28 APRIL 2023
CORPORATE ANNOUNCEMENT
MARCH 2023 QUARTERLY REPORT
HIGHLIGHTS
1. Lake Hope, WA (IPT 80%)
•
•
•
•
•
•
•
Impact to acquire an 80% interest in the Lake Hope Project, an
advanced High Purity Alumina (HPA) project located near Hyden, in the
Tier One jurisdiction of Western Australia.
Lake Hope, a dry playa lake, contains a unique fine-grained (<16
microns), very pure, high-grade aluminous clays in the top few metres
of the lake bed.
An Exploration Target for contained alumina (Al2O3) in the top 0.5 m to
1.5 m or so has been calculated from initial drill results of between
2.6 million to 4.7 million tonnes at a grade of between 24.3% Al2O3 and
26.7% Al2O3 for a contained 0.63 Mt to 1.25 Mt of Al2O3.
Exploration Target Disclaimer - Investors should be aware that the
potential size and grade of the alumina deposit at Lake Hope are
conceptual in nature. Insufficient work has been undertaken to
estimate a JORC 2012-compliant Mineral Resource Estimate, and it is
uncertain if further exploration will result in the estimation of a Mineral
Resource. For further details on the calculation of the Exploration
Target please refer to the ASX Announcement dated March 21st 2023.
The unique geological properties of Lake Hope will allow for a shallow,
very low-cost, free-digging operation only a few metres deep and with
offsite metallurgical processing at an established industrial site.
The proposed operation would have a small environmental footprint
and low carbon emissions.
Impact aims to bring Lake Hope into production to deliver high-margin
end-products into a rapidly expanding global market with a forecast
average price for 4N HPA (99.99% Al2O3) and related products of about
US$20,000 per tonne.
COMPANY DETAILS
Market Cap: A$28m (0.012
p/s)
Issued Capital: 2,481,370,556
ABN 52 119 062 261
26 Richardson Street
West Perth
Western Australia 6005
Phone: +61 (8) 6454 6666
Facsimile: +61 (8) 6454 6670
Email:
info@impactminerals.com.au
Website:
impactminerals.com.au
DIRECTORS
Mr Peter Unsworth
Chairman
Dr Michael Jones
Managing Director
Mr Paul Ingram
Non-Executive Director
Dr Frank Bierlein
Non-Executive Director
Mr Bernard Crawford
Company Secretary
2. Broken Hill, WA (IPT 100%)
•
•
Field work, ground geophysical surveys and geophysical interpretation are
underway as part of the inaugural BHP Xplor Programme to accelerate
exploration at Broken Hill
IGO Joint Venture (EL7390 and EL8234). Drill assays awaited.
3. Arkun-Beau, WA (IPT 100%)
•
•
•
•
Interpretation in progress of results of extensive soil geochemistry surveys.
Further soil geochemistry surveys underway.
Airborne EM data re-processed by Intrepid Geophysics. Interpretation in progress.
Ground DGPR survey completed at Beau. Interpretation in progress.
4. Narryer JV, WA
•
Soil geochemistry and rock chip results received and being interpreted.
5. Corporate
•
Cash at March 31st 2023 was $1.14 Million
2|P ag e
ASX ANNOUNCEMENT
OVERVIEW
During the Quarter, Impact announced a major change in focus, transitioning immediately from early-stage
explorer to advanced developer of the Lake Hope High Purity Alumina Project (ASX Release March 21st, 2023 .
The Lake Hope Project, in which Impact is earning an 80% interest, offers the company the opportunity to be a
low-cost entrant into the HPA chemical market, a high margin business forecast to grow strongly over the next
decade. A Pre-Feasibility Study (PFS) on the project is now underway (ASX Release April 6th, 2023. How could
you not realise that this needed to be filled in??
In addition, significant fieldwork was completed at Broken Hill under the auspices of the BHP Xplor programme,
a prestigious and innovative global business model to help fund junior explorers, and which Impact is proud to
be one of the inaugural cohorts (ASX Release January 17th, 2023).
In the background, work continued on Impact’s extensive portfolio of projects in the emerging mineral province
of southwest Western Australia, a Tier One jurisdiction and where Impact has a strategic focus. The province is
home to the world-class deposits such as the recent Julimar PGE-Ni-Cu discovery (ASX: CHN) and the
Greenbushes lithium-tantalum mine. Impact’s projects in the province are both 100% owned, (Arkun-Beau,
Dinninup, Mineral Hill and Martup) and in joint venture (Jumbo, Narryer, Dalgaranga and Doonia) (Figure 1).
