DECEMBER 2014 QUARTERLY REPORT
SUMMARY
1. BROKEN HILL JOINT VENTURE PROJECT, N.S.W. (IPT 80%)
Maiden Drill programme completed for 1,012 metres;;
RHD001 returned:
32 metres at 1% copper, 0.5% nickel, 3.9 g/t Pt+Pd+Au and
10.6 g/t silver from 46 m down hole; with best intercepts of:
4.2 m at 2.6% copper, 0.5% nickel 10.6 g/t Pt-Pd-Au from
71.6 metres and
5.1 m at 1.9% copper, 0.9% nickel, 6.2 g/t Pt-Pd-Au and
18 g/t silver from 57. 3 metres.
RHD006 has intersected a 27 m thick zone above RHD001
containing multiple zones of high grade nickel and copper
including, for the first time, massive sulphide in a 0.5 m wide unit.
Assay results of RHD006 and other holes are pending;
80% interest earned from Golden Cross Resources Limited.
2. OTHER PROJECTS
Issued Capital
565,770,890
Directors
Peter Unsworth
Chairman
Dr Michael Jones
Managing Director
Paul Ingram
Non-Executive Director
Dr Markus Elsasser
Commonwealth Project, N.S.W. (IPT 100%);
Non-Executive Director
James Cooper-Jones
Ground Induced Polarisation and ground gravity geophysical
surveys completed;
Company Secretary
Mulga Tank Nickel-Copper PGE Project (IPT 100% & earning 5075%);
$150,000 drilling co-funding grant awarded by the WA
Government for drilling at the Mulga Tank dunite.
3. CORPORATE
Annual General Meeting to held on Thursday 27th November 2014.
All resolutions passed;
$1.14 M Research and Development Rebate received;
Cash balance at end of December 2014 Quarter: $2.1 million.
www.impactminerals.com.au
a 26 Richardson Street
West Perth
Western Australia 6003
t +61 (8) 6454 6666
f +61 (8) 6454 6667
e info@impactminerals.com.au
1.
BROKEN HILL PROJECT (IMPACT 80%)
The Broken Hill Project is located 20 km east of the World Class Broken Hill silver-lead-zinc mine in the
richly mineralised Curnamona Province of New South Wales and consists of one Exploration Licence
(EL7390) covering 110 square kilometres.
During the Quarter Impact completed 1,012 m of drilling in its maiden drill programme at the Red Hill
Prospect and, as announced on 23 December 2014, related expenditure has meant that Impact has now
earned 80% of the rights to Ni-Cu-PGE mineralisation associated with mafic and ultramafic rocks in the
project area from Golden Cross Resources Limited.
Up to $125,000 of direct drilling costs associated with this programme will also be rebateable to Impact
under the N.S.W. State Government’s Co-operative Drilling Funding Programme (see announcement 18
September 2014).
Drilling at Red Hill has discovered several near surface zones of high-grade
copper and platinum group elements (PGE) together with nickel, silver and
gold within a 32 metre thick zone of mineralisation. Assays from the first
drill hole have defined three main zones of mineralisation within the
broader zone (see announcement dated 17 December 2014, Figure 1, Table
1 and Table 2):
1.
19.9 m at 1.4% copper, 0.3% nickel, 6.7 g/t Pt-Pd-Au and 19 g/t
silver from 67 metres
including 4.2 m at 2.6% copper, 0.5% nickel 10.6 g/t Pt-Pd-Au from
71.6 metres.
2.
9.5 m at 1.5% copper, 0.8% nickel, 4.7 g/t Pt-Pd-Au and 14 g/t silver
from 53.7 metres
including 1.9 m at 2.0% copper, 1.2% nickel, 4.7 g/t Pt-Pd-Au and
16 g/t silver from 53.7 m
and also including 5.1 m at 1.9% copper, 0.9% nickel, 6.2 g/t
Pt-Pd-Au and 18 g/t silver from 57. 3 metres.
3.
3.7 m at 0.4% copper, 0.7% nickel, 2.1 g/t Pt-Pd-Au and 3 g/t silver
from 46 m.
These three zones can be combined into one broader intercept of bulk
mineable width within hole RDH001 of:
32 metres at 1% copper, 0.5% nickel, 3.9 g/t Pt+Pd+Au and 10.6 g/t silver
from 46 m down hole.
