Outstanding Airborne EM Anomalies at the Arkun Project
Released
Released
Announcement PDF
ASX Code: IPT
SEPTEMBER 18, 2023
CORPORATE RELEASE
OUTSTANDING AIRBORNE EM ANOMALIES
AT THE ARKUN BATTERY METALS PROJECT, WA
•
Twenty moderate to strong electromagnetic (EM) conductors identified at the Arkun Battery Metals
project in 400 m line-spaced airborne electromagnetic (“AEM”) survey data collected by the XCalibur
HELITEM time-domain system.
•
Several priority anomalies coincide with magnetic and gravity anomalies and Ni Cu PGM-in-soil
anomalies.
•
Many other anomalies have yet to be soil sampled, and this work is a priority for the next Quarter with
a view to a maiden drill programme in Q1 2024.
•
Broken Hill update: Xplor programme completed. IGO withdraws from joint venture over the alkaline
intrusions. Data synthesis and interpretation in progress of all data collected during Xplor and by IGO.
Both BHP and IGO remain interested in the broader Broken Hill project.
Impact Minerals (ASX:IPT) is pleased to announce that it has identified 20 moderate to strong conductors in
airborne electromagnetic (AEM) data flown over parts of its 100% owned Arkun Project in the emerging
mineral province of southwest Western Australia, a Tier One jurisdiction (Figure 1).
Impact Minerals’ Managing Director, Dr. Mike Jones, said, “These new conductors at Arkun look very
promising and significantly increase the potential for the discovery of massive nickel-copper-PGM sulphides.
What’s particularly exciting is that some conductors have coincident soil geochemistry anomalies. However,
with many of them still yet to be soil sampled, we are confident of generating more targets for follow-up
work, which will include drilling. With the recent REE soil anomalies identified throughout the project area,
including the standout Horseshoe prospect, Arkun continues to emerge as a major project for a wide range of
essential battery and strategic minerals.”
The airborne EM survey was completed over seven priority areas, covering only about 15% of the Arkun
project, by XCalibur Multiphysics using the HELITEM system at a line spacing of 400 metres (Figure 2).
The 20 conductors were identified using a combination of interpretation of individual lines of EM data by
consultants Resource Potentials and by reprocessing of the survey data by Intrepid Geophysics using their
proprietary 2.5D AEM inversion algorithm. The 2.5D inversion process provides conductivity models and can
image steeply dipping, deep, and near-surface targets.
If you require any further information on this announcement or have any questions you would like to ask Impact
Minerals please go to https://investors.impactminerals.com.au/auth/signup or scan this QR Code:
ABN 52 119 062 261
61+ 8 6454 6666
info@impactminerals..com.au
www.impactminerals.com.au
Figure 1. Image of regional magnetic data showing the location of the Arkun project along trend from the
Julimar/Gonneville Ni-Cu-PGE deposit owned by Chalice Mining Limited (ASX: CHN). Also shown is ground held by
private company Northam Mining Ltd, in which Chalice Mining is now earning an interest via a joint venture, and
ground held by Anglo American Corporation, which surrounds the Arkun Project on three sides. The green lines are
publicly available regional AEM flight lines flown in 2020, including one line over the Gonneville deposit (Figure 7).
ASX:IPT | ABN 52 119 062 261
Two of the survey areas contain numerous EM conductors that have broadly coincident strong nickelcopper-PGM soil geochemistry anomalies: these include 5 AEM anomalies at the Three Eagles prospect and
6 AEM anomalies at the Starfish complex (Figures 2 and 3; and ASX Release 9 August 2023).
In addition, the EM conductors are commonly coincident either with magnetically quiet areas and/or gravityhighs in regional geophysical data, which together may represent mafic and ultramafic intrusions that are
potential hosts for nickel-copper-PGM mineralisation (Figures 2 and 3).
Figure 2. Image of regional magnetic data showing the location of the 7 AEM survey areas showing
priority conductors (white squares). Three survey lines (AEM-1, AEM-2 and AEM-3) are shown
in detail in Figures 4, 5 and 6.
ASX:IPT | ABN 52 119 062 261
Figure 3. Image of regional gravity data showing the location of the 7 AEM survey areas showing
priority conductors (white squares). Note the Starfish Complex is associated with a strong gravity anomaly. Three
survey lines (AEM-1, AEM-2 and AEM-3) are detailed in Figures 4, 5 and 6.
THREE PRIORITY CONDUCTORS
Three prominent conductors that are priority areas for follow-up work have been identified in the 2.5D
inversions and are shown here as examples.