Figure 1. Location of Impact’s projects in Western Australia.
3|P ag e
ASX ANNOUNCEMENT
PROJECT REPORTS
1. LAKE HOPE, WA (IPT earning 80%)
During the Quarter, Impact announced that it had signed a binding term sheet with Playa One Pty Ltd, an
unrelated private company, to earn an 80% interest in the advanced Lake Hope High Purity Alumina (HPA)
Project in Western Australia.
The Project offers Impact the opportunity to be a low-cost entrant into the HPA chemical market, a high-margin
business forecast to grow strongly over the next decade.
The Project contains globally unique high-grade aluminium clay minerals in the top few metres of a playa lake,
which has unique physical and chemical properties that allow for low-cost mining and offsite metallurgical
processing via a novel and cost-disruptive acid leaching process. Preliminary economic studies indicate that the
production of HPA and related products from Lake Hope will be cost-competitive with current producers and
other developers in Australia and globally.
The project is a transformational acquisition for Impact and the entire company is looking forward with great
enthusiasm to the challenge of developing the project and ensuring that Impact Minerals is the next "playa” in
HPA.
Key Terms of the Binding Term Sheet
Impact may earn an interest in Playa One Pty Ltd in stages according to the following terms:
1. Impact to make a $25,000 cash payment for a six-week option to complete due diligence.
2. If satisfied with due diligence, Impact will exercise the option and earn the right to sole fund a PreFeasibility Study (PFS) by paying $175,000 cash, issuing 50 million fully paid ordinary shares (escrowed
for 12 months), and issuing 30 million unlisted options exercisable at 1.125c, vesting 12 months from
the date of issue and expiring on 1 December 2025, to the shareholders of Playa One. Upon completion
of a PFS, Impact can enter an incorporated joint venture with the Playa One shareholders (through an
entity representing them, Playa Two Pty Ltd). If so, it will acquire an immediate 80% interest in Playa
One by issuing up to 120 million fully paid ordinary shares capped at a maximum value of $8 million
(based on the 5-day VWAP before the election) to the Playa One Shareholders.
3. Upon completion of a Definitive Feasibility Study to be sole-funded by Impact, Impact will issue up to
100 million fully paid ordinary shares capped at a maximum value of $10 million (based on the 5-day
VWAP before the ASX announcement of the completion of the DFS) to the Playa One Shareholders.
4. Playa One shareholders will be free-carried to a Decision to Mine. Impact will maintain all Playa One
tenements in good standing during this time.
5. If a Decision to Mine is made, the Playa One Shareholders may contribute to mine development costs or
be diluted. If their interest falls below 7.5%, it will convert to a 2% net smelter royalty.
4|P ag e
ASX ANNOUNCEMENT
Project Details
The Lake Hope Project covers numerous prospective salt lakes between Hyden and Norseman in southern
Western Australia, a Tier One jurisdiction (Figures 1 and 2). It comprises one granted exploration licence
(E63/2086), covering the Lake Hope Project already discovered, together with five further exploration licence
applications (ELA63/2317, 2318 and 2319, and ELA74/673 and 764) which are poorly explored. The tenements
cover about 238 km2 and are all 100% owned by Playa One.
Figure 2. Location of Playa One tenements with options for trucking and off-site processing.
Geology
The salt lakes of Western Australia are well known for their unique and complex hydrogeochemistry, which has
led to the formation of a wide variety of economic minerals and brines within the playa systems. These include
the world-class Yeelirrie uranium deposit (>100 Mlb U3O8), significant resources of potash brines, gypsum and
lime-sand.
The Lake Hope area was identified by Playa One as having unique climatic and geological characteristics that
have resulted in the formation of what is probably a globally unique aluminium-rich material within the surficial
clay layers of two small salt lakes, or “pans”, in the Lake Hope playa system. These pans are called West Lake
and East Lake (Figure 3).
The lake clays, which are only up to a few metres thick, have unique chemical and physical properties and
consist almost entirely of aluminium-bearing minerals that are plasticine-like in consistency and can be easily
sampled with hand-held augers and push tubes (Figure 4).
