NSW Government Co-Funding for Drilling at Broken Hill
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
Date: 18 September 2014
Number: 365/180914
IMPACT TO RECEIVE $125,000 CO-FUNDING FROM THE N.S.W. GOVERNMENT
FOR MAIDEN DRILL PROGRAMME AT THE HIGH GRADE NICKEL-COPPER-PGE
RED HILL PROSPECT, BROKEN HILL
Impact Minerals Limited (ASX:IPT) is pleased to announce that it will receive $125,000 under
the N.S.W. State Government’s Co-operative Drilling Funding Programme to help fund the
forthcoming drill programme at the Broken Hill Nickel-Copper-PGE Joint Venture Project
located 15 km south of Broken Hill.
The Co-funding initiative, awarded on a dollar-for-dollar basis for direct drilling costs, has
been designed to encourage innovative exploration and prioritised high quality, technically
and economically sound proposals that demonstrated either new exploration concepts or the
application of new exploration technologies.
Impact’s Managing Director, Dr Mike Jones, said “The award of this significant grant by the
New South Wales Government further emphasises the highly prospective nature of the
Broken Hill Project. The funds will go towards our drill programme at the Red Hill Prospect
where we have defined four priority drill targets with very significant and high grade rock
chip and soil sampling results.
“In today’s climate where every exploration dollar counts, the award of these funds is a
credit to our COO, Leo Horn, who successfully secured this funding” said Dr Jones.
Impact is earning an 80% interest in the nickel-copper-PGE rights to the project from Golden
Cross Resources Ltd.
The host ultramafic intrusive unit at Red Hill, which outcrops over an area of about
500 sq metres, has a nickel-rich core and copper-precious metal-rich margins (Figure 1 and
announcement dated 21 May 2014). This is a common feature in many major nickel-copperprecious metal sulphide deposits around the world.
The centre of the unit is marked by nickel-in-soil values greater than 10,000 ppb and up to
16,100 ppb nickel (MMI digest) that is 100 m wide and 300 m long. This is a priority area for
drilling.
Both the western and, in particular, the eastern margins of the unit are marked by copperin-soil results greater than 2,500 ppb and up to 16,200 ppb copper (MMI digest) that are up to
200 m wide and 600 m long (Figure 1).
26 Richardson Street West Perth Western Australia 6003
Tel +61 (8) 6454 6666 Facsimile +61 (8) 6454 6667
Email info@impactminerals.com.au www.impactminerals.com.au
Figure 1. Geology and Soil and Rock Chip Results from the Red Hill Prospect.
Within these margins there are a further three priority areas for follow up work that contain
greater than 20 ppb platinum+palladium+gold-in-soil results (fire assay) covering several
hundred square metres and which contain rock chip samples with high grade nickel, copper
and precious metal assays (Figure1):
1. At the Red Hill Shaft, mined to a depth of about 40 m in the early 1900’s, grab samples
from outcrops around the shaft returned up to 16 g/t platinum, 12.1 g/t palladium,
4.2% nickel, 7.7% copper, 1.3 g/t gold and 221 g/t silver. Rock chip samples from a
surface excavation about 50 m long located 100 m to the south of the shaft returned
up to 1 g/t platinum, 2.6 g/t palladium, 0.9% nickel, 0.8% copper, 1.8 g/t gold and
3.3 g/t silver.
2. At Simons Find, rock chip samples returned up to 0.7 g/t platinum, 1.7 g/t palladium,
0.4% nickel, 0.1% copper, 1.9 g/t gold and 6.6 g/t silver.
3. In the south east corner of the intrusion, grab samples from weathered rocks
associated with some surface diggings returned up to 22% copper, 0.2% nickel, 0.8 g/t
gold and 91.1 g/t silver.
The soil geochemistry survey was completed by Impact at a spacing of 50 m by 50 m and
submitted for analysis by the MMI partial digest (nickel and copper) and fire assay (platinum,
palladium, gold and silver) (see Table 1).
Next Steps
Follow up detailed mapping at scales of 1:500 and 1:1000 as well as further rock chip
sampling have recently been completed at Red Hill. The results of this work will be
integrated with geophysical data to define specific drill targets. The drilling is scheduled to
commence in the last Quarter of 2014 subject to statutory approvals. The documentation for
the approvals has been lodged with the relevant government department.
Update on Commonwealth Drill Programme
Impact’s maiden drill programme at Commonwealth was completed last week. A significant
number of assay results are expected this week with further results to come over the
following few weeks.
Dr Michael G Jones
Managing Director
The review of exploration activities and results contained in this report is based on information compiled by Dr Mike Jones,
a Member of the Australian Institute of Geoscientists. He is a director of the company and works for Impact Minerals
Limited. He has sufficient experience which is relevant to the style of mineralisation and types of deposits under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 edition of
the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code). Mike
Jones has consented to the inclusion in the report of the matters based on his information in the form and context in which
it appears.