ASX:IPT | ABN 52 119 062 261
At the Starfish Complex, a strong north-easterly dipping conductor and a weaker south-westerly dipping
conductor have been defined in an area with mapped mafic and ultramafic rocks that are variably intruded
by granites (Figure 4). The area is also coincident with the edge of a gravity high (AEM-1 Figure 3).
Figure 4. Line 50110. AEM-1 (Figures 3 and 4). Reprocessed 2.5D inversion highlighting strong, steeply dipping deep
conductor, which occurs on a gravity high. This area also has elevated Ni-Cu-PGM-in-soil anomalies (ASX Release
August 9th 2023).
A second prominent, isolated conductor is also present at Starfish and coincides with a strong gravity high
and Ni-Cu-PGE-in-soil anomalies (Figure 5).
Figure 5. Line 50040. AEM-2 (Figures 3 and 4). Reprocessed 2.5D inversion highlighting a single strong deep conductor
centred on a gravity high and Ni-Cu-PGM-in soil anomalies (ASX Release August 9th 2023).
In the Three Eagles area, a single prominent conductor is evident at the north-eastern end of the survey line
(Figure 6). This coincides with strong magnetic linear units that may be mafic rocks and which are also
adjacent to a significant NW-SE trending structure visible in the magnetic data. This area has yet to be soil
sampled.
Figure 6. Line 20230. AEM-3 (Figures 3 and 4). Reprocessed 2.5D inversion highlighting strong deep conductor centred
on a strong major magnetic lineament and steep moderate to low gravity gradient.
For comparison, a case study of the Julimar intrusion that hosts the Gonneville discovery is shown in
Figure 7.
ASX:IPT | ABN 52 119 062 261
Figure 7. 2.5D Inversion Case Study Over the Gonneville deposit
The Intrepid 2.5D AEM inversion was completed for a single survey line of regional government airborne EM
data (SkyTEM system) flown directly over the Gonneville nickel-copper-PGM deposit at the southern end of
the Julimar Complex (Figure 1). A significant conductor is directly associated with the intrusion and the
resource and is of a similar size and strength to some of those at Arkun.
Plan Map of the Julimar Intrusion showing the Gonneville deposit and the location of the AEM Survey Line
(from https://chalicemining.com/exploration-projects/julimar/
3D view of the 2.5D Inversion of the SkyTEM survey line showing a significant conductor
directly associated with the mineralised part of the Gonneville intrusion (this work).
ASX:IPT | ABN 52 119 062 261
NEXT STEPS
Follow-up field checking and rock chip sampling will commence in early October, together with infill and new
soil geochemistry surveys. Access is dependent on the current harvest season. The aim is to define drill
targets for a maiden drill programme at Arkun in Q1 2024.
The follow-up work will also include the areas identified for REE mineralisation (ASX Release June 1 st 2023)
and lithium pegmatites (ASX Release August 18th 2022, and September 21st 2021).
About the Airborne Electromagnetic Survey at Arkun
The Arkun survey, carried out by XCalibur Multiphysics, consisted of 921.4 line kilometres at 400m line
spacing over seven priority areas. Data were acquired using a HELITEM2 electromagnetic system
supplemented by a high-sensitivity cesium magnetometer.
The HELITEM2 system comprises a 40-metre-long cable attached between the helicopter and the
transmitter loop, which, when in flight, is about 35 m below the helicopter (Figure 8). The receiver platform
and the receiver coil are located at the centre of the 35 m diameter transmitter loop. The real-time
navigation GPS antenna is on the tail boom of the helicopter. The barometric altimeter, radar altimeter,
laser altimeter and data recorder are all installed in the helicopter. GPS antennae are attached to the
transmitter loop to give positional information and transmitter orientation. An IMU is mounted on the front
of the transmitter loop to measure receiver pitch, roll and yaw.
Figure 8: Geometry of the HELITEM system
ASX:IPT | ABN 52 119 062 261
BROKEN HILL PROJECT UPDATE
Impact’s Quarterly report for June (ASX Release July 31st 2023) noted that funding under the BHP Xplor
programme ended on June 30th 2023.
BHP Xplor, an accelerator program introduced by BHP in August 2022, is designed to help provide
participants with the opportunity to accelerate their growth and the potential to establish a long-term
partnership with BHP and its global network of partners. Impact was one of seven companies selected
globally to be part of the first cohort of the Xplor programme (ASX Release January 17th 2023).
Impact believes there is significant untapped exploration potential at Broken Hill for copper mineralisation. It
has been working with world-renowned geologist Prof. Tony Crawford on a new model for copper
associated with mafic intrusions that are part of the Broken Hill Group rocks.
As part of the Xplor programme, extensive field checking and rock chip sampling of mafic intrusions
throughout the Broken Hill stratigraphy has been completed. About 600 rock chip samples were submitted
for comprehensive major and trace element whole-rock geochemistry to help establish the provenance and
metal-carrying potential of the mafic rocks. Final assays were only recently received, and all the data is now
being interpreted.
