Maiden High Grade Resource at Commonwealth, NSW
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
Date: 19 February 2015
Number: 394/190215
MAIDEN HIGH GRADE RESOURCE AT COMMONWEALTH, NSW
Impact Minerals Limited is pleased to announce a maiden Inferred Mineral Resource at the
Company’s 100% owned Commonwealth gold-silver-zinc-lead-copper project 95 km north of
Orange in New South Wales (Figure 1).
The Inferred Resource, prepared in accordance with the JORC 2012 Code by independent
resource consultants Optiro at a 0.5 g/t gold cut off is:
720,000 tonnes at 4.7 g/t gold equivalent for a contained 110,000 gold equivalent ounces
comprising 2.8 g/t gold, 48 g/t silver, 1.5% zinc, 0.6% lead and 0.1% copper.
The resource, which is open along trend and at depth, contains both massive sulphide
mineralization at the Main Shaft prospect and disseminated, vein and lesser massive
sulphide mineralization at the Commonwealth South prospect. It extends from surface to an
average depth of 90 m, has a strike length of 400 m and is up to 25 m thick (Figure 2).
A separate Inferred Mineral Resource (included within the overall resource) has also been
calculated for the massive sulphide lens at Main Shaft alone to demonstrate the high grade
nature of such deposits that are the principal target for Impact’s exploration programme.
The Main Shaft Inferred Resource is:
145,000 tonnes at 10 g/t gold equivalent for a contained 47,000 gold equivalent ounces
comprising 4.3 g/t gold, 142 g/t silver, 4.8% zinc, 1.7% lead and 0.2% copper.
Impact Minerals Managing Director, Dr Mike Jones, said:
“This maiden gold resource demonstrates the high grade nature of the mineralisation at
Commonwealth. The fact that it is open along trend and at depth indicates that further
drilling could rapidly increase the size and grade of this deposit, in particular with our focus
on the discovery of further very high grade massive sulphide bodies like that at Main Shaft.
The last line of drilling at the southern end of the deposit returned a bonanza grade intercept
of 4 m at 41 g/t gold, 93 g/t silver, 5.5% zinc and 2.3% lead in what we hope will be a new
gold-rich massive sulphide lens. Further drilling should begin in the next Quarter” he said.
“The resource contains just over 1,000 oz per vertical metre of gold equivalent from surface.
This is very encouraging for the possible future development of an open pit mine given that
such values represent a common threshold for profitable underground mines.”
26 Richardson Street West Perth Western Australia 6003
Tel +61 (8) 6454 6666 Facsimile +61 (8) 6454 6667
Email info@impactminerals.com.au www.impactminerals.com.au
Figure 1. Location of the Commonwealth Project within the Lachlan Fold Belt of NSW, home
to many significant gold and copper mines.
400 m
Main Shaft
Commonwealth South
Figure 2. Block model of the resource from Commonwealth South (left) to Main Shaft (right).
The distribution of the high grade blocks in pink show that the deposit is open along trend
and at depth.
FURTHER EXPLORATION
The resource is open along trend and at depth and extensive further resource definition
drilling is required in particular at Commonwealth South and Main Shaft (Figures 2 and 3).
At Commonwealth South, follow up drilling is required immediately along trend south of drill
hole CMIPT017 which returned:
7 m at 25.5 g/t gold, 62 g/t silver, 3.8% zinc, 1.6% lead and 0.1% copper from 88 m
down hole (about 50 m below surface) including:
4 m at 41.8 g/t (1.3 ounces per tonne) gold, 93 g/t silver, 5.5% zinc, 2.3% lead from 90
m,
and below drill hole CMIPT014 which returned:
21 m at 2.9 g/t gold, 21.6 g/t silver, 1.2% zinc and 0.6% lead from 53 metres (Figure 3).
Figure 3. Long Section between Main Shaft and Commonwealth South Prospects showing
drill hole locations, gold and silver mineralisation, IP anomalies and Impact’s drill intercepts
in yellow boxes.
