High Grade Rare PGM's at Red Hill
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
Date: 26 October 2015
Number: 437/261015
1.2 metres at 20 g/t OF RARE PGM’s AT RED HILL
Drill Hole RHD012 returns true width of 1.2 metres at:
4.6 g/t rhodium, 7.2 g/t iridium, 5.6 g/t osmium and 3.1 g/t ruthenium
in a previously reported intercept of
10.4 g/t platinum, 10.9 g/t gold, 294 g/t (9.5 ounces) palladium,
7.4% nickel, 1.8% copper and 19 g/t silver
WITHIN a thicker zone of:
3.5 metres at 1.7 g/t rhodium, 2.6 g/t iridium, 2.0 g/t osmium and 1.1 g/t ruthenium
in a previously reported intercept of
5 g/t platinum, 6 g/t gold, 144 g/t (4.6 ounces) palladium,
2.9% nickel, 2.3% copper and 14.5 g/t silver
The extremely high palladium and high platinum and gold grades are also confirmed by
repeat assays
Part of the high-grade matrix-sulphide zone in RHD012
26 Richardson Street West Perth Western Australia 6005
Tel +61 (8) 6454 6666 Facsimile +61 (8) 6454 6667
Email info@impactminerals.com.au www.impactminerals.com.au
High grades of the rare platinum group metals rhodium, iridium, osmium and ruthenium have been
returned from the extremely high grade 3.5 metre wide intercept of palladium, platinum, gold,
copper, nickel and silver from Hole RHD012 at Impact Minerals Limited’s (ASX:IPT) Broken Hill
Project in New South Wales (Figure 1 and see announcement dated 23rd October 2015).
Hole RHD012 has now returned:
3.5 metres at 159 g/t (5.3 ounces) 6PGE+gold 2.9% nickel, 2.3% copper and
14.5 g/t silver from 67.3m down hole (50 m below surface)
where the 6PGE+gold equals
1.7 g/t rhodium, 2.6 g/t iridium, 2.0 g/t osmium and 1.1 g/t ruthenium
5 g/t platinum, 6 g/t gold, 144 g/t (4.6 ounces) palladium,
including
1.2 metres at 335.8 g/t (10.8 ounces) 6PGE+gold, 7.4% nickel, 1.8% copper and
19 g/t silver from 68.5 m
where the 6PGE+gold equals
4.6 g/t rhodium, 7.2 g/t iridium, 5.6 g/t osmium and 3.1 g/t ruthenium
10.4 g/t platinum, 10.9 g/t gold, 294 g/t (9.5 ounces) palladium.
All samples were originally assayed by the fire assay technique with lead-collection at the Intertek
laboratory in Adelaide. The sample pulps were sent for repeat assays and assays for the rare PGM’s
by the fire assay technique with nickel sulphide-collection at the Intertek laboratory in Perth.
The repeat assays (three in total) have confirmed the previously reported palladium, platinum and
gold grades. Gold ranges from 10.8 g/t to 14.8 g/t, platinum from 10.3 g/t to 12.5 g/t and palladium
from 280 g/t to 300 grams per tonne.
These variations are within expectations for such high grade mineralisation. All other QA/QC is also
within tolerance and done to JORC standard for Exploration Results.
The rare PGM’s are used in many specialist hard-wearing metal alloys, electronics and for catalytic
converters.
These results, together with previously reported high grades of rare PGM’s throughout Impact’s
project area (see announcement 19th May 2015) are exceptional even on a global scale.
They indicate a potentially deep source for the parent ultramafic magmas which themselves contain
evidence of having absorbed (been “contaminated by”) extensive amounts of the surrounding
metasedimentary rocks. These two criteria, a deep source and contamination, are important
components of models for the formation of major nickel-copper-PGM deposits and this is
considered encouraging for further exploration throughout the Broken Hill project area.
Figure 1. Cross section through the Red Hill Prospect.
About the high grade intercept
The mineralised intercept comprises a 1.2 metre thick unit (approximately true width) of matrix to
locally massive copper and nickel sulphides within a 3.5 metre thick zone of variable disseminated
and vein-hosted nickel and copper mineralisation at about 50 metres below surface. The
photograph on page 1 shows about 40 cm of the matrix to massive sulphide unit.