In addition, two geophysical surveys were completed as case studies over known zinc-lead-silver-copper
mineralisation at Impact’s Dora East prospect: a ground SAM survey and a ground AMT survey. The surveys
were designed to validate the potential of both the SAM and MT methods to identify massive and
disseminated sulphide mineralisation that can not be detected by EM methods (e.g. sphalerite, galena, etc.)
with a view to considering airborne surveys using those methods.
In addition, and for the first time in the Broken Hill region, a regional magneto-telluric (MT) survey designed
to elucidate the deep structure under Broken Hill was also recently completed as part of the Xplor
programme. This data is currently being processed and interpreted. All the data collected for the Xplor
program will be synthesised and analysed over the next few months.
Once complete, this work will be presented to BHP, who remain interested in the Broken Hill project. There
are no ongoing confidentiality conditions to the data Impact has collected, and the company is free to do as
it wishes.
In addition, Impact is also integrating the work completed by IGO Limited (ASX:IGO), who have now
withdrawn from the joint venture over the late-stage, nickel-copper-PGM-bearing alkaline intrusions
prospective at Broken Hill (ASX Release November 16th 2022). The joint venture area comprised a small
portion of the Broken Hill project area.
This follows the return of no significant drill results in one diamond drill hole drilled to test a prominent
ground Em anomaly at the southern end of the Moorkai Trend (ASX Release 16th November 2022). IGO has
expressed interest in the broader Broken Hill area, and Impact will also present its new findings on the area
to them in due course.
COMPLIANCE STATEMENT
This report contains new Exploration Results for airborne electromagnetic results across the Arkun Project.
Dr. Michael G. Jones
Managing Director
ASX:IPT | ABN 52 119 062 261
Competent Person’s Statement
The review of exploration activities and results in this report is based on information compiled by Dr Mike Jones, a Member
of the Australian Institute of Geoscientists. He is a director of the company and works for Impact Minerals Limited. He has
sufficient experience relevant to the style of mineralisation and types of deposits under consideration and to the activity
which he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code). Mike Jones has consented to the
inclusion in the report of the matters based on his information in the form and context in which it appears.
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Sampling techniques
•
Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard measurement
tools appropriate to the minerals under investigation, such as
down hole gamma sondes, or handheld XRF instruments, etc).
These examples should not be taken as limiting the broad
meaning of sampling.
•
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
•
Aspects of the determination of mineralisation that are
Material to the Public Report.
•
Description of ‘industry standard’ work
Drilling techniques
•
Drill type (e.g. core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc) and details (e.g. core
diameter, triple or standard tube, depth of diamond tails, facesampling bit or other type, whether core is oriented and if so, by
what method, etc).
Drill sample recovery
•
Method of recording and assessing core and chip sample
recoveries and results assessed.
Logging
Commentary
•
The airborne EM survey was flown at
400 m line spacing over 7 areas of
interest within the Arkun project
area.
N/A
•
N/A
•
The survey was completed on a
grid to ensure representative
sampling.
•
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
•
Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
•
It is not possible to determine
sample bias at this stage.
However EM surveys are
subject to poor results if the
orientation of the target
sulphide orebody is not oriented
to couple-well with the survey
parameters.
•
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
•
N/A
•
Whether logging is qualitative or quantitative in nature. Core
(or costean, channel, etc) photography.
•
The total length and percentage of the relevant intersections
logged.
ASX:IPT | ABN 52 119 062 261
Criteria
JORC Code explanation
Commentary
Sub-sampling
techniques and
sample preparation
•
If core, whether cut or sawn and whether quarter, half or all
core taken.
•
N/A
•
•
N/A
If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
•
•
For all sample types, the nature, quality and appropriateness of
the sample preparation technique.
The size and line spacing of the
geophysical survey is appropriate for
first pass exploration.
•
•
Quality control procedures adopted for all sub-sampling stages
to maximise representivity of samples.
Standard QC procedures are used by
XCalibur Geophysics to determine data
is of suitable quality..
•
Measures taken to ensure that the sampling is representative of
the in-situ material collected, including for instance results for
field duplicate/second-half sampling.
•
N/A
•
Line spacing is appropriate.
•
N/A
•
The results have not been verified
by independent or alternative
companies. This is not required at
this stage of exploration.
•
N/A.
•
There are no adjustments to the
geophysical data apart from normal
noise removal..
Quality of assay data
and laboratory tests
Verification of
sampling and
assaying
Location of data
points
Data spacing and
distribution
•
Whether sample sizes are appropriate to the grain size of the
material being sampled.
