Further Evidence of Large Mineralised System at Silica Hill
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
Date: 28 March 2018
Number: 579/280318
FURTHER EVIDENCE OF LARGE MINERALISED SYSTEM AT
SILICA HILL
New drill assays and detailed studies on core from the Silica Hill Prospect at Impact Minerals Limited’s
(ASX:IPT) 100% owned Commonwealth Project 100 km north of Orange in New South Wales, further
demonstrate the large scale and high grade nature of the mineralised system in the area.
Managing Director Dr Mike Jones said “Following the recent discovery of high grade gold and very
high grade silver veins at Silica Hill, these new results are a further breakthrough for Impact as it
demonstrates the system extends over an area of at least 500 metres by 500 metres in dimension and also
to considerable depth. We are also recognising different units within the Silica Hill rhyolite that are an
important control on the mineralisation and may also be the upper parts of a deep rooted intrusion that
could be mineralised over a significant vertical extent. This augers well for our 2018 drill programme.
Figure 1. Silica Hill Prospect: Geology, drill hole locations and recent significant results. The
mineralisation is open and large areas remain to be drill tested.
26 Richardson Street West Perth Western Australia 6005
Tel +61 (8) 6454 6666 Facsimile +61 (8) 6314 6670
Email info@impactminerals.com.au www.impactminerals.com.au
CMIPT072
Hole CMIPT72 is the eastern most hole drilled thus far at Impact’s emerging high grade gold-silver
discovery at Silica Hill (Figure 1). The hole intersected two zones of strong silica-sulphide alteration
with anomalous gold and silver values over a combined thickness of more than 200 metres down hole
including a high grade gold and silver vein within the upper zone indicating significant potential for
more veins nearby, in particular to the south (Figure 1).
The upper zone in Hole 72 returned:
46 metres at 0.04 g/t gold and 5 g/t silver from 200 metres down hole including
0.4 metres at 2.5 g/t gold and 327 g/t silver from 257.2 metres (the narrow vein).
The lower zone returned 67 metres at 0.3 g/t gold and 1 g/t silver from 402 metres down hole.
Change in orientation of mineralised trend
In addition detailed studies on drill core show that the two east-west trending mineralised structures at
Silica Hill become more north west-south east orientated to the east and that the Silica Hill rhyolite is
more extensive at depth to the south than previously recognised (Figure 1).
Accordingly Hole 72 has been drilled at the northern edge of these particular structures and the
structures are open to the south east and at depth.
The southern mineralised structure has good grade and geological continuity over a strike extent of at
least 150 metres and recently returned high grade gold and very high grade silver results within the
north west trendng part of the zone. For example Hole CMIPT077 (Figure 1) returned an intercept of:
22.5 m at 1.7 g/t gold and 276 g/t silver from 166.7 metres down hole;
including 0.3 m at 1.8 g/t gold and 4200 g/t (135 ounces or 0.42%) silver from 174.4 metres;
also including 0.8 m at 13.6 g/t gold and 40 g/t silver from 187.7 metres.
This structure has not been drilled at depth nor along trend to the east (see announcement 13 February
2018 February and Figure 1).
The northern mineralised zone whilst of lower grade also demonstrates very good continuity and
recently returned a very thick intercept of:
117 metres at 0.3 g/t gold and 11 g/t silver from 74 metres down hole.
This is the thickest zone of mineralisation found in the northern zone to date and also suggests that,
similar to the southern zone, that lower grade mineralisation is increasing in thickness and grade at
depth and to the east. This is very encouraging and further drilling is also warranted here.
Recognition of new porphyry unit
The change in orientation of the mineralised trend is also associated with a chemically distinct porphyry
unit newly recognised in detailed geochemical data routinely collected by Impact (Type 1 Porphyry,
Figure 1). This porphyry unit separates the two mineralised structures at Silica Hill and is an important
control on the geometry of the ore shoots (Figure 1).
Of note, the Type 1 porphyry is similar in composition to the porphyry unit at the Commonwealth
deposit 150 metres to the west and comprising a gold-silver rich base metal massive sulphide lens and
veins and disseminations of gold and silver mineralisation.
This suggests a common link between the two mineralised areas and importantly indicates that this new
porphyry unit could be the top of a pipe or sheet like feature that extends to some depth. This is a key
feature of the model previously proposed by Impact for the area which suggests the entire system may
be underlain and be driven by a porphyry copper-gold similar to Cadia-Ridgeway and North Parkes (see
announcement 31 July 2017 and Figure 2).