Figure 1. Massive
sulphide with nickel and
copper from 58 m
The mineralisation comprises zones of veins and breccias which contain a
mixture of nickel and copper sulphide, oxide and carbonate minerals
together with pyrite and pyrrhotite. In a few places the veins comprise
massive sulphide up to 20 cm thick and these may have been remobilised from a larger body of
massive sulphide at depth or along strike. Importantly, two of the zones do not appear to have any
surface expression (Figure 3).
The veins and breccias are interpreted to dip steeply to the south and occur within metasedimentary
rocks beneath a thin unit of shallow dipping ultramafic rock that forms part of the Red Hill intrusion
(Figure 3).
Figure 2a. Nickel
and iron
sulphides.
Figure 2b. Boxwork
gossan texture
replacing massive
iron sulphide.
Figure 2c. Iron oxide
(haematite) replacing
iron sulphide and
nickel sulphide with
fresh copper sulphide
in vein at contact
between mafic unit
and metasediment.
Figure 2d. Contact
between
metasedimentary rock
and 15 cm thick
chalcopyrite-chalcocite
(secondary sulphide.
A follow up drill hole, RHD006, has intersected a 27 m thick zone containing multiple zones of high
grade nickel and copper including, for the first time, massive sulphide in a 0.5 m wide unit (Figures 1
and 3, Tables 1 and 2). This mineralisation occurs above RHD001.
Figure 3. Cross Section along Line 555,370 mE.
The massive sulphide unit in RHD006 comprises pyrite and pyrrhotite (iron sulphides) with nickel
sulphides and copper sulphides and contains textures that suggest it may have been remobilised from a
larger body of massive sulphide at depth or along the mineralised trend (Figure 4).
The mineralised zones are interpreted to dip moderately to steeply south and therefore may be close
to true width (Figure 3). However the host veins, breccias and massive sulphide show small scale
complexities in dip and strike that are not yet resolved.
All of the mineralisation lies within metasedimentary rocks that lie beneath a small outlier of the Red
Hill ultramafic intrusion (Figure 4). Accordingly there is significant potential for further similar
mineralised zones beneath the main body of the intrusion as well.
Hole RHD005, drilled to test an EM anomaly to the immediate north west of the Red Hill intrusion,
intersected narrow veins of copper, zinc and lead mineralisation that are insufficient to explain the
strength of the EM anomaly.
Next Steps
The drill programme at Red Hill is now finished. Three of the drill holes, RDH001, RDH003 and
RDH005 have been cased in preparation for down-hole geophysical surveys to try and identify further
drill targets at depth. These are expected to commence within a few weeks.
The drill intercepts in RHD001 are the first significant drill intercepts of nickel and copper within
Impact’s project area away from the high grade drill intercept of 2 m at 6.1% nickel, 4.5% copper,
10.9 g/t platinum and 23.6 g/t palladium in fresh sulphide discovered some years ago by previous
explorers at the Platinum Springs prospect some 15 km to the north east. There are many strike
kilometres of the same ultramafic host rock that contain high grade nickel-copper-PGE rock chip
assays similar to those at Platinum Springs and Red Hill that have never been drilled. These results
at Red Hill confirm Impact’s belief that there is potential for a significant discovery near Broken Hill.
Table 1. Assay results, drill intercepts and cut off grades for RHD001
Hole ID
From
To
Interval
Cu
%
Ni%
PGE(+Au)
g/t
Pt
Pd
Au
Ag
Cutoff
Cu%
RHD001
46
78
32
0.97
0.45
3.9
1.5
2.3
0.1
10.6
0.1
including
46
49.7
3.7
0.44
0.65
2.1
0.5
1.6
0
3
0.4
and
53.7
55.64
1.9
2.01
1.19
4.7
1.1
3.4
0.2
15.9
1
including
53.7
63.2
9.5
1.53
0.79
4.7
2.2
2.4
0.1
13.6
0.4
also including
57.27
62.4
5.1
1.9
0.88
6.2
3.2
2.9
0.2
17.6
1
including
67
76.93
9.9
1.44
0.3
6.7
2.5
3.9
0.3
19.2
0.4
also including
71.6
75.8
4.2
2.59
0.49
10.6
4.9
5.4
0.4
0
1
Table 2. Drill Hole Summary
Collar ID
Prospect
Drill type
Easting
Northing
Dip
Azimuth
Depth
RHD001
Red Hill Mine
Diamond
555372
6454310
-55
10
94
RHD002
Red Hill Mine IP
Diamond
555372
6454302
-75
300
243.5
RHD003
Simons Find
Diamond
555431
6454598
-80
225
229.9
RHD004
Central IP
Diamond
555517
6454391
-60
255
210.4
RHD005
Northern EM
Diamond
555250
6454700
-60
90
131.2
RHD006
Red Hill Mine
Diamond
555380
6454299
-46.5
0
103.1
The Red Hill Prospect
The host ultramafic intrusive unit at Red Hill, which outcrops over an area of about 500 sq metres,
has a nickel-rich core and copper-precious metal-rich margins (announcement dated 21 May 2014).
