DEPTH POTENTIAL AND NEW TARGETS REVEALED AT
THE COMMONWEALTH DEPOSIT
At least three south plunging ore shoots identified in drill assay data and
new down hole EM data.
All three shoots are undrilled at depth and open, in particular below a
previous Impact drill intercept of:
4 m at 41.8 g/t (1.3 ounces per tonne) gold, 93 g/t silver (3 ounces per tonne),
5.5% zinc and 2.3% lead.
Gravity data directly detects known high grade massive sulphide
mineralisation at Main Shaft and identifies possible depth extension.
Gravity data also identifies three new nearby targets for massive sulphide
mineralisation.
Potential for significant expansion of the Inferred Resource of 100,000 gold
equivalent ounces.*
Ongoing interpretation of new gravity and IP data over Silica Hill, Doughnut
and Welcome Jack in progress with encouraging results.
Planning in progress for major drill campaign for this Quarter.
* For details on the Inferred Resource and the calculation of the gold equivalent ounces please see page 6 of this report.
New work at Impact Minerals Limited’s (ASX:IPT) 100% owned Commonwealth gold-silver-zinc-leadcopper project 95 km north of Orange in New South Wales has revealed both the potential to significantly
increase the size of known resource at the Commonwealth deposit and identified several new nearby
targets for similar deposits of high grade massive sulphide.
This new potential has been identified from a review and synthesis of data from drill hole assays, two
down-hole electromagnetic (EM) surveys and a ground gravity survey, with the new targets to be tested as
part of an extensive drill programme to be undertaken this Quarter.
26 Richardson Street West Perth Western Australia 6005
Tel +61 (8) 6454 6666 Facsimile +61 (8) 6454 6667
Email info@impactminerals.com.au www.impactminerals.com.au
Three Ore Shoots with High Grade Drill Assays that are Open at Depth
New tree dimensional modelling of the drill hole assay data indicate that there are potentially at least three
ore shoots within the Commonwealth deposit that have a previously unrecognised plunge to the south: one
at Main Shaft and two at Commonwealth South (Figure 1). The down-plunge extensions of these shoots
have not been drilled.
At Main Shaft the mineralisation occurs as massive sulphides that contain gold and silver together with
zinc, lead and iron sulphides (sphalerite, galena and pyrite) and lesser copper sulphide (chalcopyrite).
The drill assay and down hole EM data indicate that the mineralisation is open to the south in particular
beneath Hole CMIPT021 that returned an intercept of 8.1 m at 6 g/t gold, 193 g/t silver, 5.9% zinc and
2.3% lead (see announcement 19 February 2015).
Figure 1. 3D View looking to the north west of the Commonwealth resource (grey outline) and showing:
grade shells for gold (yellow = 1g/t, red/orange = 2 g/t) and copper (green = 500 ppm copper) from drill
assay data; interpreted EM conductors (blue rectangles) and interpreted ore shoots (dashed lines). The
down plunge extensions of these shoots have not been drilled and are priority drill targets.
In the two shoots at Commonwealth South, the majority of the mineralisation occurs as veins and
disseminations of gold and silver-rich zinc and lead sulphides. However, Impact, in its maiden drill
programme at the project, discovered what could be the edges of two new separate lenses of massive and
semi-massive sulphide at the edge of the deposit. These two lenses also help define the two ore shoots
(Figure 1 and see announcement 22 September 2014).
In the southern most ore shoot, Hole CMIPT017 returned a very high grade intercept at the edge of the
deposit of:
4 m at 41.8 g/t (1.3 ounces per tonne) gold, 93 g/t silver (3 ounces per tonne),
5.5% zinc and 2.3% lead from 90 metres down hole.
A down hole EM survey identified a modest small conductor located just south of this intercept within the
interpreted southern shoot and this is a drill target (Figure 1).
In the central shoot, Hole CMIPT014 returned two high-grade drill intercepts in massive sulphide of:
2 m at 6.7 g/t Au, 61.6 g/t Ag, 3.8% Zn, 3.2% Pb from 53 metres; and
4 m at 6.0 g/t Au, 25 g/t Ag, 1.4% Zn, 0.3% Pb from 72 metres down hole.