Figure 2. Simplified conceptual model for the mineralised system around Commonwealth: a high
sulphidation volcanogenic massive sulphide deposit related to a porphyry copper-gold system at depth.
Next Steps
The robust and significant results delivered from Silica Hill from the 2017 drill programme continue to
demonstrate the potential for bulk mining and to significantly increase the resources at the
Commonwealth Project, which currently stand at 720,000 tonnes at 2.8 g/t gold, 48 g/t silver, 1.5% zinc
and 0.6% lead (see announcement 19 February 2015).
Large areas of this system still remain untested by drilling and it is evident that there is signficant
exploration upside in the area (Figure 1). The nature of the mineralisation at Silica Hill with the
extensive visible silver minerals proustite and pyrargyrite is unique in Australia and a detailed review
and synthesis is in progress of all the drill hole data including assays, hand held XRF data and
geological and structural data with the aim of identifying further controls on the mineralisation.
This work has been used to identify the next round of drill targets with the next drill programme to
commence as soon as practicable. Statutory approvals for new drill pads have been lodged and
negotiations are in progress to extend the Land Access Agreement with the main land holder at
Commonwealth-Silica Hill. Further timing will be annnounced as soon as possible.
A resource update will be completed following the completion of the next drill programme in Q3-Q4
this year.
In addition further results from the nearby Welcome Jack Trend have recently been received and are
being interpreted.
Also, in the past two months significant field work has been completed on cobalt-copper-gold and
silver-lead-zinc prospects at the Broken Hill Project and also on the company’s Clermont gold project in
Queensland. Rock chip assays from this work are due within the next two to three weeks.
Dr Michael G Jones
Managing Director
The review of exploration activities and results contained in this report is based on information compiled by Dr Mike Jones, a Member of
the Australian Institute of Geoscientists. He is a director of the company and works for Impact Minerals Limited. He has sufficient
experience which is relevant to the style of mineralisation and types of deposits under consideration and to the activity which he is
undertaking to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves (the JORC Code). Dr Jones has consented to the inclusion in the report of the matters based on his
information in the form and context in which it appears.
Impact Minerals confirms that it is not aware of any new information or data that materially affects the information included in the
previous market announcements referred to and in the case of mineral resource estimates, that all material assumptions and technical
parameters underpinning the estimates continue to apply and have not materially changed.
DRILL HOLE DATA FOR 2017 DRILL PROGRAMME
Hole_ID
CMIPT050
CMIPT051
CMIPT052
CMIPT053
CMIPT054
CMIPT055
CMIPT056
CMIPT057
CMIPT058
CMIPT059
CMIPT060
CMIPT061
CMIPT062
CMIPT063
CMIPT064
CMIPT065
CMIPT066
CMIPT067
CMIPT068
CMIPT069
CMIPT070
CMIPT071
CMIPT072
CMIPT073
CMIPT074
CMIPT075
CMIPT076
CMIPT077
CMIPT078
Hole_Type
DDH
DDH
RC
RC
RC
RC
RC
RC Abnd
RC
RC Abnd
RC Abnd
DDH
RC Abnd
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
RC Abnd
RC Abnd
DDH
RC
Max_Depth
356.6
271.9
149
141
81
96
174
60
198
60
93
170
59
199
252
159
177
152
250
171
162
171
474.65
158
169.5
57
57
197.6
191
East
692342
692436
693659
693537
693536
692250
692381
692412
692412
692388
692389
692343
692390
692388
692388
692390
692392
692339
692139
692393
692340
692417
692778
692357
