COMPANY DETAILS
Market Cap: A$32.9m (0.008 p/s)
1. Lake Hope High Purity Alumina (HPA) Project, WA (IPT earning 80%)
•
•
•
•
•
•
•
Positive results of a Preliminary Feasibility Study (PFS) for the Company’s Lake
Hope High Purity Alumina (HPA) Project
Very strong economic metrics and low-cost production:
NPV10 A$1.165 billion (with no by-product revenue)
Capex A$259 million
Opex US$5,860 per tonne of HPA excluding by-product credit
Potential Opex of <US$4,500 per tonne of HPA with by-product credit
Maiden Probable and Proved Ore Reserve of:
1.7 Mt at 26% Al2O3 for 450,000 tonnes of contained Al2O3.
Election to proceed to an 80% interest in Playa One Pty Ltd providing Impact
with 80% ownership in the Lake Hope project and intellectual property.
Definitive Feasibility Study to commence with construction of pilot plant and
investigation into the integration of Lake Hope with the HiPurA process.
Issued Capital: 4,113,329,968
ABN 52 119 062 261
9 Richardson Street
West Perth
Western Australia 6005
Phone: +61 (8) 6454 6666
Email:
info@impactminerals.com.au
Website: impactminerals.com.au
DIRECTORS
2. Acquisition of a 50% shareholding in Alluminous Pty Ltd
•
Potential to accelerate Impact’s entry into the HPA market by up to two years,
providing a significant time and cost advantage compared to the current
projected timeline.
•
HiPurA® is complementary to the Lake Hope Project, which remains central to
Impact’s strategy.
•
Immediate access to the HiPurA® HPA process, which has
demonstrated >99.99% (4N) purity and is designed to be scalable.
•
A pilot plant that is largely constructed and nearing commissioning, with
modest additional capital expenditure required to commence production and
generate product samples.
•
Ownership of a fully equipped HPA laboratory and micro-plant eliminates the
need for third-party testing, and enables faster customer qualification and
process optimisation.
Mr Peter Unsworth
Chairman
Dr Michael Jones
Managing Director
Mr Paul Ingram
Non-Executive Director
Dr Frank Bierlein
Non-Executive Director
Mr Arron Canicais
Company Secretary
•
Potential integration of the Lake Hope resource into HiPurA® via back-engineering, while unlocking a new
pathway using chemical feedstocks. This allows both commercial options to be pursued to reach a
streamlined path to market.
•
Supports strategic alignment with Impact’s CRC-P research grant, allowing integration of membrane
technologies and strengthening government funding prospects.
Involvement of the original HiPurA® inventors, which together with Impact’s own HPA capabilities, ensures
technical continuity, deep expertise, and innovation-led process improvements.
Partnership with experienced North American investors may provide exposure to additional funding
opportunities and global customer networks in high-growth HPA markets including batteries,
semiconductors, and LEDs.
The total acquisition cost of $2.2 million will be shared equally by Impact and the other shareholders of
Alluminous. Impact's share is $1.1 million. This structure is expected to lower Impact’s financial exposure
and share technical and financial responsibilities.
•
•
•
3. Arkun-Beau, WA (IPT 100%)
•
Delays by DEMIRS in statutory approvals delayed the planned start of drilling of the Caligula target.
During this delay, seeding and the winter rains season started, and at the request of the landowners the
programme has been delayed until after the harvest period in December.
4. Broken Hill (IPT 100%)
•
A magnetotellurics (MT) and audio-magnetotellurics (AMT) survey has been planned to follow up
promising anomalies in a MT/AMT survey completed in 2023 as part of the BHP Xplor program. This work
will be completed in the following quarter.
•
Landowner access agreements and other regulatory documents were finalised in advance of future field
work.
•
Field visit with land holder meetings completed.
•
Review of exploration completed by the Company in prior years and generation of work programs to
expand the most prospective prospects.
•
Data gathering and database update to include recently acquired tenements EL8434 and EL8435.