This is a common feature in many major nickel-copper-precious metal sulphide deposits around the
world.
The centre of the unit is marked by nickel-in-soil values greater than 10,000 ppb and up to
16,100 ppb nickel (MMI digest) that is 100 m wide and 300 m long. The current drill programme has
helped reaffirm this area as a priority target for drilling. Both the western and, in particular, the
eastern margins of the unit are marked by copper-in-soil results greater than 2,500 ppb and up to
16,200 ppb copper (MMI digest) that are up to 200 m wide and 600 m long (Figure 4). Within these
margins there are a further three priority areas for follow up work that contain greater than 20 ppb
platinum+palladium+gold-in-soil results (fire assay) covering several hundred square metres and
which contain rock chip samples with high grade nickel, copper and precious metal assays (Figure 4):
1. At the Red Hill Shaft, mined to a depth of about 40 m in the early 1900’s, grab samples from
outcrops around the shaft returned up to 16 g/t platinum, 12.1 g/t palladium, 4.2% nickel,
7.7% copper, 1.3 g/t gold and 221 g/t silver. Rock chip samples from a surface excavation
about 50 m long located 100 m to the south of the shaft returned up to 1 g/t platinum,
2.6 g/t palladium, 0.9% nickel, 0.8% copper, 1.8 g/t gold and 3.3 g/t silver.
2. At Simons Find, rock chip samples returned up to 0.7 g/t platinum, 1.7 g/t palladium,
0.4% nickel, 0.1% copper, 1.9 g/t gold and 6.6 g/t silver.
3. In the south east corner of the intrusion, grab samples from weathered rocks associated with
some surface diggings returned up to 22% copper, 0.2% nickel, 0.8 g/t gold and 91.1 g/t silver.
The soil geochemistry survey was completed by Impact at a spacing of 50 m by 50 m and submitted
for analysis by the MMI partial digest (nickel and copper) and fire assay (platinum, palladium, gold
and silver).
RDH005
RDH003
RDH004
RDH002
RDH001 and 006
Figure 4. Geology of the Red Hill Prospect showing drill hole locations and soil geochemistry results
and rock chip assays.
2. OTHER PROJECTS
2.1 COMMONWEALTH PROJECT (IMPACT 100%)
The Commonwealth Project is located 95 km north of Orange in New South Wales within the highly
prospective Lachlan Fold Belt, host to many major gold-silver-base metal mines including the
Cadia-Ridgeway deposits that contain 25 million ounces of gold and 12 million tonnes of copper
(Figure 1).
During the Quarter, a three dimensional model of the geology and mineralisation of the Main Shaft to
Commonwealth South area was completed and used to help calculate a maiden Inferred Resource
for the deposit. This resource, although likely to be modest in size, will help define a minimum
economic threshold for the project. Final verification of the resource is in progress and will be
reported when complete.
In addition, follow up IP and gravity surveys were completed over the very prospective Doughnut
porphyry copper-gold target identified by Impact in a soil geochemistry survey 2 km to the north.
Here, Impact has identified a large zoned elliptical zinc-lead-copper-gold-silver anomaly that is
1.2 km by 750 m in dimension similar to those associated with a number of major porphyry coppergold deposits around the world.
2.2 MULGA TANK PROJECT (IMPACT 100%, 20%, 25% AND EARNING 50-75%)
During the Quarter, Impact was awarded a grant of $150,000 as part of the West Australian
Government’s Exploration Incentive Scheme for drilling at the Mulga Tank project. The EIS, a cofunding initiative for exploration in under explored areas and awarded on a dollar-for-dollar basis for
direct drilling costs, has been designed to encourage innovative exploration and prioritised high
quality technically sound proposals that demonstrate new exploration concepts.
The grant was given to test the basal contact of the Mulga Tank dunite for high grade nickel-copperPGE deposits.
3. CORPORATE
The Annual General Meeting was held on Thursday, 27th November 2014 and all resolutions were
passed. We thank all those shareholders who attended.