692357
692418
692418
692357
692418
North
6393009
6393318
6393306
6393317
6393320
6392810
6393020
6393020
6393019
6393020
6393020
6393009
6393021
6393021
6393022
6393021
6393021
6393011
6393064
6393022
6393012
6392990
6392939
6393030
6393030
6392990
6392990
6393030
6392990
RL
391
551
475
498
498
341
404
405
405
402
402
391
403
402
402
403
403
391
384
403
391
390
387
400
400
390
390
400
390
Dip
-57
-47
-47
-75
-70
-65
-55
-70
-80
-70
-75
-52
-75
-70
-70
-55
-70
-60
-65
-45
-45
-60
-55
-60
-62
-76
-75
-65
-76
Azimuth
230.3
200.3
275
270
110
310
270
250
245
320
322
284
346
300
330
220
355
25
245
320
280
318
300
227
198
350
20
185
339
Prospect
Main Shaft
Silica Hill
Welcome Jack
Welcome Jack
Welcome Jack
Main Shaft
Silica Hill
Silica Hill
Silica Hill
Silica Hill
Silica Hill
Silica Hill
Silica Hill
Silica Hill
Silica Hill
Silica Hill
Silica Hill
Silica Hill
Main Shaft North
Silica Hill
Silica Hill
Silica Hill
Silica Hill
Silica Hill
Silica Hill
Silica Hill
Silica Hill
Silica Hill
Silica Hill
SIGNIFICANT ASSAYS (see also Quarterly Report December 2017)
Hole Id
CMIPT072
including
CMIPT073
From
To
Interval
Au
Ag
Zn
Pb
Cu
ppm
ppm
ppm
ppm
ppm
Cutoff
199.8
347
146.2
0.04
5
NSA
NSA
NSA
2 g/t Ag cut off
256.8
257.2
0.4
2.5
327
NSA
NSA
NSA
1 g/t Au
75
150.3
75.3
0.35
62
NSA
NSA
NSA
0.1 g/t Au, 10 g/t Ag
including
134
145
10.8
1.45
243
2625
1360
NSA
1 g/t Au Cutoff
including
134
138.5
4.3
2.00
566
4731
2041
NSA
1 g/t Au Cutoff
including
136
136.47
0.32
6.88
1485
8100
4100
NSA
5 g/t Au Cutoff
138
159.7
21.8
0.58
273
1742
988
NSA
0.1 g/t Au, 10 g/t Ag
including
143
143.05
0.5
0.55
1485
3020
1985
NSA
1 g/t Au Cutoff
including
149
149.2
0.7
1.40
4119
6082
5262
NSA
1000 g/t Ag Cutoff
including
148.5
148.88
0.38
1.64
6240
7770
7110
NSA
2000 g/t Ag Cutoff
including
156
159.7
3.4
1.6
25
5083
3025
NSA
1 g/t Au Cutoff
CMIPT074
CMIPT075
*Drilling Error Hole
CMIPT076
*Drilling Error Hole
CMIPT077
167
189.2
22.5
1.73
276
2208
1446
NSA
0.1 g/t Au, 10 g/t Ag
including
167
168.2
0.8
0.72
1070
2740
1290
NSA
1000 g/t Au Cutoff
also including
174
175.25
0.82
1.24
2810
4813
4034
NSA
1000 g/t Au Cutoff
also including
174.43
174.72
0.29
1.83
4200
6920
4830
356
2000 g/t Au Cutoff
also including
184
188.5
4.15
5.56
153
7746
5506
NSA
5 g/t Au Cutoff
including
184
184.55
0.2
11.55
601
17600
6850
375
10 g/t Au Cutoff
also including
188
188.5
0.8
13.60
39.7
7570
7430
481
10 g/t Au Cutoff
CMIPT078
74
191
117
0.29
11
NSA
NSA
NSA
0.1 g/t Au, 10 g/t Ag
APPENDIX 1 - SECTION 1 SAMPLING TECHNIQUES AND DATA
Criteria
JORC Code explanation
Commentary
Nature and quality of sampling (e.g. cut channels, random chips,
or specific specialised industry standard measurement tools
appropriate to the minerals under investigation, such as down
hole gamma sondes, or handheld XRF instruments, etc). These
examples should not be taken as limiting the broad meaning of
sampling.
Rock chip samples
Random grab samples were taken at surface which represented favourable geology and alteration to known mineralisation in
the region. Samples are variably weathered.
Soil Samples
About 250g of soil was taken from 15-20cm below surface and sieved to - 2mm size. Samples put in plastic snap seal bags.
Samples were subsequently sieved to -250 micron at SGS Laboratories for assay by aqua regia digest.
RC Drilling
Reverse Circulation (RC) percussion drilling was used to produce a 1m bulk sample (~25kg) which was collected in plastic bags
and representative 1m split samples (12.5%, or nominally 3kg) were collected using a riffle splitter and placed in a calico bag.
The cyclone was cleaned out with compressed air at the end of each hole and periodically during the drilling. Holes were drilled
to optimally intercept interpreted mineralised zones.
