.
Sample duplicates from the historical drilling were taken from selected intervals and compared to the original assay. Quarter
core was taken for diamond samples and riffle resplits for RC samples.
Whether sample sizes are appropriate to the grain size of the
material being sampled.
The samples sizes at Commonwealth are considered appropriate since gold has been identified as predominantly fine-grained
by thin section analysis which would indicate the nugget effect is minimal.
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
An industry standard fire assay technique for samples using lead collection with an Atomic Absorption Spectrometry (AAS)
finish was used for gold and aqua regia digest for base metals and silver.
The quality of historical drill sample assays is unknown, however this is considered immaterial at this stage of exploration.
For geophysical tools, spectrometers, handheld XRF instruments,
etc, the parameters used in determining the analysis including
instrument make and model, reading times, calibrations factors
applied and their derivation, etc.
No geophysical tools were used to determine material element concentrations. A handheld XRF was used for qualitative
analysis only.
Nature of quality control procedures adopted (e.g. standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of bias) and precision have
been established.
For the rock chips, quality control procedures for assays were followed via internal laboratory protocols. Accuracy and precision
are within acceptable limits.
The quality control of historical drill sample assays is unknown, however this is considered immaterial at this stage of
exploration.
The verification of significant intersections by either independent
or alternative company personnel.
Significant intersections from drilling have not been verified by independent or alternative companies. This is not required at
this stage of exploration.
Criteria
Location of data
points
JORC Code explanation
Commentary
The use of twinned holes.
Two twin diamond holes versus historic RC holes have been drilled at Commonwealth South and Main Shaft.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Primary assay data for rock chips has been entered into standard Excel templates for plotting in Mapinfo and Target. All
historical drill data has been entered digitally by previous explorers and verified internally by Impact.
Discuss any adjustment to assay data.
No significant adjustments have been required.
Accuracy and quality of surveys used to locate drillholes (collar
and down-hole surveys), trenches, mine workings and other
locations used in Mineral Resource estimation.
Recent drill holes have been located by DGPS. Historical drill holes and mine shafts have been verified by DGPS.
Specification of the grid system used.
The grid system for Commonwealth is MGA_GDA94, Zone 55.
Quality and adequacy of topographic control.
Standard government topographic maps have been used for topographic validation. The DGPS is considered sufficiently
accurate for elevation data.
For the diamond holes, down-hole single shot surveys were conducted by the drilling contractor. Surveys were conducted at
6m, 18, 30m and then approximately every 30m down-hole.
For the RC drill holes, downhole dip surveys were taken at approximately 30m intervals and at the bottom of the hole.
Data spacing for reporting of Exploration Results.
Drill spacing of drill holes ranges between 10 and 30 m which is considered adequate for Exploration Results.
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied.
Drill spacing of drill holes ranges between 10 and 50 m and may be considered adequate for Mineral Resource and Ore reserve
estimation procedures. However estimations of grade and tonnes have not yet been made.
Whether sample compositing has been applied.
Sample compositing has been applied for quoting drill composite results only.
Whether the orientation of sampling achieves unbiased sampling
of possible structures and the extent to which this is known,
considering the deposit type.
Drilling is oriented sub-perpendicular to the mineralised trend and stratigraphic contacts as determined by field data and cross
section interpretation.
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to have
introduced a sampling bias, this should be assessed and reported
if material.
No significant sample bias has been identified from drilling due to the optimum drill orientation described above. Where
present, sample bias will be reported.
Sample security
The measures taken to ensure sample security.
For rock samples, chain of custody is managed by Impact Minerals Ltd. Samples for Commonwealth are delivered by Impact
Minerals Ltd personnel to ALS in Orange, NSW or to SGS Perth for prep and assay. Whilst in storage, they are kept in a locked
yard. Tracking sheets have been set up to track the progress of batches of samples.
Security of historic drill samples is unknown however is considered immaterial.
Audits or reviews
The results of any audits or reviews of sampling techniques and
data.