The zone is interpreted as the down dip extension of the Upper Zone of mineralisation, one of two
zones of mineralisation intersected in Holes RHD001 and 006 beneath the Red Hill Mine (Figure 1).
The Lower Zone has not been intersected in Hole RHD012.
The mineralised intercepts discovered thus far occur in a north-south trending corridor,
sub-parallel to the general trend of the drill holes (Figure 2). Accordingly the optimal orientation
for drilling has not yet been established and the drill programme has been placed on hold pending
detailed studies to more fully understand the controls on the mineralisation.
In addition down hole EM surveys have identified a compelling conductor within 15 metres of the
mineralised intercept in RHD012 and an interpretation is in progress to accurately locate its
position. This will also be a drill target.
The drill programme will also test a strong EM conductor that is prospective for lead-zinc-silver
mineralisation (Target T2, Figure 3)).
It is anticipated that the drill programme will re-commence this week.
Figure 2. Drill hole location plan for Red Hill (see also Table 2 for drill hole details).
Figure 3. Drill Targets at Red Hill
About the Broken Hill Project (see also announcement dated 23rd October 2015)
The Broken Hill Project comprises three exploration licences that cover a 40 km trend of rocks
prospective for nickel-copper-PGE in mafic and ultramafic rocks and lead-zinc-silver in “Broken
Hill-style” deposits hosted mostly by metasedimentary and related rocks.
Two of the licences are 100% owned by Impact.
Subject to Ministerial approval, expected within a few months, Impact will acquire the third licence,
E7390 (via its 100% owned subsidiary Siouville Pty Limited), from Golden Cross Resources and this
will entitle Impact to 100% of the nickel-copper-PGE rights, previously in joint venture with Golden
Cross.
The consideration payable to Golden Cross upon Ministerial approval is $60,000 cash and a 1%
gross production royalty on all metals to which Impact and or Siouville has the rights for.
At its election Impact also has the right to buy back the royalty for $1.5 million at anytime up to a
Decision to Mine, or leave the royalty uncapped during any production.
In addition, upon the acquisition of E7390 Impact will also move to an 80-20 joint venture for
Broken-Hill style mineralisation with Silver City Minerals Limited and free-carry Silver City’s 20%
interest to a Decision to Mine.
The consideration payable to Silver City is $50,000 cash.
Squadron Resources Pty Limited has the right to invest $1 million for a 19.9% interest in the nickelcopper-PGE rights under the terms of an investment into Impact as outlined in the announcement
to the ASX dated 17 July 2015. However, Squadron is not liable for any payment of the royalty to
Golden Cross.
Squadron Resources Pty Limited has no rights to earn into the lead-zinc-silver-other metals rights.
Table 1. Significant Intercepts
Hole ID
From
To
Interval
3PGE
g/t
RHD007
RHD008
including
also including
also including
RHD012
including
Also including
364
0
7
18.6
27.7
67.3
68.5
68.0
369
29
9
24
28.3
70.8
69.7
68.5
5
29
2
5.4
0.6
3.5
1.2
0.5
0.63
8.6
22.7
16.1
29.1
155
315
153
Pt
g/t
Pd
g/t
Au
g/t
Cu %
0.02
2.7
1.7
7.6
14.4
5.0
10.4
5.1
0.02
5.5
20.6
7.8
13.2
144
294
141
0.59
0.50
0.45
0.73
1.5
6.0
10.9
6.6
0.09
2.4
2.5
3.8
12.2
2.3
1.8
10.4
Ni
%
0.1
4
0.5
0.5
0.5
0.5
2.9
7.4
1.3
Ag
g/t
Cut-off
0.80
57.8
55.8
58.6
28.3
19.4
14.5
82.2
0.1 g/t Au
0.5 g/t 3PGE
10 g/t 3PGE
10 g/t 3PGE
10 g/t 3PGE
0.5 g/t 3PGE
10 g/t 3PGE
10 g/t 3PGE
Table 2. Summary of Drill Holes
Collar ID
RHD007
RHD008
RHD009
RHD010
RHD011
RHD012
RHD013
RHD014
RHD015
RHD016
RHD017
Drill type
Diamond
Diamond
Diamond
Diamond
Diamond
Diamond
Diamond
Diamond
Diamond
Diamond
Diamond
Easting
555517.071
555381.452
555434.326
555443
555440
555379.368
555394.199
555373.806
555397
555397
555383
Northing
6454391.569
6454371.979
6454599.89
6454596
6454604
6454279.118
6454303.997
6454292.504
6454292
6454280
6454263
Dip
-70
-45
-55
-45
-50
-55
-51
-50
-54
-61
-46
Azimuth
150
178
300
110
345
10
10
345
353
342
355
Depth
420.9
50
195.3
168.4
96.5
120.5
108.5
96.5
102.3
90.5
90.6
Dr Michael G Jones
Managing Director
The review of exploration activities and results contained in this report is based on information compiled by Dr Mike Jones, a
Member of the Australian Institute of Geoscientists. He is a director of the company and works for Impact Minerals Limited. He has
sufficient experience which is relevant to the style of mineralisation and types of deposits under consideration and to the activity
which he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves (the JORC Code). Mike Jones has consented to the inclusion in the report of
the matters based on his information in the form and context in which it appears.