During the Quarter Impact received a rebate of $1.14 million from the Australian Tax Office for its
Research and Development Activities during the 2014 Financial Year.
Cash Balance at the end of 31 December 2014 was $2.17 million.
On 16 January 2015 the Company issued 142,045 Company shares each to Dr Markus Elsasser and Mr
Paul Ingram in accordance with resolution 4 and 5 of the Annual General Meeting held on
27th November 2014.
Dr Michael G Jones
Managing Director
The review of exploration activities and results contained in this report is based on information compiled by Dr Mike Jones, a Member of
the Australian Institute of Geoscientists. He is a director of the company and works for Impact Minerals Limited. He has sufficient
experience which is relevant to the style of mineralisation and types of deposits under consideration and to the activity which he is
undertaking to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves (the JORC Code). Mike Jones has consented to the inclusion in the report of the matters based on
his information in the form and context in which it appears
APPENDIX 1 - SECTION 1 SAMPLING TECHNIQUES AND DATA
Criteria
Sampling techniques
Drilling techniques
Drill sample recovery
Logging
JORC Code explanation
Commentary
Nature and quality of sampling (e.g. cut channels, random chips, or specific
specialised industry standard measurement tools appropriate to the minerals
under investigation, such as down hole gamma sondes, or handheld XRF
instruments, etc). These examples should not be taken as limiting the broad
meaning of sampling.
Random rock samples were taken at surface which represented favourable geology and alteration to known
mineralisation in the region. Samples are variably weathered.
Soil samples were taken at 50 m intervals from a hole 15-20 deep and sieved to -2mm to collect about 250 g of
material.
A handheld XRF instrument was used to analyse the drill core at 50 cm intervals.
Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used
Representative rock chip samples at each sample site weigh between 0.8 and 1.2 kg. Soil samples are taken at a
consistent depth below surface and sieved.
The XRF measurements were taken to prevent a bias towards mineralised intervals.
Aspects of the determination of mineralisation that are Material to the Public
Report. In cases where ‘industry standard’ work has been done this would be
relatively simple (e.g. ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may be required, such as where there is
coarse gold that has inherent sampling problems. Unusual commodities or
mineralisation types (e.g. submarine nodules) may warrant disclosure of
detailed information
Rock samples were sent to Intertek Adelaide where they were crushed, dried and pulverised (total prep) to
produce a 25-30 g sub-sample for analysis by four acid digest with an ICP/AES finish for ore grade base metal
samples and lead collection fire assay with AAS finish for gold and precious metals. Weathered samples
contained gossanous sulphide material. Soil samples were sent to SGS Perth for analysis by the MMI digest.
The XRF data is qualitative only. A comparison between the XRF results and wet chemical assay data will be
completed on receipt of final results.
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details (e.g. core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc).
No drilling results are reported.
Method of recording and assessing core and chip sample recoveries and results
assessed
No drilling results are reported.
Measures taken to maximise sample recovery and ensure representative nature
of the samples
No drilling results are reported.
Whether a relationship exists between sample recovery and grade and whether
sample bias may have occurred due to preferential loss/gain of fine/coarse
material.
No drilling results are reported.
Whether core and chip samples have been geologically and geotechnically
logged to a level of detail to support appropriate Mineral Resource estimation,
mining studies and metallurgical studies.
No drilling results are reported.
Whether logging is qualitative or quantitative in nature. Core (or costean,
channel, etc) photography.
No drilling results are reported.
The total length and percentage of the relevant intersections logged
No drilling results are reported.
Criteria
Sub-sampling techniques and
sample preparation
Quality of assay data and
laboratory tests
Verification of sampling and
assaying
Location of data points
JORC Code explanation
Commentary
If core, whether cut or sawn and whether quarter, half or all core taken.
No drilling results are reported.
If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled
wet or dry.
No drilling results are reported.
For all sample types, the nature, quality and appropriateness of the sample
preparation technique.
The sample preparation techniques follow industry best practice.
Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
Laboratory QC procedures for rock sample assays involve the use of internal certified reference material as
assay standards, along with blanks, duplicates and replicates.
Measures taken to ensure that the sampling is representative of the in situ
material collected, including for instance results for field duplicate/second-half
sampling.
Field duplicates were taken at selected sample sites.
Whether sample sizes are appropriate to the grain size of the material being
sampled.
This is not relevant to soil and rock chip results.
The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total.
Industry standard assay techniques were used.