Importantly, these assays come from two separate semi-massive and massive sulphide
layers, discovered by Impact for the first time at Commonwealth South, where previously
only disseminated and vein-hosted mineralisation was known. The zones are open at depth
and along trend and it is possible that they are at the edge of much larger lenses of highgrade massive sulphide similar to that at the Main Shaft Prospect.
At Main Shaft the massive sulphide lens is still open at depth and in particular to the south
east along strike from drill hole CMIPT021 which returned a best intercept of:
8.1 m at 6 g/t gold, 193 g/t silver, 5.9% zinc, 2.3% lead and 0.16% copper from 71 m including
2.9 m at 9.3 g/t gold, 201 g/t silver, 11.6% zinc, 4.7% lead and 0.25% copper from 74.9 m
down hole.
To the north of Main Shaft, the porphyry unit extends for a further 300 m and is coincident
with a zone of very anomalous gold-silver-base metal soil geochemistry that has not been
drilled.
NEXT STEPS
Follow up IP and ground gravity surveys over the resource area and also over the very
prospective Doughnut porphyry copper-gold target identified by Impact 2 km to the north
have been completed. At the Doughnut Impact has identified a large zoned elliptical zinclead-copper-gold-silver soil anomaly that is 1.2km by 750m in dimension similar to those
associated with a number of major porphyry copper-gold deposits around the world. This
area has not been previously explored (see announcement dated 1st July 2014).
Infill soil geochemistry surveys are also warranted and will be commenced upon the
completion of negotiations for land access which are in progress.
ABOUT THE MINERAL RESOURCE ESTIMATE
The Commonwealth Project comprises two areas, Commonwealth Main Shaft and
Commonwealth South. The mineralisation at Commonwealth Main Shaft is typical of a
volcanogenic massive sulphide (VMS) type system, containing high grade gold, silver, zinc,
lead and copper mineralisation which occurs at the upper contact of a porphyritic rhyolite
with the overlying volcanic sedimentary rocks. Mineralisation at Commonwealth South
occurs at both the upper and lower contacts of the porphyritic rhyolite and is dominated by
1-50 mm thick stringers and disseminations, often associated with intense brecciation and
faulting along the contacts of the porphyritic rhyolite.
The Commonwealth Resource strike length is 400 m and it is open along trend in particular
to the south. The mineralisation has been defined to a maximum depth of 150 m and is still
open.
Twenty one new holes have been drilled into the project in the last drilling campaign by
Impact. The total number of holes into the Commonwealth Project is 108, comprising
49 reverse circulation (RC) holes, 45 diamond holes, 10 underground channel samples and
four underground drillholes. Of these holes, 52 intersected the mineralisation wireframe
and were used in the estimation. Although some of the holes are historical Impact has
twinned some of the higher grade intersections and these have largely confirmed the grades
and widths.
Quality control measures employed during the last drilling programme by Impact included
the use of certified standards (1% of total sample population), field duplicates (2% of total
sample population) and blanks (2% of total sample population). No previous quality
assurance/quality control (QAQC) has been carried out at the Commonwealth Project.
Analysis of the standards and blanks showed acceptable to good levels of accuracy in the
assaying and little contamination. The duplicate samples matched the originals with a high
degree of precision.
The drillhole database was reviewed and validated. Three-dimensional solid wireframes
were constructed from sectional interpretations of the mineralisation using a nominal 0.5 g/t
gold cut-off grade. Drillhole intercepts were composited downhole to 1 m lengths and gold,
silver, copper, zinc, lead and arsenic grade estimation was carried out using ordinary kriging
with hard boundaries.
Three search passes, with increasing search distances and decreasing minimum sample
numbers, were employed to fully inform the model. Less than 1% of blocks were not filled in
the first three passes. Further estimation passes were run to assign mean grades to
unestimated blocks.
The Commonwealth Mineral Resource estimate has been classified as an Inferred Mineral
Resource in accordance with the guidelines of the Australasian Code for the Reporting of
Exploration Results, Mineral Resources and Ore Reserves (the JORC Code, 2012). Mineral
Resources have been classified on the basis of confidence in geological and grade continuity,
geological modelling confidence, grade continuity and limited QAQC. No Measured or
Indicated Mineral Resources have been defined.