APPENDIX 1 - SECTION 1 SAMPLING TECHNIQUES AND DATA
Criteria
Sampling techniques
Drilling techniques
Drill sample recovery
Logging
JORC Code explanation
Commentary
Nature and quality of sampling (e.g. cut channels, random chips, or specific
specialised industry standard measurement tools appropriate to the minerals
under investigation, such as down hole gamma sondes, or handheld XRF
instruments, etc). These examples should not be taken as limiting the broad
meaning of sampling.
Random rock samples were taken at surface which represented favourable geology and alteration to known
mineralisation in the region. Samples are variably weathered.
Soil samples were taken at 50 m intervals from a hole 15-20 deep and sieved to -2mm to collect about 250 g of
material.
Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used
Representative rock chip samples at each sample site weigh between 0.8 and 1.2 kg. Soil samples are taken at a
consistent depth below surface and sieved.
Aspects of the determination of mineralisation that are Material to the Public
Report. In cases where ‘industry standard’ work has been done this would be
relatively simple (e.g. ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may be required, such as where there is
coarse gold that has inherent sampling problems. Unusual commodities or
mineralisation types (e.g. submarine nodules) may warrant disclosure of
detailed information
Rock samples were sent to Intertek Adelaide where they were crushed, dried and pulverised (total prep) to
produce a 25-30 g sub-sample for analysis by four acid digest with an ICP/AES finish for ore grade base metal
samples and lead collection fire assay with AAS finish for gold and precious metals. Weathered samples
contained gossanous sulphide material. Soil samples were sent to SGS Perth for analysis by the MMI digest.
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details (e.g. core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc).
No drilling results are reported.
Method of recording and assessing core and chip sample recoveries and results
assessed
No drilling results are reported.
Measures taken to maximise sample recovery and ensure representative nature
of the samples
No drilling results are reported.
Whether a relationship exists between sample recovery and grade and whether
sample bias may have occurred due to preferential loss/gain of fine/coarse
material.
No drilling results are reported.
Whether core and chip samples have been geologically and geotechnically
logged to a level of detail to support appropriate Mineral Resource estimation,
mining studies and metallurgical studies.
No drilling results are reported.
Whether logging is qualitative or quantitative in nature. Core (or costean,
channel, etc) photography.
No drilling results are reported.
The total length and percentage of the relevant intersections logged
No drilling results are reported.
Criteria
Sub-sampling techniques and
sample preparation
Quality of assay data and
laboratory tests
Verification of sampling and
assaying
Location of data points
JORC Code explanation
Commentary
If core, whether cut or sawn and whether quarter, half or all core taken.
No drilling results are reported.
If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled
wet or dry.
No drilling results are reported.
For all sample types, the nature, quality and appropriateness of the sample
preparation technique.
The sample preparation techniques follow industry best practice.
Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
Laboratory QC procedures for rock sample assays involve the use of internal certified reference material as
assay standards, along with blanks, duplicates and replicates.
Measures taken to ensure that the sampling is representative of the in situ
material collected, including for instance results for field duplicate/second-half
sampling.
Field duplicates were taken at selected sample sites.
Whether sample sizes are appropriate to the grain size of the material being
sampled.
This is not relevant to soil and rock chip results.
The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total.
Industry standard assay techniques were used.
For geophysical tools, spectrometers, handheld XRF instruments, etc, the
parameters used in determining the analysis including instrument make and
model, reading times, calibrations factors applied and their derivation, etc.
No geophysical tools were used to determine material element concentrations.
Nature of quality control procedures adopted (e.g. standards, blanks, duplicates,
external laboratory checks) and whether acceptable levels of accuracy (i.e. lack
of bias) and precision have been established.
For the rock chips, quality control procedures for assays were followed via internal laboratory protocols.
Accuracy and precision are within acceptable limits.
The verification of significant intersections by either independent or alternative
company personnel.
The results have not been verified by independent or alternative companies. This is not required at this stage of
exploration.
The use of twinned holes.
No drilling results are reported.
Documentation of primary data, data entry procedures, data verification, data
storage (physical and electronic) protocols.
Primary assay data for rock chips has been entered into standard Excel templates for plotting in Mapinfo.
Discuss any adjustment to assay data.
There are no adjustments to the assay data.
Accuracy and quality of surveys used to locate drillholes (collar and down-hole
surveys), trenches, mine workings and other locations used in Mineral Resource
estimation.
Specification of the grid system used.
Sample locations were located by hand held GPS.