For geophysical tools, spectrometers, handheld XRF instruments, etc, the
parameters used in determining the analysis including instrument make and
model, reading times, calibrations factors applied and their derivation, etc.
No geophysical tools were used to determine material element concentrations.
Nature of quality control procedures adopted (e.g. standards, blanks, duplicates,
external laboratory checks) and whether acceptable levels of accuracy (i.e. lack
of bias) and precision have been established.
For the rock chips, quality control procedures for assays were followed via internal laboratory protocols.
Accuracy and precision are within acceptable limits.
The verification of significant intersections by either independent or alternative
company personnel.
The results have not been verified by independent or alternative companies. This is not required at this stage of
exploration.
The use of twinned holes.
No drilling results are reported.
Documentation of primary data, data entry procedures, data verification, data
storage (physical and electronic) protocols.
Primary assay data for rock chips has been entered into standard Excel templates for plotting in Mapinfo.
Discuss any adjustment to assay data.
There are no adjustments to the assay data.
Accuracy and quality of surveys used to locate drillholes (collar and down-hole
surveys), trenches, mine workings and other locations used in Mineral Resource
estimation.
Specification of the grid system used.
Sample locations were located by hand held GPS.
The grid system for Broken Hill is MGA_GDA94, Zone 54.
Criteria
JORC Code explanation
Commentary
Quality and adequacy of topographic control.
Standard government topographic maps have been used for topographic validation. The DGPS is considered
sufficiently accurate for elevation data.
Data spacing for reporting of Exploration Results.
Sample spacing for the soil survey was on a 50 m by 50 m grid.
Whether the data spacing and distribution is sufficient to establish the degree of
geological and grade continuity appropriate for the Mineral Resource and Ore
Reserve estimation procedure(s) and classifications applied.
Estimations of grade and tonnes have not yet been made.
Whether sample compositing has been applied.
Sample compositing has not been applied.
Whether the orientation of sampling achieves unbiased sampling of possible
structures and the extent to which this is known, considering the deposit type.
Not relevant to soil and rock chip results.
If the relationship between the drilling orientation and the orientation of key
mineralised structures is considered to have introduced a sampling bias, this
should be assessed and reported if material.
Not relevant to soil and rock chip results.
Sample security
The measures taken to ensure sample security.
Chain of custody is managed by Impact Minerals Ltd. Samples for Broken Hill are delivered by Impact Minerals
Ltd by courier who transports them to the laboratory for prep and assay. Whilst in storage, they are kept in a
locked yard. Tracking sheets have been set up to track the progress of batches of samples.
Audits or reviews
The results of any audits or reviews of sampling techniques and data.
At this stage of exploration a review of the sampling techniques and data by an external party is not warranted.
Data spacing and distribution
Orientation of data in relation to
geological structure
SECTION 2 REPORTING OF EXPLORATION RESULTS
Criteria
JORC Code explanation
Commentary
Type, reference name/number, location and ownership including agreements or
material issues with third parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites, wilderness or national park and
environmental settings.
The Broken Hill Project currently comprises 1 exploration licences covering 100 km2. The tenement is held 100%
by Golden Cross Resources Ltd. Impact Minerals Limited is earning 80% of the nickel-copper-PGE rights in the
licence from Golden Cross. No aboriginal sites or places have been declared or recorded over the licence area.
There are no national parks over the license area.
The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area.
The tenement is in good standing with no known impediments.
Exploration done by other parties
Acknowledgment and appraisal of exploration by other parties.
There has been no significant previous work at this prospect.
Geology
Deposit type, geological setting and style of mineralisation.
Nickel-copper-PGE sulphide mineralisation associated with an ultramafic intrusion.
Drill hole Information
A summary of all information material to the understanding of the exploration
results including a tabulation of the following information for all Material drill
holes:
easting and northing of the drill hole collar
elevation or RL (Reduced Level – elevation above sea level in metres)
of the drill hole collar
dip and azimuth of the hole
down hole length and interception depth
hole length.
No drilling results are reported.
Mineral tenement and land
tenure status
Data aggregation methods
Relationship between
mineralisation widths and
intercept lengths
In reporting Exploration Results, weighting averaging techniques, maximum
and/or minimum grade truncations (e.g. cutting of high grades) and cut-off
grades are usually Material and should be stated.
Where aggregate intercepts incorporate short lengths of high grade results and
longer lengths of low grade results, the procedure used for such aggregation
should be stated and some typical examples of such aggregations should be
shown in detail.
This is not relevant.