A review of the sampling techniques and data both of historic drill holes and of Impact’s procedures has been completed by
Optiro Consultants of Perth, WA.
Data spacing and
distribution
Orientation of data in
relation to geological
structure
SECTION 2 REPORTING OF EXPLORATION RESULTS
Criteria
Mineral tenement and land
tenure status
Exploration done by other
parties
JORC Code explanation
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint ventures,
partnerships, overriding royalties, native title interests, historical sites,
wilderness or national park and environmental settings.
The Commonwealth Project currently comprises 3 exploration licences covering 315 km2. The
tenements are held 100% by Endeavour Minerals Pty Ltd, a subsidiary company of Impact Minerals
Limited. No aboriginal sites or places have been declared or recorded in areas where Impact is currently
exploring. There are no national parks over the license area.
The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
The tenements are in good standing with no known impediments.
Acknowledgment and appraisal of exploration by other parties.
A total of 66 drillholes have been completed over 300 m strike between the Commonwealth main shaft
and Commonwealth South by previous explorers to an average depth of 53 m.
Deposit type, geological setting and style of mineralisation.
The Commonwealth and Commonwealth South deposits are considered gold-rich volcanic hosted
massive sulphide (VMS) deposits that occur at and below the contact with a porphyrictic rhyolite and
overlying volcanic sedimentary rocks. The mineralisation may have been overprinted by epithermal
mineralisation.
A summary of all information material to the understanding of the
exploration results including a tabulation of the following information for
all Material drill holes:
easting and northing of the drill hole collar
elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
dip and azimuth of the hole
down hole length and interception depth
hole length.
See Table in text.
In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (e.g. cutting of high grades)
and cut-off grades are usually Material and should be stated.
All reported assays have been length weighted. No top cuts have been applied. A nominal cut-off of
approximately 0.5 g/t Au has been applied.
Where aggregate intercepts incorporate short lengths of high grade
results and longer lengths of low grade results, the procedure used for
such aggregation should be stated and some typical examples of such
aggregations should be shown in detail.
High grade massive sulphide intervals internal to broader zones of disseminated sulphide mineralisation
are reported as included intervals.
The assumptions used for any reporting of metal equivalent values should
be clearly stated.
Gold equivalent values have been used in the long section. Metal prices used for the gold equivalent
were $1,650 for gold and $30 for silver. Given the high grade results, it is assumed that very high
recoveries will be achieved. However no metallurgical studies have been completed to verify this. Such
studies will be done as and when appropriate.
Geology
Drill hole Information
Data aggregation methods
Commentary
Criteria
JORC Code explanation
Commentary
Relationship between
mineralisation widths and
intercept lengths
These relationships are particularly important in the reporting of
Exploration Results.
If the geometry of the mineralisation with respect to the drill hole angle is
known, its nature should be reported.
If it is not known and only the down hole lengths are reported, there
should be a clear statement to this effect (e.g. ‘down hole length, true
width not known’).
Diagrams
Appropriate maps and sections (with scales) and tabulations of intercepts
should be included for any significant discovery being reported These
should include, but not be limited to a plan view of drill hole collar
locations and appropriate sectional views.
Refer to Figures in body of text.
Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades and/or
widths should be practiced to avoid misleading reporting of Exploration
Results.
All results reported are representative
Balanced reporting
Other substantive exploration
data
Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical survey
results; geochemical survey results; bulk samples – size and method of
treatment; metallurgical test results; bulk density, groundwater,
geotechnical and rock characteristics; potential deleterious or
contaminating substances.
Further work
The nature and scale of planned further work (e.g. tests for lateral
extensions or depth extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of possible extensions, including
the main geological interpretations and future drilling areas, provided this
information is not commercially sensitive
Historical drill holes to date have been sub-perpendicular to the mineralised trend and stratigraphy so
intervals are close to true width or otherwise stated.
Assessment of other substantive exploration data is not yet complete however considered immaterial at
this stage.
Follow up work programmes will be subject to interpretation of recent and historic results which is
ongoing.
Share your feedback
Discover