The Mineral Resource estimate for the Commonwealth Project has been reported above a
0.5 ppm gold cut-off grade. The estimate has been depleted for previous historic mining.
Grades have been reported as individual elements (gold, silver, zinc, lead and copper) and, in
addition, a gold-equivalent grade has been defined. This has used the following Australian
dollar commodity prices:
Gold $1579.49 / oz; Silver $22.21 / oz; Copper $7,320 / tonne; Lead $2,345.94 / tonne;
Zinc $2,741 / tonne.
There has been no metallurgical testing of the Commonwealth mineralisation to date so no
metallurgical recoveries have been incorporated into the gold equivalent calculation. This is
commensurate with the classification of the Commonwealth prospect as an Inferred Mineral
Resource.
Dr Michael G Jones
Managing Director
The review of exploration activities and results contained in this report is based on information compiled by Dr Mike Jones, a
Member of the Australian Institute of Geoscientists. He is a director of the company and works for Impact Minerals Limited.
He has sufficient experience which is relevant to the style of mineralisation and types of deposits under consideration and to
the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code). Mike Jones has
consented to the inclusion in the report of the matters based on his information in the form and context in which it appears.
The information in this report which relates to Mineral Resources is based upon information compiled by Ian Glacken, who is
a Fellow of the Australasian Institute of Mining and Metallurgy. Ian Glacken is an employee of Optiro Pty Ltd and has
sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the
activity which he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves. Ian Glacken consents to the inclusion in the
release of a summary based upon his information in the form and context in which it appears.
APPENDIX 1 - SECTION 1 SAMPLING TECHNIQUES AND DATA
Criteria
JORC Code explanation
Commentary
Nature and quality of sampling (e.g. cut channels, random chips, or
specific specialised industry standard measurement tools
appropriate to the minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc). These examples
should not be taken as limiting the broad meaning of sampling.
Rock chip samples
Random grab samples were taken at surface which represented favourable geology and alteration to known mineralisation in the
region. Samples are variably weathered.
Soil Samples
About 250g of soil was taken from 15-20cm below surface and sieved to - 2mm size. Samples put in plastic snap seal bags. Samples
were subsequently sieved to -250 micron at SGS Laboratories for assay by aqua regia digest.
RC Drilling
Reverse Circulation (RC) percussion drilling was used to produce a 1m bulk sample (~25kg) which was collected in plastic bags and
representative 1m split samples (12.5%, or nominally 3kg) were collected using a riffle splitter and placed in a calico bag. The cyclone
was cleaned out with compressed air at the end of each hole and periodically during the drilling. Holes were drilled to optimally
intercept interpreted mineralised zones.
Diamond Drilling
Diamond drilling was used to produce drill core either with a diameter of 63.5 mm (HQ) or 47.6 mm (NQ).
Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or
systems used
Rock chip samples
Representative samples at each sample site weigh between 0.8 and 1.2 kg. Sample sites were chosen due to historic rock and soil
assay results and the geophysical surveys conducted on the Commonwealth Project. Historic rock sample methods are unknown but
are considered immaterial.
Soil Samples and Drill Samples
Sample representivity was ensured by a combination of Company Procedures regarding quality control (QC) and quality assurance /
testing (QA).
Examples of QC include (but are not limited to), daily workplace and equipment inspections, as well as drilling and sampling
procedures.
Examples of QA include (but are not limited to) collection of “field duplicates”, the use of certified standards and blank samples
approximately every 50 samples
Aspects of the determination of mineralisation that are Material to
the Public Report. In cases where ‘industry standard’ work has been
done this would be relatively simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other cases more
explanation may be required, such as where there is coarse gold
that has inherent sampling problems. Unusual commodities or
mineralisation types (e.g. submarine nodules) may warrant
disclosure of detailed information
Rock chip samples
Rock samples were sent to SGS Perth where they were crushed, dried and pulverised (total prep) to produce a 25-30 g sub-samples
for analysis initially by Aqua Regia digest with ICP-MS finish for base metals then by four acid digest with an ICP/AES finish for ore
grade base metal samples and lead collection fire assay with AAS finish for gold.