5. Commonwealth Project (IPT 100%)
•
Efforts continued to divest the Commonwealth project with a number of interested parties currently
reviewing the data room.
6. Corporate/Finance
•
Cash as of June 30th was $2.43 million
2|Page
ASX ANNOUNCEMENT
PROJECT REPORTS
1.
LAKE HOPE HIGH PURITY ALUMINA PROJECT, WA (IPT earning 80%)
Impact Minerals Limited (ASX:IPT) was pleased to announce the positive results of its Preliminary Feasibility
Study (PFS) for the Company’s Lake Hope High Purity Alumina (HPA) Project, located 500 km southeast of
Perth in the Tier 1 mining jurisdiction of Western Australia released to the ASX on June 17th 2025. The PFS
results align with those of the Scoping Study on the project released to the ASX on November 9 th 2023.
The PFS highlights the project's exceptionally strong economics and outlines a pathway for Lake Hope to
become a global supplier of low-cost, low-carbon HPA, benefiting both the local Ngadju Aboriginal Native title
holders and the broader community. The robust economics stem from the unique characteristics of the Lake
Hope deposit, which facilitate cost-effective mining and processing.
The PFS confirms that, to the best of Impact's knowledge based on published data, the Lake Hope project
could be among the lowest-cost producers of HPA globally, potentially by a significant margin of at least 30%.
Given these strong fundamentals, Impact will issue 120 million shares, escrowed for 12 months, to exercise its
option to acquire an 80% interest in Playa One Pty Ltd, which owns the Lake Hope assets and intellectual
property, including two patents for metallurgical processes (ASX Release March 21st 2023).
Work will now commence on a Definitive Feasibility Study (DFS), which will include the construction of a pilot
plant to produce HPA samples at scale for discussions on offtake agreements. The pilot plant project, currently
underway, will be part-funded by the recent federal government grant awarded to Impact Minerals in
collaboration with CPC Engineering and Edith Cowan University (ASX Release October 22nd 2024).
In addition, as part of these studies, Impact will focus on the potential integration of the Lake Hope ore and its
associated metallurgical processes with the assets and intellectual property related to the HiPurA process,
which were recently acquired through Impact’s 50% share in Alluminous Pty Ltd (ASX Release April 23rd 2025).
As the acquisition occurred near the end of the PFS, the study only pertains to Lake Hope as a stand-alone
project and does not consider integration with HiPurA. Impact believes the HiPurA acquisition will accelerate
the Company’s entry into the HPA market by several years, potentially enhancing the economics of the
combined projects.
3|Page
ASX ANNOUNCEMENT
Lake Hope PFS Summary
(Impact share 80%)
Impact confirms that all the material assumptions underpinning the production target, or the forecast financial
information derived from the production target, in the Pre-feasibility Study announced on June 17th 2025,
continue to apply and have not materially changed.
4|Page
ASX ANNOUNCEMENT
SUMMARY OF THE PRE-FEASIBILITY STUDY
Production Base
• Potential to become a major producer of HPA with stand-alone steady-state production of 10,000
tonnes per annum following a two-year ramp-up.
• Initial mine life of 33 years.
• Conservative commodity price estimate of US$22,000 per tonne of HPA compared to recent forecasts
of more than US$25,000 per tonne from 2026 onwards.
• Ideally positioned to meet forecast growth in demand for HPA over the next decade.
• For a stand-alone operation as per the PFS, Definitive Feasibility Study (DFS) completion and FID for a
stand-alone operation are anticipated in H1 2028.
• Integration studies with the HiPurA process and the potential for a modular scale-up in production to
commence immediately, to accelerate to commercial production by several years (ASX Release April
25th 2025).
Physical Parameters
• JORC Mineral Resource Estimate (MRE) of 2.8 million tonnes at 25.1% Al2O3 for 700,000 tonnes of
contained Al2O3 (alumina) (ASX Release November 19th, 2024).
• Maiden JORC Proved and Probable Ore Reserve of 1.7 million tonnes at 26% Al2O3 for 450,000 tonnes
of contained Al2O3, a resource to reserve conversion rate of 66%.