Diamond Drilling
Diamond drilling was used to produce drill core either with a diameter of 63.5 mm (HQ) or 47.6 mm (NQ).
Hand-held XRF
Handheld XRF analysis was completed with an Olympus INNOV-X 40Kev RAP Geochem Analyser instrument at 50 cm and 1 m
intervals on diamond core and for every metre for RC samples. For individual veins or samples that are specifically reported,
several readings are taken to establish an average. Investors should note that the analyses are semi-quantitative and are a
guide only to the metal content. Laboratory assays are used in preference where available.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used
Rock chip samples
Representative samples at each sample site weigh between 0.8 and 1.2 kg. Sample sites were chosen due to historic rock and
soil assay results and the geophysical surveys conducted on the Commonwealth Project. Historic rock sample methods are
unknown but are considered immaterial.
Soil Samples and Drill Samples
Sample representivity was ensured by a combination of Company Procedures regarding quality control (QC) and quality
assurance / testing (QA).
Examples of QC include (but are not limited to), daily workplace and equipment inspections, as well as drilling and sampling
procedures.
Examples of QA include (but are not limited to) collection of “field duplicates”, the use of certified standards and blank samples
approximately every 50 samples
Sampling techniques
Criteria
Drilling techniques
Drill sample recovery
JORC Code explanation
Commentary
Aspects of the determination of mineralisation that are Material
to the Public Report. In cases where ‘industry standard’ work has
been done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m samples from which 3
kg was pulverised to produce a 30 g charge for fire assay’). In
other cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed information
Rock chip samples
Rock samples were sent to SGS Perth where they were crushed, dried and pulverised (total prep) to produce a 25-30 g subsamples for analysis initially by Aqua Regia digest with ICP-MS finish for base metals then by four acid digest with an ICP/AES
finish for ore grade base metal samples and lead collection fire assay with AAS finish for gold.
Soil Samples
Soil samples were sent to ACME Laboratories in Vancouver for analysis by aqua regia digest or to SGS Laboratories in Perth for
analysis by the MMI digest.
RC and diamond drill samples
RC samples and cut samples of core were submitted to ALS in Orange, NSW. Laboratory sample preparation involved: sample
crushed to 70% less than 2mm, riffle/rotary split off 1 kg, pulverise split to >85% passing 75 microns.
RC samples analysed by MEICP41 or MEOG46 for ore grade samples, aqua region digest with ICP OES analysis and AA24 fire
assay with AAS finish.
Historical diamond and RC samples were sent to Fox Anamet, Brookvale NSW where gold was determined by fire assay, base
metals by DCP and AAS methods.
Weathered samples contained gossanous sulphide material and fresh samples containing visible pyrite, galena, sphalerite and
chalcopyrite.
Drill type (e.g. core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc) and details (e.g. core
diameter, triple or standard tube, depth of diamond tails, facesampling bit or other type, whether core is oriented and if so, by
what method, etc).
Diamond drilling accounts for about 50 % of the drilling and comprises NQ (47.6 mm diameter) and HQ (63.5 mm diameter)
sized core. Impact diamond core is triple tube and is oriented. Historical diamond core was not oriented.
RC drilling accounts for about 50% of the drilling and comprises 4 inch hammer.
Method of recording and assessing core and chip sample
recoveries and results assessed
Diamond core recoveries for all holes are logged and recorded. Recoveries are estimated to be approximately >97% for the
Commonwealth Project. No significant core loss or sample recovery problems are observed in the drill core or historic reports.
RC samples were visually checked for recovery, moisture and contamination.
Measures taken to maximise sample recovery and ensure
representative nature of the samples
Diamond core is reconstructed into continuous runs on an angle iron cradle for orientation marking. Depths are checked against
the depth given on the core blocks and rod counts are routinely carried out by the driller.
The RC samples are collected by plastic bag directly from the rig-mounted cyclone and laid directly on the ground in rows of 10.
The drill cyclone and sample buckets are cleaned between rod-changes and after each hole to minimise down-hole and/or cross
contamination.
Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
No sample bias has been established.
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
Geological logging of samples followed company and industry common practice. Qualitative logging of samples included (but
not limited to); lithology, mineralogy, alteration, veining and weathering. Diamond core logging included additional fields such
as structure and geotechnical parameters.