Soil Samples
Soil samples were sent to ACME Laboratories in Vancouver for analysis by aqua regia digest or to SGS Laboratories in Perth for
analysis by the MMI digest.
RC and diamond drill samples
RC samples and cut samples of core were submitted to ALS in Orange, NSW. Laboratory sample preparation involved: sample crushed
to 70% less than 2mm, riffle/rotary split off 1 kg, pulverise split to >85% passing 75 microns.
RC samples analysed by MEICP41 or MEOG46 for ore grade samples, aqua regia digest with ICP OES analysis and AA24 fire assay with
AAS finish.
Historical diamond and RC samples were sent to Fox Anamet, Brookvale NSW where gold was determined by fire assay, base metals
by DCP and AAS methods.
Weathered samples contained gossanous sulphide material and fresh samples containing visible pyrite, galena, sphalerite and
chalcopyrite.
Sampling techniques
Criteria
Drilling techniques
Drill sample recovery
JORC Code explanation
Commentary
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary
air blast, auger, Bangka, sonic, etc) and details (e.g. core diameter,
triple or standard tube, depth of diamond tails, face-sampling bit or
other type, whether core is oriented and if so, by what method, etc).
Diamond drilling accounts for about 50 % of the drilling and comprises NQ (47.6 mm diameter) and HQ (63.5 mm diameter) sized
core. Impact diamond core is triple tube and is oriented. Historical diamond core was not oriented.
RC drilling accounts for about 50% of the drilling and comprises 4 inch hammer.
Method of recording and assessing core and chip sample recoveries
and results assessed
Diamond core recoveries for all holes are logged and recorded. Recoveries are estimated to be approximately >97% for the
Commonwealth Project. No significant core loss or sample recovery problems are observed in the drill core or historic reports. RC
samples were visually checked for recovery, moisture and contamination.
Diamond core is reconstructed into continuous runs on an angle iron cradle for orientation marking. Depths are checked against the
depth given on the core blocks and rod counts are routinely carried out by the driller.
Measures taken to maximise sample recovery and ensure
representative nature of the samples
Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
Logging
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
The RC samples are collected by plastic bag directly from the rig-mounted cyclone and laid directly on the ground in rows of 10. The
drill cyclone and sample buckets are cleaned between rod-changes and after each hole to minimise down-hole and/or cross
contamination.
No sample bias has been established.
Geological logging of samples followed company and industry common practice. Qualitative logging of samples included (but not
limited to); lithology, mineralogy, alteration, veining and weathering. Diamond core logging included additional fields such as
structure and geotechnical parameters.
Magnetic Susceptibility measurements were taken for each 1m RC sample and each 1m diamond core interval.
For diamond core, information on structure type, dip, dip direction, texture, shape and fill material has been recorded in the logs.
RQD data has been recorded on selected diamond holes. Handheld XRF analysis was completed at 50 cm and 1 m intervals on
diamond core and for every metre for RC samples.
All logging is quantitative, based on visual field estimates. Systematic photography of the diamond core in the wet and dry form was
completed.
Chip trays with representative 1m RC samples were collected and photographed then stored for future reference.
All diamond drill holes were logged in full.
The total length and percentage of the relevant intersections logged
All RC chips samples were geologically logged by Impact’s on-site geologist on a 1m basis, with digital capture in the field.
Detailed diamond core logging, with digital capture was conducted for 100% of the core by Impact’s on-site geologist.
Sub-sampling
techniques and sample
preparation
If core, whether cut or sawn and whether quarter, half or all core
taken.
All core samples were sampled by half core. Selected intervals of quarter core will be selected for check assays if required.
If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
RC samples were split using a riffle splitter.