In addition, particle size distribution analysis demonstrates that virtually all the minerals are less than 16
microns, and from 60% to 80% of them occur at grain sizes of less than 5 microns (Figure 5).
5|P ag e
ASX ANNOUNCEMENT
These unique characteristics have produced a near-perfect minera: a very high-value end-product whose parent
ore is:
•
•
•
very soft and shallow, allowing for extremely cheap free-digging with limited infrastructure
requirements, no pre-stripping, no selective mining, a tiny environmental footprint, and limited
rehabilitation requirements.
naturally fine-grained with no need for crushing and grinding, allowing for transport to an off-site
processing facility that can be built on existing industrial sites (Figure 2). In essence, this is Direct
Shipping Ore (DSO).
comprised of a few minerals that require only simple washing before acid leaching, thus allowing for
low-cost straightforward metallurgical processing.
Figure 3. Geology of the Lake Hope Project showing drill hole locations and average aluminium
grade on East Lake and West Lake.
6|P ag e
ASX ANNOUNCEMENT
Figure 4. Lake Hope showing the push tube sampling method (!)
and an example of the lake clay from the push tube.
Figure 5. Particle size distribution analysis for four samples.
7|P ag e
ASX ANNOUNCEMENT
Drilling and Assay Results
A total of 99 holes have been drilled by hand-held auger and push tube methods across the two lakes, with all
samples submitted for assay at Intertek Laboratories in Perth (ASX Release March 21st 2023 for further details).
The drilling has defined a uniform and coherent layer of aluminium-bearing clay in both lakes that is up to
1.65 m thick in places but still open at depth in most areas.
The assays mainly returned very high grades of aluminium oxide (alumina - Al2O3) of between 24.5% and 27.8%
Al2O3 and, significantly, with low amounts of potential contaminants such as CaO (0.05% to 0.08%), Fe 2O3 (2.43.2%), Na2O (2-4%) and P2O5 (0.05-0.07%).
High-grade assays with greater than 27% Al2O3 are presented in Table 1, with a complete set of assays and drill
hole collar information are in the ASX announcement of march 21st , 2023. The distribution of aluminium in the
lakes is shown in Figure 6.
A maiden Mineral Resource Estimate is currently being prepared in accordance with the JORC 2012 Code, with
further infill drilling recently completed.
HOLE_ID
LHP002
LHP004
LHP006
LHP007
LHP014
LHP015
LHP016
LHP019
LHP031
LHP038
LHP039
LHP040
LHP042
LHP045
LHP046
LHP049
LHP065
LHP068
LHP070
LHP083
LHP099
MGA_E
243134
243115
243380
243378
241247
241249
241253
241407
240900
241100
241100
241100
241300
241400
241400
241550
242700
242900
242900
242666
241400
MGA_N
6409163
6409462
6409461
6409314
6410105
6410294
6410504
6410302
6410450
6410450
6410550
6410650
6410400
6410600
6410700
6410650
6409300
6409100
6409300
6409208
6410300
METHOD
PUSH
PUSH
PUSH
PUSH
PUSH
PUSH
PUSH
PUSH
PUSH
PUSH
PUSH
PUSH
PUSH
PUSH
PUSH
PUSH
AUGER
PUSH
AUGER
PUSH
AUGER
Interval
0.6
0.6
0.6
0.6
0.5
0.5
0.5
0.5
0.62
0.6
0.88
0.85
0.82
0.82
0.88
0.88
0.85
0.78
1
0.4
1.3
Al2O3
27.09
27.53
27.47
27.23
27.47
27.71
27.48
27.29
27.11
27.42
27.63
27.16
27.48
27.66
27.07
26.98
27.34
27.02
27.2
27.04
27.1
K2O
6.78
7.1
7.09
5.54
5.99
5.99
5.87
7.44
5.95
5.91
6.09
5.91
6.03
5.9
5.85
5.78
7.03
7.16
7.05
6.96
6.08
Na2O
3.5
3.46
3.55
3.47
3.35
3.48
3.49
3.35
3.39
3.24
3.44
3.46
3.49
3.56
3.99
3.73
3.23
3.37
3.45
3.26
3.56
CaO