•
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
•
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining the
analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.
•
Nature of quality control procedures adopted (e.g. standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of bias) and precision
have been established.
•
The verification of significant intersections by either
independent or alternative company personnel.
•
The use of twinned holes.
•
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
•
Discuss any adjustment to assay data.
•
Accuracy and quality of surveys used to locate drill holes (collar
and down-hole surveys), trenches, mine workings and other
locations used in Mineral Resource estimation.
•
Airborne DGPS
•
•
Datum is MGA 2020 Zone 51
South
Specification of the grid system used.
•
•
Quality and adequacy of topographic control.
Topographic control on RL is
adequate for exploration results
•
Data spacing for reporting of Exploration Results.
•
N/A
•
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
•
N/A
•
N/A
•
There was no sample
compositing.
•
ASX:IPT | ABN 52 119 062 261
Whether sample compositing has been applied.
Criteria
JORC Code explanation
Commentary
Orientation of data
in relation to
geological structure
•
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this is
known, considering the deposit type.
•
The survey was flown at 90 degrees
to the stratigraphy where possible.
•
•
N/A
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to have
introduced a sampling bias, this should be assessed and
reported if material.
Sample security
•
The measures taken to ensure sample security.
•
N/A
Audits or reviews
•
The results of any audits or reviews of sampling techniques and
data.
•
At this stage of exploration a review
of the sampling techniques and data
by an external party is not
warranted.
Section 2 Reporting of Exploration Results
Criteria listed in the preceding section also apply to this section.
Criteria
JORC Code explanation
Commentary
Mineral tenement
and land tenure
status
•
Type, reference name/number, location and ownership
including agreements or material issues with third parties such
as joint ventures, partnerships, overriding royalties, native title
interests, historical sites, wilderness or national park and
environmental settings.
•
•
The security of the tenure held at the time of reporting along
with any known impediments to obtaining a licence to operate
in the area.
The Arkun-Beau-Jumbo
Project currently comprises 9
exploration licences covering
about 2,100 km2. The
tenements are held 100% by
Aurigen Pty Ltd a 100%
owned subsidiary of Impact
Minerals Limited. Impact has
signed Land Access
agreements in place with the
various Native Title claimants
that cover the area and with
selected landowners. No
known impediment to
exploration is known
Exploration done by
other parties
•
Acknowledgment and appraisal of exploration by other parties.
•
Nil
Geology
•
Deposit type, geological setting and style of mineralisation.
•
Magmatic nickel sulphide
Drill hole
Information
•
A summary of all information material to the understanding of
the exploration results including a tabulation of the following
information for all Material drill holes:
•
N/A
•
easting and northing of the drill hole collar
•
elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
•
dip and azimuth of the hole
•
down hole length and interception depth
•
hole length.
•
If the exclusion of this information is justified on the basis that
the information is not Material and this exclusion does not
detract from the understanding of the report, the Competent
Person should clearly explain why this is the case.
•
In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations (e.g.
cutting of high grades) and cut-off grades are usually Material
and should be stated.
•
N/A
•
Where aggregate intercepts incorporate short lengths of highgrade results and longer lengths of low-grade results, the
procedure used for such aggregation should be stated and some
typical examples of such aggregations should be shown in
detail.
•
The assumptions used for any reporting of metal equivalent
values should be clearly stated.
Data aggregation
methods
ASX:IPT | ABN 52 119 062 261
Criteria
JORC Code explanation
Commentary
Relationship
between
mineralisation
widths and intercept
lengths
•
These relationships are particularly important in the reporting
of Exploration Results.
•
N/A
•
If the geometry of the mineralisation with respect to the drill
hole angle is known, its nature should be reported.
•
If it is not known and only the down hole lengths are reported,
there should be a clear statement to this effect (e.g. ‘down hole
length, true width not known’).
Diagrams
•
Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view
of drill hole collar locations and appropriate sectional views.
•
A map showing tenement
locations has been included
•
Maps showing exploration results are
provided
Balanced reporting
•
Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high
grades and/or widths should be practiced to avoid misleading
reporting of Exploration Results.
•
N/A
Other substantive
exploration data
•
Other exploration data, if meaningful and material, should be
reported including (but not limited to): geological observations;
geophysical survey results; geochemical survey results; bulk
samples – size and method of treatment; metallurgical test
results; bulk density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating
substances.
•
N/A
Further work
•
The nature and scale of planned further work (e.g. tests for
lateral extensions or depth extensions or large-scale step-out
drilling).
•
Follow up soil geochemistry surveys
and field checking is required..
•
Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling
areas, provided this information is not commercially sensitive.
ASX:IPT | ABN 52 119 062 261
Share your feedback
Discover