Criteria
JORC Code explanation
Commentary
For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
Company procedures were followed to ensure sub-sampling adequacy and consistency. These included (but were not limited to),
daily work place inspections of sampling equipment and practices, as well as sub-sample duplicates (“field duplicates”).
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Quality of assay data
and laboratory tests
Laboratory QC procedures for rock sample assays involve the use of internal certified reference material as assay standards, along
with blanks, duplicates and replicates.
The QC procedure for historical diamond and RC samples is unknown but is assumed to have been minimal; however, the impact of
historical samples has been somewhat mitigated by recent drilling.
Measures taken to ensure that the sampling is representative of the
in situ material collected, including for instance results for field
duplicate/second-half sampling.
Sample duplicates from the historical drilling were taken from selected intervals and compared to the original assay. Quarter core
was taken for diamond samples and riffle resplits for RC samples.
Whether sample sizes are appropriate to the grain size of the
material being sampled.
The samples sizes at Commonwealth are considered appropriate since gold has been identified as predominantly fine-grained by thin
section analysis which would indicate the nugget effect is minimal.
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
For geophysical tools, spectrometers, handheld XRF instruments,
etc, the parameters used in determining the analysis including
instrument make and model, reading times, calibrations factors
applied and their derivation, etc.
An industry standard fire assay technique for samples using lead collection with an Atomic Absorption Spectrometry (AAS) finish was
used for gold and aqua regia digest for base metals and silver.
The quality of historical drill sample assays is unknown; however it is reasonable to assume that core samples were representative of
the mineralisation.
No geophysical tools were used to determine material element concentrations. A handheld XRF was used for qualitative analysis only.
For the rock chips, quality control procedures for assays were followed via internal laboratory protocols. Accuracy and precision are
within acceptable limits.
Nature of quality control procedures adopted (e.g. standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of bias) and precision have
been established.
Reference standards and blanks are routinely inserted into every batch of samples at a rate of 1 in every 25 samples in the Impact
drilling. Impact’s inserted standards in general showed results within expected ranges. The calculated means for Lab standards are
very close to expected for the majority of standards and are within industry expectations.
Laboratoy repeat checks and original samples correlated very well.
There is minimal quality control of historical drill sample assays. Twin holes have been drilled to verify historical drilling.
The QAQC results indicate that the assays used for resource estimation are a fair representation of the material that has been
sampled.
Verification of
sampling and assaying
The verification of significant intersections by either independent or
alternative company personnel.
Significant intersections from drilling have not been verified by independent or alternative companies or by Impact.
The use of twinned holes.
Two twin diamond holes versus historic RC holes have been drilled at Commonwealth South and Main Shaft.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Primary assay data for rock chips has been entered into standard Excel templates for plotting in Mapinfo and Target. All historical
drill data has been entered digitally by previous explorers and verified internally by Impact.
Criteria
JORC Code explanation
Discuss any adjustment to assay data.
Location of data points
Accuracy and quality of surveys used to locate drillholes (collar and
down-hole surveys), trenches, mine workings and other locations
used in Mineral Resource estimation.
Specification of the grid system used.
Commentary
No significant adjustments have been required.
Recent drill holes have been located by DGPS. Historical drill holes and mine shafts have been verified by DGPS.
The grid system for Commonwealth is MGA_GDA94, Zone 55.
Standard government topographic maps have been used for topographic validation. The DGPS is considered sufficiently accurate for
elevation data.
Quality and adequacy of topographic control.
For the diamond holes, down-hole single shot surveys were conducted by the drilling contractor. Surveys were conducted at 6m, 18,
30m and then approximately every 30m down-hole.
For the RC drill holes, downhole dip surveys were taken at approximately 30m intervals and at the bottom of the hole.
Data spacing and
distribution
Data spacing for reporting of Exploration Results.
Drill spacing of drill holes ranges between 10 and 30 m which is considered adequate for Exploration Results.
Whether the data spacing and distribution is sufficient to establish
the degree of geological and grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation procedure(s) and
classifications applied.
Spacing of drill holes ranges between 10 m and 50 m on section and are considered adequate for Mineral Resource estimation
procedures.