0.23
0.08
0.1
0.13
0.06
0.06
0.05
0.06
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.06
0.1
0.16
0.09
0.16
0.06
Fe2O3
2.93
2.86
2.84
2.99
2.94
2.88
2.98
2.71
3.07
3.25
3.14
3.2
3.19
3.29
3.08
3.14
3.11
3.13
3.2
3.02
3.05
MgO
0.86
0.81
0.83
0.78
0.8
0.84
0.81
0.74
0.8
0.79
0.79
0.78
0.81
0.83
0.82
0.83
0.76
0.8
0.79
0.78
0.75
MnO
BDL
BDL
BDL
BDL
BDL
BDL
BDL
BDL
BDL
BDL
BDL
BDL
BDL
BDL
BDL
BDL
BDL
BDL
BDL
BDL
BDL
SiO2
18.45
17.13
17.09
17.98
22.98
22.38
23.39
15.84
23.14
23.16
21.54
23.1
21.98
22.37
22.27
23.34
17.76
17.11
17.98
18.69
22.79
Cr2O3
0.01
0.008
0.008
0.009
0.011
0.01
0.012
0.008
0.011
0.011
0.011
0.013
0.011
0.012
0.011
0.012
0.009
0.009
0.009
0.009
0.011
P2O5
0.08
0.08
0.07
0.07
0.061
0.059
0.059
0.068
0.05
0.058
0.061
0.061
0.063
0.062
0.058
0.06
0.076
0.072
0.079
0.074
0.061
LOI
30.06
29.25
25.27
31.15
26.88
29.27
28.37
33.4
30.08
30.75
30.41
30.85
30.62
29.55
30.69
30.19
32.4
32.7
32.31
31.24
30.28
Table 1. Drill hole results with assays greater than 27% Al2O3
8|P ag e
ASX ANNOUNCEMENT
Figure 6. Drill results showing the average Al2O3 grade for West Lake (top) and East Lake (bottom) at
the same scale.
9|P ag e
ASX ANNOUNCEMENT
Estimates Of Tonnes and Grade
An Exploration Target for alumina has been calculated for the mineralisation discovered thus far, highlighting
Lake Hope's significant exploration potential.
West Lake
1.65 million to 3.3 million tonnes at a grade of between 24.5% Al 2O3 and 27% Al2O3,
containing between 403kt Al2O3 and 895kt Al2O3.
East Lake
0.93 million to 1.39 million tonnes at a grade of between 24% Al 2O3 and 26% Al2O3,
containing between 223Kt Al2O3 and 362Kt Al2O3.
Total
2.59 million to 4.74 million tonnes at a grade of between 24.3% Al 2O3 and 26.7% Al2O3 containing between
0.63Mt and 1.25Mt of Al2O3.
Table 2 shows key statistics and the Exploration Target
Lake
Surface
Area m2
Thicknes
s
West
1,300,000
m2
685,000 m2
0.4 to 1
m
0.4 to 2
m
East
Combin
ed
Tonnage Range
Min
Max
1,650,000
t
930,000 t
3,310,000 t
2,590,000
t
4,740,000 t
1,390,000 t
Al2O3 Grade
Min
Max
24.5
27.0
%
%
24.0
26.0
%
%
24.3
26.7
%
%
Contained Alumina
Min
Max
403,00
0t
289,00
0t
629,00
0t
895,000 t
360,000 t
1,250,000
t
Table 2. Lake Hope Exploration Target, 2023. Columns may not sum correctly due to rounding.
EXPLORATION TARGET DISCLAIMER
Investors should be aware that the potential size and grade of the alumina deposit at Lake Hope are conceptual
in nature. Insufficient work has been undertaken to estimate a JORC 2012-compliant Mineral Resource Estimate,
and it is uncertain if further exploration will result in the estimation of a Mineral Resource.
For further details on the calculation of the Exploration Target please refer to the ASX Announcement dated
March 21st 2023.
10 | P a g e
ASX ANNOUNCEMENT
Further work is currently underway to convert the Exploration Target into a Mineral Resource Estimate. This
work includes additional drilling to establish the true thickness of the aluminous mud, an increase in the drill
density from 200 m by 100 m to at least 100 m x 100 m, further measurements of the bulk density and accurate
topographic control via DGPS survey.
Metallurgy
Playa One has developed a novel, relatively low-cost hydro-metallurgical process to convert mineralisation of a
type as found on Lake Hope into HPA with the potential to produce a purity exceeding 99.99% (4N HPA),
generally taken as the industry standard purity for product comparison.
