Australian Nickel Conference
Released
Released
Announcement PDF
Impact Minerals Limited
The Arkun Project, WA
DISCLAIMER
This presentation contains forward looking statements that are subject to risk factors associated with resource
businesses. While all due care has been taken in preparing the report, projections may be affected by a variety of
variables and changes in underlying assumptions which could cause actual results or trends to differ materially,
including but not limited to: price fluctuations, actual demand, currency fluctuations, drilling and production results,
reserve estimates, loss of market, industry competition, environmental risks, physical risks, legislative, fiscal and
regulatory developments, economic and financial market conditions in various countries and regions, political risks,
project delay or advancement, approvals and cost estimates. Ideas, opinions, conclusions, and recommendations
expressed in this report by the vendors are made by personnel using their professional judgment. The vendors do not
represent or warrant that these will prove complete or accurate, and any person or corporation acting in response to
this report must make their own enquiries and exercise their own professional judgement. The vendors are not liable
for any loss or damage (however caused) incurred or suffered by a person or corporation acting on the basis of this
report. All data and third-party figures presented are publicly available and referenced where applicable.
The information contained in this Presentation is for information purposes only. It is intended only for those persons
to whom it is delivered personally by or on behalf of the vendors. The information in this Presentation is a general
background and does not purport to be complete or to provide all information that an investor should consider when
making an investment decision or that would be required in a prospectus or product disclosure statement prepared
in accordance with the requirements of the Corporations Act 2001 (Cth). It has been prepared by the vendors with
due care but no representation or warranty, express or implied, is provided in relation to the fairness, accuracy or
completeness of the information. Statements in this Presentation are made only as of the date of this Presentation
unless otherwise stated and the information in this Presentation remains subject to change without notice.
About Impact Minerals (ASX:IPT)
Board of Directors and Management
Non-Executive Chairman: Peter Unsworth
Managing Director:
Dr Mike Jones
Non-Executive Director: Dr Frank Bierlein
Non-Executive Director: Paul Ingram
Exploration Manager:
James Cumming
Lake Hope Manager:
Roland Gotthard
Shareholders
Capital Structure
Listed on ASX
November 2006
Bunnenberg Family
15.7%
Shares on Issue
2,864 million
ABC Beteiligungen
7.7%
Options
298M unlisted 158M IPTOB
Directors
1.1%
Share Price
1.3c
Top 20
41%
Market Cap
$37 million
Top 50
49%
Cash
A$2.98 million
No of Shareholders
4,500
3 year
1 Year
Share
price
Building a battery metals fortress in WA
• 10 projects 4,600 square km
• Akun Project 2500 sq km.
• Arkun-Beau-Dinninup-Martup-Mineral
Hill 100%
• Five JV’s 80%-20% free carried to DtM
Emerging Ni-Cu-PGM-mineral province
Julimar
Arkun Project
neighbours and
Operating Mines
Arkun Project
Regional Geochemistry
• Regional soil
geochemistry
• Nickel anomaly from
9km spaced data from
CSIRO
• Copper and Gold
anomalies from
regional work (1980s)
• 10-20 times
background
Arkun Project Mapping
Soil Sampling Programmes
ASX Release 8th August 2023: Ni-Cu-PGM Soil geochemistry Anomalies Identified at Arkun
North Arkun
Right Rocks!
Potential
hosts rock to
Ni-Cu-PGM
deposits
ASX Release 8th August 2023: Ni-Cu-PGM Soil geochemistry Anomalies Identified at Arkun
Beau
Beau
ASX Release 18th August 2022: Outstanding Soil Geochemistry results at Beau Project
Julimar
Airborne Electromagnetic (EM) Survey
ASX Release 18th August 2023: Outstanding Airborne EM Anomalies at Arkun Project
AEM 2.5D Processing
AEM-1 Line 50110
Centered on gravity
high and coincident
Ni-Cu-PGM soil
anomaly
AEM-2 Line 50040
Centered on gravity
high and coincident
Ni-Cu-PGM soil
anomaly
AEM-3 Line 20230
Centered on strong
magnetic
lineament. Not soil
tested
ASX Release 18th August 2023: Outstanding Airborne EM Anomalies at Arkun Project
SkyTEM Survey Line and 2.5 Processing
ASX Release 18th August 2023: Outstanding Airborne EM Anomalies at Arkun Project
Follow up work: Strong Newsflow
• Soil samples awaiting
• Follow up mapping and field
checking
• Ongoing land access
• MobileMT Survey
completed.
• Drill testing Q1 2024
Lake Hope: a unique deposit
West Lake
East Lake
1 km
ASX Release 19th June 2023: Maiden Mineral Resource at Lake Hope
Will we be the lowest cost producer?
COME WITH
US ON THE
JOURNEY
• Planning to drill at Arkun in Q1 2024
• We aim to be one of the lowest-cost
producers of HPA globally.
• We have a unique deposit in a Tier 1
Jurisdiction.
• We have a cost-disruptive metallurgical
process now in PFS.
• We will build out our capabilities in
metallurgy and final product specification.
• We will deliver into a high-margin, growth
market with significant upside potential.
Competent Persons Statements
The review of exploration activities and results in this presentation (other than for the Lake Hope Project) is based on information compiled by Dr Mike Jones, a Member of the
Australian Institute of Geoscientists. He is a director of the company and works for Impact Minerals Limited. He has sufficient experience relevant to the style of mineralisation
and types of deposits under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code). Mike Jones has consented to the inclusion in the report of the matters based on his
information in the form and context in which it appears.
This review of exploration activities and results, and the metallurgical test work contained in this presentation for the Lake Hope Project is based on information compiled by
Roland Gotthard, a Member of the Australian Institute of Mining and Metallurgists. He is an employee of Impact Minerals Limited. He has sufficient experience which is relevant
to the style of mineralisation and types of deposits under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 edition
of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code). Mr Gotthard has consented to the inclusion in the report of
the matters based on his information in the form and context in which it appears.
The data in this presentation that relates to Mineral Resource estimates for the Lake Hope Project is based on information evaluated by Mr Simon Tear who is a Member of The
Australasian Institute of Mining and Metallurgy (MAusIMM) and who has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and
to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves (the “JORC Code”). Mr Tear is a Director of H&S Consultants Pty Ltd and he consents to the inclusion in the presentation of the Mineral Resource in
the form and context in which they appear.
The information in this presentation that relates to the Minerals Resource for the Lake Hope Project is based on information announced to the ASX on 19th June 2023. The
Company confirms that it is not aware of any new information or data that materially affects the information included in the relevant market announcement, and that all
material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply.
Share your feedback
Discover