The assumptions used for any reporting of metal equivalent values should be
clearly stated.
No metal equivalents have been reported.
These relationships are particularly important in the reporting of Exploration
Results.
If the geometry of the mineralisation with respect to the drill hole angle is
known, its nature should be reported.
If it is not known and only the down hole lengths are reported, there should be
a clear statement to this effect (e.g. ‘down hole length, true width not known’).
Historical drill holes to date have been sub-perpendicular to the mineralised trend and stratigraphy so intervals
are close to true width or otherwise stated.
Criteria
Diagrams
Balanced reporting
JORC Code explanation
Commentary
Appropriate maps and sections (with scales) and tabulations of intercepts
should be included for any significant discovery being reported These should
include, but not be limited to a plan view of drill hole collar locations and
appropriate sectional views.
Refer to Figures in body of text.
Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration Results.
All results reported are representative
Other substantive exploration
data
Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical survey
results; geochemical survey results; bulk samples – size and method of
treatment; metallurgical test results; bulk density, groundwater, geotechnical
and rock characteristics; potential deleterious or contaminating substances.
Further work
The nature and scale of planned further work (e.g. tests for lateral extensions or
depth extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of possible extensions, including the
main geological interpretations and future drilling areas, provided this
information is not commercially sensitive
Assessment of other substantive exploration data is not yet complete however considered immaterial at this
stage.
Follow up work programmes will be subject to interpretation of recent and historic results which is ongoing.
Appendix 5B
Mining exploration entity quarterly report
Rule 5.3
Appendix 5B
Mining exploration entity quarterly report
Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10
Name of entity
IMPACT MINERALS LIMITED
ABN
Quarter ended (“current quarter”)
52 119 062 261
December 2014
Consolidated statement of cash flows
Cash flows related to operating activities
1.1
Receipts from product sales and related
debtors
1.2
Payments for (a) exploration &
evaluation
(b) development
(c) production
(d) administration*
Dividends received
Interest and other items of a similar nature
received
Interest and other costs of finance paid
Income taxes paid
Other (R&D tax concession)
Net Operating Cash Flows
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
1.11
1.12
1.13
Current quarter
$A’000
Year to date (6
months)
$A’000
(635)
(1,657)
(316)
(690)
4
10
1,185
239
1,185
1,152
-
-
Cash flows related to investing activities
Payment for purchases of: (a) prospects
(b) equity investments
(c) other fixed assets
(d)
environmental bonds
Proceeds from sale of:
(a) prospects
(b) equity investments
(c) other fixed assets
Loans to other entities
Loans repaid by other entities
Other – (Scheme of Arrangement Costs)
Net investing cash flows
Total operating and investing cash flows
(carried forward)
+ See chapter 19 for defined terms.
17/12/2010 Appendix 5B
Page 1
-
Appendix 5B
Mining exploration entity quarterly report
1.13
1.14
1.15
1.16
1.17
1.18
1.19
Total operating and investing cash flows
(brought forward)
-
Cash flows related to financing activities
Proceeds from issues of shares, options, etc.
Proceeds from sale of forfeited shares
Proceeds from borrowings
Repayment of borrowings
Dividends paid
Other – Share issue costs
Net financing cash flows
-
2,587
(14)
2,573
-
Net increase (decrease) in cash held
239
1,421
1.20
1.21
Cash at beginning of quarter/year to date
Exchange rate adjustments to item 1.20
1,932
750
1.22
Cash at end of quarter
2,171
2,171
Payments to directors of the entity and associates of the directors
Payments to related entities of the entity and associates of the
related entities
Current quarter
$A'000
1.23
Aggregate amount of payments to the parties included in item 1.2
81
1.24
Aggregate amount of loans to the parties included in item 1.10
-
1.25
Explanation necessary for an understanding of the transactions
1.23 Director Fees
Non-cash financing and investing activities
2.1
Details of financing and investing transactions which have had a material effect on
consolidated assets and liabilities but did not involve cash flows
2.2
Details of outlays made by other entities to establish or increase their share in projects in
which the reporting entity has an interest
Financing facilities available
Add notes as necessary for an understanding of the position.
+ See chapter 19 for defined terms.
Appendix 5B
Page 2
17/12/2010
Appendix 5B
Mining exploration entity quarterly report
Amount available
$A’000
3.1
Loan facilities
3.2
Credit standby arrangements
Amount used
$A’000
Estimated cash outflows for next quarter
$A’000
4.1
Exploration and evaluatio
Share your feedback