Magnetic Susceptibility measurements were taken for each 1m RC sample and each 1m diamond core interval.
For diamond core, information on structure type, dip, dip direction, texture, shape and fill material has been recorded in the
logs. RQD data has been recorded on selected diamond holes.
Logging
Criteria
Sub-sampling
techniques and
sample preparation
Quality of assay data
and laboratory tests
JORC Code explanation
Commentary
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
All logging is quantitative, based on visual field estimates. Systematic photography of the diamond core in the wet and dry f orm
was completed.
Chip trays with representative 1m RC samples were collected and photographed then stored for future reference.
The total length and percentage of the relevant intersections
logged
All diamond drill holes were logged in full.
All RC chips samples were geologically logged by Impact’s on-site geologist on a 1m basis, with digital capture in the field.
Detailed diamond core logging, with digital capture was conducted for 100% of the core by Impact’s on-site geologist.
If core, whether cut or sawn and whether quarter, half or all core
taken.
All core samples were sampled by half core. Selected intervals of quarter core will be selected for check assays if required.
If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
RC samples were split using a riffle splitter.
For all sample types, the nature, quality and appropriateness of
the sample preparation technique.
Company procedures were followed to ensure sub-sampling adequacy and consistency. These included (but were not limited
to), daily work place inspections of sampling equipment and practices, as well as sub-sample duplicates (“field duplicates”).
Quality control procedures adopted for all sub-sampling stages
to maximise representivity of samples.
Laboratory QC procedures for rock sample assays involve the use of internal certified reference material as assay standards,
along with blanks, duplicates and replicates.
The QC procedure for historical diamond and RC samples is unknown but considered immaterial.
Measures taken to ensure that the sampling is representative of
the in situ material collected, including for instance results for
field duplicate/second-half sampling.
Sample duplicates from the historical drilling were taken from selected intervals and compared to the original assay. Quarter
core was taken for diamond samples and riffle re-splits for RC samples.
Whether sample sizes are appropriate to the grain size of the
material being sampled.
The samples sizes at Commonwealth are considered appropriate since gold has been identified as predominantly fine-grained
by thin section analysis which would indicate the nugget effect is minimal.
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
An industry standard fire assay technique for samples using lead collection with an Atomic Absorption Spectrometry (AAS)
finish was used for gold and aqua regia digest for base metals and silver.
The quality of historical drill sample assays is unknown, however this is considered immaterial at this stage of exploration.
For geophysical tools, spectrometers, handheld XRF instruments,
etc, the parameters used in determining the analysis including
instrument make and model, reading times, calibrations factors
applied and their derivation, etc.
No geophysical tools were used to determine material element concentrations. A handheld Olympus Innov-X XRF 40KeV
instrument was used for semi-quantitative analysis only. The sampling interval was two times 20 second intervals. Calibration is
carried out at the start of the sampling procedure each time the machine is turned on and appropriate standards are used every
25th sample. Elements analysed include:Ag, As, Se, Ca, K, S, Sb, Sn, Cd, Sr, Rb, Pb, Hg, W, Cu, Ni, Co, V, Ti, Fe, Mn, P, Cr, Mo, U
and Ta.
Nature of quality control procedures adopted (e.g. standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of bias) and precision have
been established.
For the rock chips, quality control procedures for assays were followed via internal laboratory protocols. Accuracy and precision
are within acceptable limits.
The quality control of historical drill sample assays is unknown, however this is considered immaterial at this stage of
exploration.
Criteria
Verification of
sampling and
assaying
Location of data
points
Data spacing and
distribution
Orientation of data in
relation to geological
structure
Sample security
JORC Code explanation
Commentary
The verification of significant intersections by either independent
or alternative company personnel.
Significant intersections from drilling have not been verified by independent or alternative companies. This is not required at
this stage of exploration.
The use of twinned holes.
Two twin diamond holes versus historic RC holes have been drilled at Commonwealth South and Main Shaft.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Primary assay data for rock chips has been entered into standard Excel templates for plotting in Mapinfo and Target. All
historical drill data has been entered digitally by previous explorers and verified internally by Impact.
Discuss any adjustment to assay data.
No significant adjustments have been required.
Accuracy and quality of surveys used to locate drill holes (collar
and down-hole surveys), trenches, mine workings and other
locations used in Mineral Resource estimation.