Whether sample compositing has been applied.
Sample compositing has been applied for quoting drill composite results only.
Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known,
considering the deposit type.
Drilling is oriented sub-perpendicular to the mineralised trend and stratigraphic contacts as determined by field data and cross
section interpretation.
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to have
introduced a sampling bias, this should be assessed and reported if
material.
No significant sample bias has been identified from drilling due to the optimum drill orientation described above. Where present,
sample bias will be reported.
Sample security
The measures taken to ensure sample security.
For rock samples, chain of custody is managed by Impact Minerals Ltd. Samples for Commonwealth are delivered by Impact Minerals
Ltd personnel to ALS in Orange, NSW or to SGS Perth for prep and assay. Whilst in storage, they are kept in a locked yard. Tracking
sheets have been set up to track the progress of batches of samples.
Security of historic drill samples is unknown however is considered immaterial.
Audits or reviews
The results of any audits or reviews of sampling techniques and
data.
A review of the sampling techniques and data both of historic drill holes and of Impact’s procedures has been completed by Optiro
Consultants of Perth, WA.
Orientation of data in
relation to geological
structure
SECTION 2 REPORTING OF EXPLORATION RESULTS
Criteria
JORC Code explanation
Commentary
Mineral tenement and
land tenure status
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
The Commonwealth Project currently comprises 3 exploration licences covering 315 km 2. The tenements are held 100% by
Endeavour Minerals Pty Ltd, a subsidiary company of Impact Minerals Limited. No aboriginal sites or places have been declared or
recorded in areas where Impact is currently exploring. There are no national parks over the license area.
The security of the tenure held at the time of reporting along with
any known impediments to obtaining a licence to operate in the
area.
The tenements are in good standing with no known impediments.
Acknowledgment and appraisal of exploration by other parties.
A total of 66 drillholes have been completed over 300 m strike between the Commonwealth main shaft and Commonwealth
South by previous explorers to an average depth of 53 m.
Deposit type, geological setting and style of mineralisation.
The Commonwealth and Commonwealth South deposits are considered gold-rich volcanic hosted massive sulphide (VMS)
deposits that occur at and below the contact with a porphyritic rhyolite and overlying volcanic sedimentary rocks. The
mineralisation may have been overprinted by epithermal mineralisation.
Exploration done by
other parties
Geology
Drill hole Information
Data aggregation
methods
A summary of all information material to the understanding of the
exploration results including a tabulation of the following
information for all Material drill holes:
easting and northing of the drill hole collar
elevation or RL (Reduced Level – elevation above sea
level in metres) of the drill hole collar
dip and azimuth of the hole
down hole length and interception depth
hole length.
A tabulation of this information is considered not material for this inferred mineral resource.
In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (e.g. cutting of high
grades) and cut-off grades are usually Material and should be
stated.
All reported assays have been length weighted. No top cuts have been applied in the reporting of the drill assays. A nominal cutoff of approximately 0.5 g/t Au has been applied.
Where aggregate intercepts incorporate short lengths of high
grade results and longer lengths of low grade results, the
procedure used for such aggregation should be stated and some
typical examples of such aggregations should be shown in detail.
High grade massive sulphide intervals internal to broader zones of disseminated sulphide mineralisation are reported as included
intervals.
The assumptions used for any reporting of metal equivalent values
should be clearly stated.
Gold equivalent values have been used in the long section and in the resource calculation. Australian metal prices used for the
gold equivalent were $1,580/oz gold, $22/oz silver, $2,740/t zinc, $2,396/t lead and $7,320/t copper. Given the high grade
results, it is assumed that very high recoveries will be achieved. However no metallurgical studies have been completed to verify
this. Such studies will be done as and when appropriate.
Criteria
JORC Code explanation
Relationship between
mineralisation widths
and intercept lengths
These relationships are particularly important in the reporting of
Exploration Results.
If the geometry of the mineralisation with respect to the drill hole
angle is known, its nature should be reported.
If it is not known and only the d
Share your feedback
Discover