APPENDIX 1 - SECTION 1 SAMPLING TECHNIQUES AND DATA
Criteria
JORC Code explanation
Commentary
Nature and quality of sampling (e.g. cut channels, random chips, or specific
specialised industry standard measurement tools appropriate to the
minerals under investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should not be taken as
limiting the broad meaning of sampling.
Rock Chip Samples
Random rock samples were taken at surface which represented favourable geology and alteration to
known mineralisation in the region. Samples are variably weathered.
Soil Samples
Soil samples were taken at 50 m intervals from a hole 15-20 deep and sieved to -2mm to collect about
250 g of material.
Diamond Drilling
Diamond drilling was used to produce drill core either with a diameter of 63.5 mm (HQ) or 47.6 mm (NQ).
A handheld XRF instrument was used to analyse the drill core at 50 cm intervals.
Include reference to measures taken to ensure sample representivity and
the appropriate calibration of any measurement tools or systems used
Rock Chip Samples
Representative rock chip samples at each sample site weigh between 0.8 and 1.2 kg. Soil samples are
taken at a consistent depth below surface and sieved.
Soil Samples and Drill Samples
Sample representivity was ensured by a combination of Company Procedures regarding quality control
(QC) and quality assurance / testing (QA).
Examples of QC include (but are not limited to), daily workplace and equipment inspections, as well as
drilling and sampling procedures.
Examples of QA include (but are not limited to) collection of “field duplicates”, the use of certified
standards and blank samples approximately every 50 samples.
Aspects of the determination of mineralisation that are Material to the
Public Report. In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases more explanation may be required,
such as where there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g. submarine nodules) may
warrant disclosure of detailed information
Rock Chip and Diamond Drill Samples
Rock samples and split diamond core were sent to Intertek Adelaide where they were crushed, dried and
pulverised (total prep) to produce a 25-30 g sub-sample for analysis by four acid digest with an ICP/AES
finish for ore grade base metal samples and either lead collection or nickel sulphide fire assay with AAS or
MS finish for gold and the PGMs. Weathered samples contained gossanous sulphide material. Soil
samples were sent to SGS Perth for analysis by the MMI digest.
The XRF data is qualitative only. A comparison between the XRF results and wet chemical assay data will
be completed on receipt of final results.
Sampling techniques
Drilling techniques
Drill sample recovery
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details (e.g. core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or other type, whether core
is oriented and if so, by what method, etc).
Method of recording and assessing core and chip sample recoveries and
results assessed
Diamond Drilling comprises NQ (47.6 mm diameter) and HQ (63.5 mm diameter) sized core. Impact
diamond core is triple tube and is oriented. Historical diamond core was not oriented.
Diamond core recoveries for all holes are logged and recorded. Recoveries are estimated to be
approximately >97% for the Red Hill Prospect. No significant core loss or sample recovery problems are
observed in the drill core.
Criteria
JORC Code explanation
Commentary
Measures taken to maximise sample recovery and ensure representative
nature of the samples
Diamond core is reconstructed into continuous runs on an angle iron cradle for orientation marking.
Depths are checked against the depth given on the core blocks and rod counts are routinely carried out
by the driller.
Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain of
fine/coarse material.
No sample bias has been established.
Logging
Geological logging of samples followed company and industry common practice. Qualitative logging of
samples included (but not limited to); lithology, mineralogy, alteration, veining and weathering. Diamond
core logging included additional fields such as structure and geotechnical parameters.