Recent drill holes have been located by DGPS. Historical drill holes and mine shafts have been verified by DGPS.
Specification of the grid system used.
The grid system for Commonwealth is MGA_GDA94, Zone 55.
Quality and adequacy of topographic control.
Standard government topographic maps have been used for topographic validation. The DGPS is considered sufficiently
accurate for elevation data.
For the diamond holes, down-hole single shot surveys were conducted by the drilling contractor. Surveys were conducted at
6m, 18, 30m and then approximately every 30m down-hole.
For the RC drill holes, down hole dip surveys were taken at approximately 30m intervals and at the bottom of the hole.
Data spacing for reporting of Exploration Results.
Drill spacing of drill holes ranges between 10 and 30 m which is considered adequate for Exploration Results.
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied.
Drill spacing of drill holes ranges between 10 and 50 m and may be considered adequate for Mineral Resource and Ore reserve
estimation procedures. However estimations of grade and tonnes have not yet been made.
Whether sample compositing has been applied.
Sample compositing has been applied for quoting drill composite results only.
Whether the orientation of sampling achieves unbiased sampling
of possible structures and the extent to which this is known,
considering the deposit type.
Drilling is oriented sub-perpendicular to the mineralised trend and stratigraphic contacts as determined by field data and cross
section interpretation.
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to have
introduced a sampling bias, this should be assessed and reported
if material.
No significant sample bias has been identified from drilling due to the optimum drill orientation described above. Where
present, sample bias will be reported.
The measures taken to ensure sample security.
For rock samples, chain of custody is managed by Impact Minerals Ltd. Samples for Commonwealth are delivered by Impact
Minerals Ltd personnel to ALS in Orange, NSW or to SGS Perth for prep and assay. Whilst in storage, they are kept in a locked
yard. Tracking sheets have been set up to track the progress of batches of samples.
Security of historic drill samples is unknown however is considered immaterial.
Criteria
Audits or reviews
JORC Code explanation
The results of any audits or reviews of sampling techniques and
data.
Commentary
A review of the sampling techniques and data both of historic drill holes and of Impact’s procedures has been completed by
Optiro Consultants of Perth, WA.
SECTION 2 REPORTING OF EXPLORATION RESULTS
Criteria
Mineral tenement and land
tenure status
Exploration done by other
parties
JORC Code explanation
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint ventures,
partnerships, overriding royalties, native title interests, historical sites,
wilderness or national park and environmental settings.
The Commonwealth Project currently comprises 3 exploration licences covering 315 km2. The
tenements are held 100% by Endeavour Minerals Pty Ltd, a subsidiary company of Impact Minerals
Limited. No aboriginal sites or places have been declared or recorded in areas where Impact is currently
exploring. There are no national parks over the license area.
The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
The tenements are in good standing with no known impediments.
Acknowledgment and appraisal of exploration by other parties.
A total of 66 drill holes have been completed over 300 m strike between the Commonwealth main shaft
and Commonwealth South by previous explorers to an average depth of 53 m.
Deposit type, geological setting and style of mineralisation.
The Commonwealth and Commonwealth South deposits are considered gold-rich volcanic hosted
massive sulphide (VMS) deposits that occur at and below the contact with a porphyritic rhyolite and
overlying volcanic sedimentary rocks. The mineralisation may have been overprinted by epithermal
mineralisation.
A summary of all information material to the understanding of the
exploration results including a tabulation of the following information for
all Material drill holes:
easting and northing of the drill hole collar
elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
dip and azimuth of the hole
down hole length and interception depth
hole length.
See Table in text.
In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (e.g. cutting of high grades)
and cut-off grades are usually Material and should be stated.
All reported assays have been length weighted. No top cuts have been applied. A nominal cut-off of
approximately 0.5 g/t Au has been applied.
Where aggregate intercepts incorporate short lengths of high grade
results and longer lengths of low grade results, the procedure used for
such aggregation should be stated and some typical examples of such
aggregations should be shown in detail.
High grade massive sulphide intervals internal to broader zones of disseminated sulphide mineralisation
are reported as included intervals.
Geology
Drill hole Information
Data aggregation methods
Commentary
Criteria
JORC Code explanation
Commentary
The assumptions used for any reporting of metal equivalent values should
be clearly stated.
Gold equivalent values have been used in the long section. Metal prices used for the gold equiva
Share your feedback
Discover