Capital Costs and Operating Costs (+/-25%)
• Pre-production capex A$259 million, including a contingency of $50 million.
• Lowest quartile Life Of Mine Opex cash costs of US$5,860 (A$9,450) per tonne, excluding by-product
credits (Figure 1).
• Key by-product of sulphate of potash (SOP) could reduce Opex to <US$4,500. SOP flowsheet and
market research have only been completed to the Scoping Study level and are not considered in the
financial model. Offers significant upside to current financial metrics in the DFS.
• Potentially at least 30% lower than operating costs (net of by-product) estimated by Alpha HPA Ltd
(ASX: A4N ASX Release March 26th 2025).
Figure 1. HPA Industry operating cost curve.
Existing OPEX Data sourced from market analyst reports and in-house research.
5|Page
ASX ANNOUNCEMENT
Key Operating Dynamics
• The low operating and capital costs compared to competitors stem from the unique characteristics of
the clay deposit at Lake Hope, which features high-grade mineralisation at the surface that requires no
on-site beneficiation (Figure 2) advantageous metallurgical process kinetics, and potential future SOP
by-product credit with further testwork.
• Ore to be mined at Lake Hope, and transported to Kwinana, Perth, for processing.
• Mining to take place on a campaign basis with ore stockpiled across a three month period. Mining
campaigns occur annually for the first three years before transitioning to every three years.
• An average of 54,000 dry metric tonnes of ore is delivered annually to the process plant with yearround transport.
• A potential site for a refinery has been identified in Kwinana with ready access to required reagents
and potential buyers for by-products.
Figure 2. Comparison of mining techniques between Lake Hope and conventional hard rock mining.
Metallurgy
• PFS flowsheet is based on the now-patented Playa One Low-Temperature Leach (LTL)
hydrometallurgical process (Figure 3 and ASX Release February 27th, 2024). The Scoping Study was
based on the patented Playa One sulphate process (ASX Releases November 9th 2023 and February
19th 2024).
• The LTL process comprises two main hydrometallurgical stages: Stage 1, a potassium hydroxide pretreatment of the raw ore, which produces a high-value Sulphate of Potash (SOP) crystalline byproduct; and Stage 2, a solid residue that is leached in a hydrochloric acid circuit to produce
aluminium chloro-hexahydrate (ACH). The ACH is then calcined to produce HPA. Stage 2 is a
recognised route to HPA and is used by several other private manufacturers of HPA.
• Alumina recovery is about 70%, with potential to significantly improve on this with further testwork.
• Regeneration of the hydrochloric acid using “off-the-shelf” acid recovery equipment, is a key financial
metric for the Opex.
• There have been no detailed testwork studies on the production of the SOP, and all considerations are
at a Scoping Study level. However, preliminary assays suggest the potential for a high-quality product.
6|Page
ASX ANNOUNCEMENT
• The SOP circuit has been included in the CapEx estimates but potential revenue and contribution to
the earnings have not been included in the financial modelling.
• Significant improvements to the alumina recovery, acid regeneration, SOP production and waste liquid
management are anticipated under the federally co-funded CRC-P research project into membranes in
association with CPC Engineering and Edith Cowan University (ASX Release October 22nd, 2024).
• CPC Engineering has designed an elegant refinery layout for a specific site in Kwinana that has ready
access to reagents and potential buyers of by-product (Figure 4).
Figure 3. Process Flowsheet for production of HPA.
Figure 4. 3D view and side elevation view of the proposed process plant in Kwinana.
7|Page
ASX ANNOUNCEMENT
ESG and Carbon footprint
• Baseline environmental and heritage surveys were completed over Lake Hope, with no impediments
to mining identified.
• Power for the Kwinana refinery will be 70% renewable by 2040, subject to the West Australian state
government fully implementing the Whole of System plan (WoSP). Impact Minerals will also
investigate options to increase renewable energy supply opportunities to bring this online sooner.