Initial bench-scale metallurgical test work on representative material, process design, flow sheet design, and
process engineering studies have been completed, leading to significant breakthroughs in mineral processing
technology, including proprietary technologies.
Figure 7 illustrates the basic process steps in a simplified schematic flow sheet.
Impact’s review of this novel process indicates that together with the unique physical and chemical
characteristics of the Lake Hope clays, using the Play One metallurgical process may offer a breakthrough in HPA
production with potentially significant cost advantages compared to the processing of kaolin, which is
commonly proposed as a source of ore for HPA and is the subject of several on-going studies by other
companies.
Figure 7. Schematic flow sheet.
These advantages include the following:
•
•
•
•
•
the naturally occurring micron-sized particles and relatively homogeneous ore require no comminution,
grinding, classification, or wet-dry screening.
a simple wash and filtration circuit for upfront processing.
a low-temperature sulphuric acid leach, a generally readily available and cheaper acid than others.
Eliminating the front-end energy-intensive calcination required in the kaolin process, thus significantly
reducing energy costs, the flow sheet complexity and CO2 emissions.
Relatively benign waste products.
11 | P a g e
ASX ANNOUNCEMENT
Optimisation of the processing flow sheet will be a key focus of the Pre-Feasibility Study (PFS) to be commenced
immediately by Impact.
The expected relatively low cost of mining also allows for significant optionality for the location of the
metallurgical plant, which is likely to be located in one of four main population centres (Figure 2).
Production of 4N HPA
Playa One’s sulphate metallurgical process has successfully produced >99.99% Al2O3 (nominally 4N HPA) with
purities of 99.994% to 99.996% in initial assays. These assays have been done on the product from the bench
scale test work, with further details in the JORC Table at the end of the report. As well as the Al2O3 assay (with
all other major elements being below detection), total contaminants are about 41 ppm, representing 99.996%
alumina (Al2O3) with the primary contaminants being Fe (2.08ppm), K (7.94ppm), Mg (7.23ppm) and Na
(6.61ppm). This compares favourably with the purity of other HPA products published in the public domain
(Table 3).
Playa One
KRR
FYI
Element
Sulphuric
HPA7
5N
As
0.69
NR
NR
Ag
NR
NR
0.1
B
NR
NR
NR
Ba
0.2
0.516
0.5
Ce
BDL
NR
0.34
Ca
2.57
<0.06
NR
Cr
0.7
2.76
5
Co
0.15
0.046
0.1
Cs
0.02
<0.01
0.03
Fe
2.08
6.2
BDL
Gd
BDL
NR
0.01
Ga
2.01
0.809
NR
K
7.94
17.4
NR
La
BDL
NR
0.2
NR
Mg
7.23
0.603
Mn
2.74
0.138
1
Mo
0.33
0.052
NR
Na
6.61
8.59
0
Nb
0.01
3.01
NR
Nd
NR
NR
0.15
Ni
0.11
0.377
BDL
P
3.45
1.74
NR
Pb
0.76
<0.01
NR
Pr
BDL
NR
0.04
Rb
0.26
<0.01
0.1
Sc
BDL
NR
0.1
Si
3.05
15.8
4.67
Sm
BDL
NR
0.02
Sn
BDL
NR
0.8
Sr
0.2
0.053
0.2
Ti
0.08
0.695
NR
U
BDL
NR
0.01
V
0.01
<0.02
0.3
W
BDL
NR
0.1
Zn
0.15
0.488
NR
Zr
BDL
NR
NR
TOTAL
41.35
59.28
13.67
Table 3. Minor element results for Lake Hope HPA compared with results from
King River Resources Ltd (ASX:KRR 25th March 2021, 30th April 2021) and
FYI Resources Ltd (ASX:FYI 13th March 2019).
Assay methods vary between individual data sources, and direct comparisons should be cautiously viewed.
Some elements were omitted for brevity and are reported as “Others_ppm”.
Total ppm is the sum of all elements reporting above the detection limit.
BDL = below the detection limit. NR = Not Reported.
12 | P a g e
ASX ANNOUNCEMENT
Samples of an example precursor product and final calcined HPA produced using the metallurgical process were
analysed using SEM and EDS microscopy by RSC Mineral Consultants, Perth, Western Australia. Precursor salts
(before calcination) were imaged as agglomerations of micron-sized particles of alumina. The final calcined HPA
product was imaged as corundum crystals and fused aggregates up to 200 microns in size (Figure 8). X-Ray
diffraction studies have confirmed that the final product is alpha-HPA, the desired form of alumina.