Whether core and chip samples have been geologically and geotechnically
logged to a level of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical studies.
Magnetic Susceptibility measurements were taken for each 0.5 m diamond core interval.
For diamond core, information on structure type, dip, dip direction, texture, shape and fill material has
been recorded in the logs. RQD data has been recorded on selected diamond holes. Handheld XRF
analysis was completed at 50 cm intervals on diamond core.
Whether logging is qualitative or quantitative in nature. Core (or costean,
channel, etc) photography.
All logging is quantitative, based on visual field estimates. Systematic photography of the diamond core in
the wet and dry form was completed.
All diamond drill holes were logged in full.
The total length and percentage of the relevant intersections logged
Sub-sampling techniques and
sample preparation
Detailed diamond core logging, with digital capture was conducted for 100% of the core by Impact’s onsite geologist.
If core, whether cut or sawn and whether quarter, half or all core taken.
All core samples were sampled by half core. Selected intervals of quarter core will be selected for check
assays if required.
If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
No RC drilling results are reported.
For all sample types, the nature, quality and appropriateness of the sample
preparation technique.
Company procedures were followed to ensure sub-sampling adequacy and consistency. These included
(but were not limited to) daily work place inspections of sampling equipment and practices, as well as
sub-sample duplicates (“field duplicates”).
Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
Laboratory QC procedures for rock sample and diamond drill core assays involve the use of internal
certified reference material as assay standards, along with blanks, duplicates and replicates.
Measures taken to ensure that the sampling is representative of the in situ
material collected, including for instance results for field duplicate/secondhalf sampling.
Rock and Soil Samples
Field duplicates were taken at selected sample sites.
Criteria
Quality of assay data and
laboratory tests
Verification of sampling and
assaying
Location of data points
Data spacing and distribution
JORC Code explanation
Commentary
Whether sample sizes are appropriate to the grain size of the material being
sampled.
Diamond Core Samples
Quarter core duplicate samples are taken randomly every 50 samples. Sample sizes at Red Hill are
considered adequate due to mineralisation style.
The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total.
An industry standard fire assay technique for samples using lead collection with an Atomic Absorption
Spectrometry (AAS) finish was used for gold and aqua regia digest for base metals and silver.
For geophysical tools, spectrometers, handheld XRF instruments, etc, the
parameters used in determining the analysis including instrument make and
model, reading times, calibrations factors applied and their derivation, etc.
No geophysical tools were used to determine material element concentrations. A handheld XRF was used
for qualitative analysis only.
Nature of quality control procedures adopted (e.g. standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels of
accuracy (i.e. lack of bias) and precision have been established.
Rock Chip Samples
For the rock chips, quality control procedures for assays were followed via internal laboratory protocols.
Accuracy and precision are within acceptable limits.
Diamond Drill Samples
Reference standards and blanks are routinely inserted into every batch of samples at a rate of 1 in every
50 samples.
The verification of significant intersections by either independent or
alternative company personnel.
The results have not been verified by independent or alternative companies. This is not required at this
stage of exploration.
The use of twinned holes.
No drilling results are reported.
Documentation of primary data, data entry procedures, data verification,
data storage (physical and electronic) protocols.
Primary assay data for rock chips has been entered into standard Excel templates for plotting in Mapinfo.
All historical drill data has been entered digitally by previous explorers and verified internally by Impact.
Discuss any adjustment to assay data.
There are no adjustments to the assay data.
Accuracy and quality of surveys used to locate drillholes (collar and downhole surveys), trenches, mine workings and other locations used in Mineral
Resource estimation.
Sample locations and drill holes were located by hand held GPS.
Specification of the grid system used.
The grid system for Broken Hill is MGA_GDA94, Zone 54.
Quality and adequacy of topographic control.
Standard government topographic maps have been used for topographic validation.
For the diamond holes, down-hole single shot surveys were conducted by the drilling contractor. Surveys
were conducted at 15 m, 30 m and then approximately every 30 m down-hole.
Data spacing for reporting of Exploration Results.
Sample spacing for the soil survey was on a 50 m by 50 m grid.
Reconnaissance drill spacing is approximately 200 m.
Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and classifications
applied.
Estimations of grade and tonnes have not yet been made.
Criteria
JORC Code explanation
Commentary
Whether sample compositing has been applied.
Sample compositing has not been applied.