• Expected low-in-class CO2 emissions compared to incumbent producers (Scope 1 & 2), including Alpha
HPA Ltd (Figure 5 and ASX Release June 19th 2024)
Figure 5. Likely CO2 emissions for four different production methods for HPA:
The incumbent alkoxide process; Alpha HPA Limited (ASX Release November 21st, 2023); Impact’s proposed
Sulphate and Low-Temperature-Leach (LTL) processes; and AEM who produce modest quantities of HPA in
Canada using hydroelectric power
Key Approval Processes Going Forward
• Impact has elected to move to 80% ownership of Playa One Pty Ltd, owner of the Lake Hope project
and associated metallurgical patents and other intellectual property. Impact will issue 120 million
shares which are escrowed for 12 months.
• Mining Lease and Miscellaneous Licence applications lodged.
• Initial discussions with the Norseman-based Ngadju people, traditional custodians of the land which
includes Lake Hope, have been very encouraging. The financial model incorporates an estimate of the
community’s financial benefits.
• Further heritage and environmental surveys required around infrastructure and the miscellaneous
licence to be completed as part of the DFS.
• Further engagement with the Ngadju group planned for Q4 2025 and 2026.
Strong Post-Tax Financial Returns
• A conservative discount rate of 10% returns a post-tax NPV10 of A$1.165 billion, excluding any
by-product income from the SOP. For comparison, the Scoping Study used an 8% discount rate for an
NPV8 of A$1.334 billion. At a discount rate of 8%, the PFS NPV8 is A$1.525 billion, and at a discount
rate of 12%, the NPV12 is $961 million. Neither of these results includes the significant benefits from
the potential sale of SOP.
• IRR of 47.5%
8|Page
ASX ANNOUNCEMENT
•
•
•
•
Capital payback of 2.2 years from first HPA production.
Average annual post-tax free operating cash flow (real) of about A$170 million.
Life of mine post-tax cash flows of discounted $5.148 billion
Financial (real) modelling does not include any by-product credit.
Key Project Financial Metrics
Parameter
Units
Outcome
Average annual ore mining rate
dmt
54,300
Life of mine (LOM)
years
33
4N HPA Production (LOM)
t
323,640
Average annual production of 4N HPA
t
10,000
Revenue 4N HPA (excluding by-product
credits)
AUD $/ t
35,484
Revenue (LOM)
AUD $M
11,484
Post-tax NPV10 (real)
AUD $M
$1,165.7
%
47.5%
CapEx (including contingency and owner’s
costs)
AUD $M
$259
Govt Royalties (LOM)
AUD $M
287.1
Other Royalties (LOM)
AUD $M
344.5
Units
Outcome
Corporate Tax (LOM)
AUD $M
2,176
Payback
Years
2.2
Average cash cost of production of 4N HPA per
tonne over LOM – without by-product credit
AUD $/t
$9,453/US$5,860
EBITDA (LOM)
AUD $M
7,786
Net profit (LOM)
AUD $M
5,148
Unit
Assumption
Time series used
Time
Annual
Weighted Average Cost of Capital (Discount rate)
%
10.0
Tax rate
%
30
Post-tax IRR
Parameter
Key Assumptions
Parameter
9|Page
ASX ANNOUNCEMENT
Royalties
%
5.5
Critical Minerals Tax Offset (recently introduced
Australian federal tax incentive)
%
10% of OpEx for 10 years
US / AUD
$0.62
Exchange rate
Sensitivities
• The project economics are most sensitive to the HPA price, US:AUD foreign exchange rate and the
metallurgical recoveries (Figure 6).
• A +/-10% change in these three items together would result in an NPV10 range of between
A$672 million and A$1.658 billion. This demonstrates the robust economics of the project.
• Inclusion of by-product potash revenue stream increases the base case NPV10 by A$140 million to
$1.305 billion.
Figure 6. Project Sensitivities.
(Note that the identical FX and recovery sensitivities are coincidental.)
Resources and Reserves
A summary of the Lake Hope JORC Mineral Resources and Reserves is set out below.
Lake Hope Project Mineral Resources: ASX Release November 11th 2024.