It should be noted that the precipitation of the crystals occurred with little or no control over temperature and
pressure. In addition, work has yet to be done on refining the final HPA product, for example, jet milling or
developing intermediate saleable products that the end-users require. This critical capability needs to be built
out by Impact, and this will be another area of focus in the PFS using material produced from the bench-scale
test work.
Figure 8. Backscattered scanning electron micrographs of final calcined alumina showing corundum crystals and
nanoparticles (Sample HY11558).
Preliminary Economic Considerations
Playa One has completed a high-level review of the mining and chemical processing costs associated with a
preferred development concept of the lake clay-sulphate process.
Impact has reviewed this concept in detail and has concluded that it represents a possible compelling path
forward to production with the potential to be cost-competitive with existing and proposed HPA operations
within Australia and internationally.
Impact is completing the work required to produce a Scoping Study to confirm Playa One’s review. This will
include the maiden Mineral Resource Estimate.
A logistics option study identified Kwinana, Albany, Esperance and Kalgoorlie as possible locations for a
processing plant. They are all roughly equidistant from Lake Hope and easily accessible via road, rail, and ports
for reagent supply and product export (Figure 1).
The unique geological properties of Lake Hope mean that trucking and mining costs are likely to comprise a
small percentage of the overall operating cost estimate, with the clay to be trucked via conventional road trains
to the processing facility.
13 | P a g e
ASX ANNOUNCEMENT
About High Purity Alumina and the market for its products
High Purity Alumina is aluminium oxide (“alumina” - Al2O3) with a generally accepted purity that exceeds
99.99%, or “4N” (four nines).
HPA has superior physical and chemical properties, such as high brightness, superior hardness, and superior
corrosion resistance. It has traditionally found applications in:
•
•
•
•
•
•
•
LED bulbs are a growth market for HPA as they substantially replace incandescent lighting systems
because they are sustainable, durable, and safe.
Protective coatings (in powdered form) as an inert, incombustible and non-conductive ceramic filler in
electronics applications.
Anode-cathode coatings and separators in lithium-ion batteries.
Phosphor substrate material in plasma displays.
Semiconductor substrates.
A precursor for sapphire glass, optical lenses and specialty ceramics used in high-technology imaging
and bio-medical devices.
Defence and protective uses as a hard, chemically resistant and inert barrier.
In addition to the HPA, the final calcined ceramic form of the mineral, various precursor aluminium salts,
including sulphates, nitrates, chlorides, and silicates (clays), also have important end-market uses. These uses,
which include critical parts of the lithium-ion battery manufacturing process, are summarised in Table 4.
Table 4. End uses of HPA and precursor chemicals
Growing awareness of ultra-high purity (UHP) intermediate aluminium salts and hydroxides as a revenue
opportunity has been shown in ASX releases by Alpha HPA Ltd.
14 | P a g e
ASX ANNOUNCEMENT
Market Forecast for HPA: demand and price
The consensus amongst analysts and the industry is for 4N HPA and related products to command prices
between US$15,000 and US$32,000 per tonne, with a median conservative price assumption of US$20,000 per
tonne. These figures are borne out by ongoing sales of small quantities of HPA and precursor products reported
by Alpha HPA Limited (ASX: A4N Release 24th February 2023).
Although data are scarce, in-house analysis of industry performance indicates a notional cost curve with the
bulk of incumbent producers at US$11,000 to US$15,000 per tonne for 4N HPA. New entrants, such as Alpha
HPA Limited, who produce HPA from a chemical feedstock, and the kaolin developers are forecasting
production at a disruptive cost of US$6,000 to $7,000 per tonne (Figure 9: ASX: A4N Release 7th February 2023
and 17th March 2020).
A preliminary review of the economic factors affecting the development of Lake Hope indicates the Project may
be cost-competitive with these new hydrometallurgical processes.
Figure 9. An indicative cost curve for global HPA production. Note the disruptive nature of the cost of
production for new entrants using hydrometallurgical techniques versus the incumbent processes dominated by
the Bayer process.
Overall annual demand for HPA is predicted to increase from 45,000 to 50,000 tonnes in 2021-22 to about
250,000 tonnes by 2030 (Figure 10).