Whether the orientation of sampling achieves unbiased sampling of possible
structures and the extent to which this is known, considering the deposit
type.
Not relevant to soil and rock chip results.
The orientation of mineralisation in RHD001 yet to be determined.
If the relationship between the drilling orientation and the orientation of
key mineralised structures is considered to have introduced a sampling bias,
this should be assessed and reported if material.
Not relevant to soil and rock chip results or early stage exploration drill results.
Sample security
The measures taken to ensure sample security.
Chain of custody is managed by Impact Minerals Ltd. Samples for Broken Hill are delivered by Impact
Minerals Ltd by courier who transports them to the laboratory for prep and assay. Whilst in storage,
they are kept in a locked yard. Tracking sheets have been set up to track the progress of batches of
samples.
Audits or reviews
The results of any audits or reviews of sampling techniques and data.
At this stage of exploration a review of the sampling techniques and data by an external party is not
warranted.
Orientation of data in relation
to geological structure
SECTION 2 REPORTING OF EXPLORATION RESULTS
Criteria
JORC Code explanation
Commentary
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint ventures,
partnerships, overriding royalties, native title interests, historical sites,
wilderness or national park and environmental settings.
The Broken Hill Project currently comprises 1 exploration licences covering 100 km2. The tenement is held
100% by Golden Cross Resources Ltd. Impact Minerals Limited is earning 80% of the nickel-copper-PGE
rights in the licence from Golden Cross. No aboriginal sites or places have been declared or recorded over
the licence area. There are no national parks over the license area.
The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
The tenement is in good standing with no known impediments.
Exploration done by other
parties
Acknowledgment and appraisal of exploration by other parties.
There has been no significant previous work at this prospect.
Geology
Deposit type, geological setting and style of mineralisation.
Nickel-copper-PGE sulphide mineralisation associated with an ultramafic intrusion.
Mineral tenement and land
tenure status
Criteria
Drill hole Information
Data aggregation methods
JORC Code explanation
Commentary
A summary of all information material to the understanding of the
exploration results including a tabulation of the following information for
all Material drill holes:
easting and northing of the drill hole collar
elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
dip and azimuth of the hole
down hole length and interception depth
hole length.
See Table in text.
In reporting Exploration Results, weighting averaging techniques, maximum
and/or minimum grade truncations (e.g. cutting of high grades) and cut-off
grades are usually Material and should be stated.
All reported assays have been length weighted. No top cuts have been applied. A cut-off of approximately
0.1% Cu, 0.4% Cu and 1.0% Cu has been applied for reporting of exploration results.
Where aggregate intercepts incorporate short lengths of high grade results
and longer lengths of low grade results, the procedure used for such
aggregation should be stated and some typical examples of such
aggregations should be shown in detail.
High grade massive sulphide intervals internal to broader zones of disseminated sulphide mineralisation
are reported as included intervals.
The assumptions used for any reporting of metal equivalent values should
be clearly stated.
No metal equivalents have been reported.
Relationship between
mineralisation widths and
intercept lengths
These relationships are particularly important in the reporting of
Exploration Results.
If the geometry of the mineralisation with respect to the drill hole angle is
known, its nature should be reported.
If it is not known and only the down hole lengths are reported, there should
be a clear statement to this effect (e.g. ‘down hole length, true width not
known’).
Diagrams
Appropriate maps and sections (with scales) and tabulations of intercepts
should be included for any significant discovery being reported These
should include, but not be limited to a plan view of drill hole collar locations
and appropriate sectional views.
Refer to Figures in body of text.
Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades and/or
widths should be practiced to avoid misleading reporting of Exploration
Results.
All results reported are representative
Balanced reporting
The orientation of mineralisation in RHD001 is yet to be determined.
Criteria
JORC Code explanation
Other substantive exploration
data
Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical survey
results; geochemical survey results; bulk samples – size and method of
treatment; metallurgical test results; bulk density, groundwater,
geotechnical and rock characteristics; potential deleterious or
contaminating substances.
Further work
The nature and scale of planned further work (e.g. tests for lateral
extensions or depth extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of possible extensions, including the
main geological interpretations and future drilling areas, provided this
information is not commercially sensitive
Commentary
Assessment of other substantive exploration data is not yet complete however considered immaterial at
this stage.
Follow up work programmes will be subject to interpretation of results which is ongoing.
Share your feedback