The Mineral Resources for the Lake Hope alumina deposits are reported using the mineral wireframe, with a
partial per cent block volume adjustment and without a cut-off grade reflecting the mining method which will
mine the entire deposit.
10 | P a g e
ASX ANNOUNCEMENT
Mineral Resources
Category
Million Tonnes
Al2O3 %
Contained Al2O3 t
Measured
0.73
25.8
189,000
Indicated
1.88
25.0
471,000
Inferred
0.17
23.1
40,000
Total
2.79 Million Tonnes
25.1%
700,000 tonnes
Lake Hope Project Ore Reserves: ASX Release June 17th 2025
Reserves
Deposit
West Lake
East Lake
Total
Classification
Tonnes
Al2O3 %
Contained Al2O3 t
Proved
410,000
25.9
106,000
Probable
860,000
26.1
224,000
Sub-Total
1,270,000
26.1
330,000
Proved
200,000
25.9
53,000
Probable
260,000
25.5
66,000
Sub-Total
460,000
25.7
119,000
Proved
610,000
25.9
159,000
Probable
1,120,000
26.0
290,000
Total
1,730,000
26.0%
449,000
1) The Ore Reserves are a subset of the Mineral Resource
2) Tonnages are dry metric tonnes
3) Both tonnages and grades are reported inclusive of dilution; appropriate rounding has been applied, and rounding errors may
occur
4) Total Al2O3 metal content represents insitu quantities without metallurgical recoveries applied
5) Mine designs target grades above 25% Al2O3%, however, no cut-off grade has been applied to the ore reserve estimate
Marketing
• Favourable market fundamentals with HPA added to the Australian critical minerals list in March 2022
and other countries.
• Forecast compound annual growth rate of about 20% for the HPA and related products market over
the next decade driven by expansion in the battery and LED sectors (Figure 7).
• Customer engagement will commence on the commissioning of the proposed pilot plant. This may be
accelerated with the commissioning of the HiPurA pilot plant (ASX Release April 23rd 2025).
• Capabilities in end-product specification need to be developed over the next 24 months.
11 | P a g e
ASX ANNOUNCEMENT
Figure 7. HPA supply demand balance deficit from CRU Group Source: CRU via Alpha HPA
Key Risks
• Further test work must be undertaken to assess the variability in ore across the Lake Hope deposit.
Throughout the PFS, the understanding of the deposition and mineralogy across the lakes has
improved significantly.
• No vendor equipment test work was undertaken during the PFS stage. This presents a risk of vendors
quoting equipment that may not function properly and/or is sized incorrectly, potentially leading to
cost and schedule impacts in later phases.
Key areas of focus are:
•
Evaporators and Crystallisers;
•
Centrifuges and potentially high-speed separators;
•
Calciner; and
•
HCl distillation and recovery (membranes)
•
Suitability of scale muncher and conveyor systems for handling the specific
properties of the evaporite, including its flowability, abrasiveness, and potential for
clogging; and
•
Reagent recoveries and recycle process liquors via locked cycle testing during pilotscale testing.
• The impact of geopolitical uncertainty which is increasing globally. Fluctuation in raw material prices
has not been incorporated into the estimates, although the project is relatively insensitive to variances
in CapEx and Opex (Figure 6).
12 | P a g e
ASX ANNOUNCEMENT
Upside to the Preliminary Feasibility Study Outcomes
The Company has also identified significant opportunities for improvement to the PFS estimates and proposed
programmes of work which will be incorporated into the Definitive Feasibility Study (DFS) commencing
immediately, including:
• Value engineering opportunities to further optimise the mine plan, production profile and financial
returns early in the life of the operation, above the PFS estimates.
• Further test work to improve recoveries and process modifications.
• A 12-month stockpile programme to evaluate the seasonal effects of weather on stockpile integrity,
surface runoff, and ore slumping.
• Output from the pilot facility may produce findings that offer significant positive benefits to the larger
industrial-scale refinery design. These include plant operability, process optimisation and improved
ore recoveries, acid recovery and waste acid management, and construction materials, specifically for
the calciner.