An increase in LED demand will mainly drive this growth together with lithium-ion battery uses, both
underpinned by global decarbonisation and electrification initiatives.
LED growth has experienced between 13% and 18% Compound Annual Growth Rate (CAGR) over the past ten
years, and this is predicted to continue, driven by increased installation capacity of LED’s and increased demand
for environmentally friendly lighting in domestic and commercial properties.
The fastest-growing end-use demand sector in recent years has been in lithium battery separators, which grew
at a CAGR of 26%, reaching 5,000 tonnes in 2018 (latest data available). Continued significant growth is
predicted in this market, given the uptake of lithium battery technology.
15 | P a g e
ASX ANNOUNCEMENT
Figure 10. Forecast growth in HPA demand to 2030 (Commodity Research Unit report 2020).
Demand for sapphire glass, although accounting for a relatively small share of the overall market, is also
growing at 8% to 10% CAGR. Sapphire glass has precise input tolerances, and a small number of market
participants dominates production.
In addition, as noted above, other uses for Ultra High Purity precursors are also likely to be realised in the
coming years.
In Asia-Pacific, government funding has fuelled the manufacturing capacity investments for electronic
companies, which in turn is expected to fuel the demand for HPA over the next decade.
Summary and Next Steps
The unique nature of Lake Hope, which allows for very low cost, low environmental footprint quarrying,
combined with straightforward metallurgical processing, presents a clear path to producing high purity alumina
products that command high margins in a global market forecast to expand over the next decade dramatically.
As such, the Lake Hope Project presents a compelling opportunity for Impact Minerals and its shareholders. The
company will move towards production as quickly as practicable over the next few years.
16 | P a g e
ASX ANNOUNCEMENT
A detailed work programme, budget and timeframe are currently being prepared. However, Impact is now
working towards the following goals over the next three to six months:
•
•
•
•
•
•
Calculation of a maiden Mineral Resource Estimate.
Completion of a Scoping Study.
Baseline environmental studies.
Baseline heritage surveys and continued discussions with the Ngadju First Nations Group, in particular,
the application for the Mining Lease. Investors should note that an agreement with the Ngadju Group
will be required to gain access for mining.
Lodgement of an application for a Mining Lease.
Commencement of a Pre-Feasibility Study.
The Lake Hope Project will become the main focus of Impact’s activities going forward. The PFS and DFS are
estimated to cost about $2.5 million over the next two years. This relatively low cost for feasibility studies
compared to other more conventional projects will allow exploration to continue at Impact’s other projects, in
particular the Arkun project in the emerging mineral province of southwest Western Australia. In addition, work
will also continue at Broken Hill under the BHP Xplor programme (ASX Release January 17th 2023). Statutory
commitments are also expected to be maintained on the company’s other projects.
2. BROKEN HILL, NSW (IPT 100%): IGO earning 75%)
During the Quarter Impact announced that it had been selected as one of the inaugural participants in the BHP
Xplor programme, principally to fund exploration at the Company’s Broken Hill Project.
BHP Xplor, an accelerator program introduced by BHP in August 2022, is designed to help provide participants
with the opportunity to accelerate their growth and the potential to establish a long-term partnership with BHP
and its global network of partners.
Impact will receive up to US$500,000 in cash payments from BHP between January and June 2023 and gain
access to a network of internal and external experts to help guide development in the company's technical,
business and operational aspects.
The BHP Xplor funding will be used to identify new target areas for copper and other energy metals around the
Broken Hill area, where Impact has been quietly adding to its ground position for several years.
Impact believes that there is significant untapped exploration potential at Broken Hill for copper mineralisation
and has been working with world-renowned geologist Prof. Tony Crawford on a new model for copper associated
with mafic intrusions that are part of the Broken Hill Group rocks.
This is a different exploration model to that being pursued by Impact’s joint venture partner IGO Limited on
EL7390 and EL8234, which are excluded from the program and comprise a tiny portion of Impact’s tenements in
the area (ASX release 9th November 2021).
Under the Xplor program agreement between BHP and Impact, BHP does not acquire an equity interest in Impact
or any project. However, Impact commits to certain exclusivity and pre-emption regimes concerning investments
in Impact or its projects and data sharing provisions about the six-month program (ASX Release which clarified
the original release).
The Xplor funding has been dire