The grid system for Broken Hill is MGA_GDA94, Zone 54.
Criteria
JORC Code explanation
Commentary
Quality and adequacy of topographic control.
Standard government topographic maps have been used for topographic validation. The DGPS is considered
sufficiently accurate for elevation data.
Data spacing for reporting of Exploration Results.
Sample spacing for the soil survey was on a 50 m by 50 m grid.
Whether the data spacing and distribution is sufficient to establish the degree of
geological and grade continuity appropriate for the Mineral Resource and Ore
Reserve estimation procedure(s) and classifications applied.
Estimations of grade and tonnes have not yet been made.
Whether sample compositing has been applied.
Sample compositing has not been applied.
Whether the orientation of sampling achieves unbiased sampling of possible
structures and the extent to which this is known, considering the deposit type.
Not relevant to soil and rock chip results.
If the relationship between the drilling orientation and the orientation of key
mineralised structures is considered to have introduced a sampling bias, this
should be assessed and reported if material.
Not relevant to soil and rock chip results.
Sample security
The measures taken to ensure sample security.
Chain of custody is managed by Impact Minerals Ltd. Samples for Broken Hill are delivered by Impact Minerals
Ltd by courier who transports them to the laboratory for prep and assay. Whilst in storage, they are kept in a
locked yard. Tracking sheets have been set up to track the progress of batches of samples.
Audits or reviews
The results of any audits or reviews of sampling techniques and data.
At this stage of exploration a review of the sampling techniques and data by an external party is not warranted.
Data spacing and distribution
Orientation of data in relation to
geological structure
SECTION 2 REPORTING OF EXPLORATION RESULTS
Criteria
JORC Code explanation
Commentary
Type, reference name/number, location and ownership including agreements or
material issues with third parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites, wilderness or national park and
environmental settings.
The Broken Hill Project currently comprises 1 exploration licences covering 100 km2. The tenement is held 100%
by Golden Cross Resources Ltd. Impact Minerals Limited is earning 80% of the nickel-copper-PGE rights in the
licence from Golden Cross. No aboriginal sites or places have been declared or recorded over the licence area.
There are no national parks over the license area.
The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area.
The tenement is in good standing with no known impediments.
Exploration done by other parties
Acknowledgment and appraisal of exploration by other parties.
There has been no significant previous work at this prospect.
Geology
Deposit type, geological setting and style of mineralisation.
Nickel-copper-PGE sulphide mineralisation associated with an ultramafic intrusion.
Drill hole Information
A summary of all information material to the understanding of the exploration
results including a tabulation of the following information for all Material drill
holes:
easting and northing of the drill hole collar
elevation or RL (Reduced Level – elevation above sea level in metres)
of the drill hole collar
dip and azimuth of the hole
down hole length and interception depth
hole length.
No drilling results are reported.
Mineral tenement and land
tenure status
Data aggregation methods
Relationship between
mineralisation widths and
intercept lengths
In reporting Exploration Results, weighting averaging techniques, maximum
and/or minimum grade truncations (e.g. cutting of high grades) and cut-off
grades are usually Material and should be stated.
Where aggregate intercepts incorporate short lengths of high grade results and
longer lengths of low grade results, the procedure used for such aggregation
should be stated and some typical examples of such aggregations should be
shown in detail.
This is not relevant.
The assumptions used for any reporting of metal equivalent values should be
clearly stated.
No metal equivalents have been reported.
These relationships are particularly important in the reporting of Exploration
Results.
If the geometry of the mineralisation with respect to the drill hole angle is
known, its nature should be reported.
If it is not known and only the down hole lengths are reported, there should be
a clear statement to this effect (e.g. ‘down hole length, true width not known’).
Historical drill holes to date have been sub-perpendicular to the mineralised trend and stratigraphy so intervals
are close to true width or otherwise stated.
Criteria
Diagrams
Balanced reporting
JORC Code explanation
Commentary
Appropriate maps and sections (with scales) and tabulations of intercepts
should be included for any significant discovery being reported These should
include, but not be limited to a plan view of drill hole collar locations and
appropriate sectional views.
Refer to Figures in body of text.
Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration Results.
All results reported are representative
Other substantive exploration
data
Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical survey
results; geochemical survey results; bulk samples – size and method of
treatment; metallurgical test results; bulk density, groundwater, geotechnical
and rock characteristics; potential deleterious or contaminating substances.
Further work
The nature and scale of planned further work (e.g. tests for lateral extensions or
depth extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of possible extensions, including the
main geological interpretations and future drilling areas, provided this
information is not commercially sensitive
Assessment of other substantive exploration data is not yet complete however considered immaterial at this
stage.
Follow up work programmes will be subject to interpretation of recent and historic results which is ongoing.