• Conduct all necessary in-house and vendor supply process tests to ensure that the process flowsheet
is not overdesigned and that anticipated design parameters are met or exceeded to reduce the size,
cost, and delivery times of the vendor equipment.
• Investigate the energy balance within the flowsheet to help reduce energy costs.
• Explore opportunities to create higher purity 4N5+ and 5N products through the pilot plant, which will
enhance the economics of the Definitive Feasibility Study.
• Integration with the HiPurA process.
Next Steps
A review of the potential Integration of Lake Hope and the CRC-P grant with the HiPurA® process will be
undertaken.
2.
ACQUISITION OF A 50% SHAREHOLDING IN ALLUMINOUS PTY LTD
During the Quarter Impact announced that it had become the 50% and largest shareholder in
Alluminous Pty Ltd, a newly formed company that has successfully acquired 100% of HiPurA Pty Ltd,
which owns the HiPurA® High Purity Alumina (HPA) processing technology (ASX Release April 23rd 2025).
This technology was previously developed and wholly owned by ChemX Materials Limited, which, along
with HiPurA Pty Ltd, entered voluntary administration on January 2nd, 2025 (ASX Release April 4th, 2025).
The significant strategic and tactical benefits of the acquisition include:
•
Acceleration of Impact’s route to the HPA market by up to two years, providing a very
significant time and cost advantage over the current projected timeline.
•
Immediate access to a proven, scalable HPA process (HiPurA®), which has already
delivered >99.99% (4N) purity.
•
A Pilot plant that is almost fully constructed and close to commissioning with only modest
additional capital expenditure to begin production and customer sample generation.
•
Ownership of a fully equipped HPA laboratory and micro-plant, eliminating the need for thirdparty test labs and enabling faster customer qualification and process optimisation.
•
Strategic dual-feedstock flexibility: retains the Lake Hope resource while unlocking a new
pathway using chemical feedstocks, allowing both commercial options to be pursued.
•
Supports strategic alignment with the CRC-P research grant, allowing integration of membrane
technologies and strengthening government funding prospects.
13 | P a g e
ASX ANNOUNCEMENT
•
Involvement of the original HiPurA® inventors, which together with Impact’s own HPA
capabilities, ensures technical continuity, deep expertise, and innovation-led process
improvements.
•
Partnership with experienced North American investors opens doors to deeper capital pools
and global customer networks in high-growth HPA markets including batteries, semiconductors,
and LEDs.
•
The Joint venture structure reduces future capital requirements for Impact, with a $2.2 million
total acquisition cost to be born equally by Impact ($1.1 million) and the other shareholders of
Alluminous ($1.1 million). This lowers Impact’s financial exposure while also de-risking
execution through shared technical and financial responsibility.
The remaining 50% of Alluminous is owned by the two founders and inventors of the technology, along with
two North American venture capital investors that specialise in the resource sector. This strategic structure is
an excellent outcome for Impact shareholders as the JV will enhance Impact’s in-house HPA expertise through
the ongoing involvement of the technology creators, whilst also opening access to North American capital
markets.
Next steps for Alluminous will be to demonstrate the technology at pilot plant scale and then expand to
commercial-scale production in North America, with the potential to list Alluminous on a North American
securities exchange within the next 12 to 24 months.
HiPurA®: A Transformational Acquisition
The HiPurA® process is Australian-patented, with additional international patents granted or pending. It has:
•
Successfully produced >99.99% (4N) HPA at micro-plant scale (ASX release CMX: November 13th,
2023).
•
A 25 tpa pilot plant that can be commissioned within a few months with very modest further capital
expenditure (Figure 8).
•
Demonstrated suitability for modularisation, scaling and proximity siting—allowing future plants to be
located closer to end users.
•
A low-energy intensity, low-carbon design, aligned with global ESG trends and customer expectations.
•
Independence from mining feedstocks if required, allowing for the use of commercially available
aluminous chemicals to meet market demand faster in overseas markets.
14 | P a g e
ASX ANNOUNCEMENT
Figure 8. The HiPurA pilot plant: note the filtration units still in wrappers.
The Complete Package: Technology, Equipment, Expertise, and Access to Capital Markets
This acquisition delivers far more than a process flow sheet. HiPurA Pty Ltd brings with it many advantages,
including solutions to challenges that Impact has learned on its HPA journey with Lake Hope. These
advantages include:
•
Full access to a fully equipped, on-site analytical HPA laboratory eliminates the reliance on third-party
testing facilities and speeds up pilot plant commissioning and customer qualification
(Figure 9). One of Impact’s key learnings has been the necessity of having an in-house laboratory,
especially for pilot work, to improve assay turnaround time and enable process adjustments on the fly.
Establishing an in-house laboratory was to be one of the core components of the recently awarded
CRC-P research grant (ASX Release October 22nd, 2024).
•
A proven micro-plant used to develop HiPurA®—now available to Impact to back-engineer and test
Lake Hope material (Figure 10).
•
The pilot plant, which has the potential to be scaled and modularised (Figure 11). Modularisation
removes the requirement for the large upfront capital expenditure required to expand production to
the benchmark 10,000 tonnes per annum.
15 | P a g e
ASX ANNOUNCEMENT
•
Sample product production will allow immediate offtake engagement with customers. The HiPurA
pilot plant accelerates this engagement by at least 12 to 18 months.
•
An experienced operations and R&D team, including the two original inventors, who will continue to
guide the technology’s evolution.
•
The membrane technology being developed by the Mineral Recovery Research Centre (MRRC)
department at Edith Cowan University in Perth can also be integrated into the HiPurA process (ASX
Release October 22nd, 2024), providing strategic alignment with Impact’s CRC-P grant and pilot plant
development timeline. This de-risks government co-funding and accelerates grant milestones.
Figure 9 (L). ICP analytical machine capable of reading up to 66 elements to ppb levels of detection.
Figure 10 (R). Micro-plant used to demonstrate the HiPurA process and to be used for Lake Hope material.
•
The inclusion of two North American investment groups as partners in Alluminous is a big step towards
broadening Impact’s exposure to global capital pools, particularly in the United States and Canada. These
partners bring financial depth, strong networks, and insight into major downstream HPA consumers and
end-user industries, from semiconductors and electronics to EV battery makers. They will be invaluable
partners in the game-changing commercialisation of the technology (Figure 11).
16 | P a g e
ASX ANNOUNCEMENT
Figure 11. A game-changing commercialisation pathway.
A Strategic Bolt-On to the Lake Hope Project
The acquisition is a natural and highly strategic addition to Impact’s Lake Hope HPA Project. Over the past two
years, Lake Hope has developed into a flagship project with a unique, high-grade salt lake clay feedstock,
demonstrating advantages in resource quality, ease of mining, and efficient processing (ASX Release
November 19th 2024).
While Lake Hope is the core asset, Impact’s growing understanding of the HPA sector has shown that success
primarily depends on product quality, customisation, and customer qualifications. Many high-purity alumina
applications—whether for semiconductors, battery separators, or LED substrates—require specific
characteristics and occasionally lengthy approval lead times.
The HiPurA® technology provides Impact with a critical downstream advantage: a proven, modular, and
scalable processing route that does not depend on any single feedstock. It offers Impact immediate flexibility
and optionality, enabling the assessment of the most commercially viable path to market through Lake Hope,
chemical feedstocks, or a combination of both.
To that end, Impact will now conduct test work to evaluate the compatibility of Lake Hope feedstock with the
HiPurA® process, utilising the same micro-plant used to develop and validate the process (Figure 11), followed
by work in the full pilot plant (Figure 8).
Strategic and Tactical Benefits to Impact Minerals
In summary, the acquisition of HiPurA Pty Ltd provides Impact with many strategic and tactical benefits.
It has:
•
•
•
17 | P a g e
Immediate downstream capability and an accelerated path to market
Share your feedback