This was the first significant discovery of two massive sulphide lenses at Commonwealth and they
occur immediately above and below a prominent unit of rhyolite. Prior to this massive sulphide
mineralisation had only been found above the rhyolite. The mineralisation is open at depth (Figure 1).
All three shoots will be tested in the upcoming drill programme.
Further Depth Potential and New Targets for Massive Sulphide Identified in Ground Gravity Data
Massive sulphide bodies, such as at Main Shaft, are commonly very dense and are ideally suited for
exploration by the gravity method which measures the relative density of rocks.
Accordingly a ground gravity survey covering an area of about 3 square kilometres has been completed
over the Commonwealth deposit and surrounding areas at a station spacing of 200 metres by 25 metres or
50 metres.
At Commonwealth, detailed geophysical modelling and density measurements taken by Impact on
mineralised core show that the gravity survey has successfully directly detected the massive sulphide
mineralisation at Main Shaft (Figures 2 and 3).
Figure 2. Image of ground gravity data over the Commonwealth resource and immediate surrounding
area with warmer colours indicating areas underlain by more dense rocks. There is a coincidence of the
gravity anomaly with the massive sulphide mineralisation at Main Shaft at the northern end of the
resource. Three other areas of similar density have also been identified.
This information has been used to calibrate the gravity data to identify bodies of similar density. From
this, four new targets for massive sulphide mineralisation have been identified in and around the
Commonwealth resource (Figures 2 and 3):
1. 150 metres east of the Commonwealth deposit;
2. At depth below Commonwealth South. Modelling of the gravity data suggests a moderately dense
body may be present down to at least 250 m below surface in an area not tested below 100 metres
below surface;
3. 250 metres south west of the Commonwealth deposit; and
4. 400 metres west of the Commonwealth deposit.
The first three targets will be tested in the upcoming drill programme. Further work is required at the
fourth target to determine its significance.
Figure 3. 3D view looking north west of the gravity data following a mathematical inversion process that
identifies bodies of similar density. The colours represent shells or surfaces of the same density with the
smaller more dense shells shown in the purple-pink colour and slightly less dense larger shells in the
burgundy red colour. The Commonwealth deposit as shown in figure 1 is shown for reference. Note the
coincidence of a dense body with the massive sulphide mineralisation at Main Shaft and bodies of similar
density that are targets for drilling.
Next Steps
An interpretation of ground gravity data, induced polarisation data and soil geochemistry data is in
progress at the Silica Hill, Doughnut and Welcome Jack Prospects. Initial indications are that further drill
targets will be identified.
A programme of up to 3,000 metres of Reverse Circulation (RC) and diamond drilling and scheduled to
start within the next 6 to 8 weeks. This will test a significant number of targets within these four
prospects.
In addition, given the success of gravity data in identifying the massive sulphide mineralisation at Main
Shaft, a further ground gravity survey is underway that will extend coverage to about 8 square kilometres
centred on the Commonwealth deposit.
About the Commonwealth Mineral Resource Estimate
The Inferred Resource at Commonwealth, prepared in accordance with the JORC 2012 Code by
independent resource consultants Optiro at a 0.5 g/t gold cut off, is:
720,000 tonnes at 4.5 g/t gold equivalent for a contained 110,000 gold equivalent ounces
comprising 2.8 g/t gold, 48 g/t silver, 1.5% zinc, 0.6% lead and 0.1% copper.
The resource, which is open along trend and at depth, contains both massive sulphide mineralisation at
the Main Shaft prospect and disseminated, vein and lesser massive sulphide mineralization at the
Commonwealth South prospect. It extends from surface to an average depth of 90 m, has a strike
length of 400 m and is up to 25 m thick.
A separate Inferred Mineral Resource (included within the overall resource) has also been calculated
for the massive sulphide lens at Main Shaft alone to demonstrate the high grade nature of such
deposits that are the principal target for Impact’s exploration programme. The Main Shaft Inferred
Resource is:
145,000 tonnes at 9.3 g/t gold equivalent for a contained 47,000 gold equivalent ounces
comprising 4.3 g/t gold, 142 g/t silver, 4.8% zinc, 1.7% lead and 0.2% copper.
The Commonwealth deposit comprises two areas, Main Shaft and Commonwealth South. The
mineralisation at Main Shaft is typical of a volcanogenic massive sulphide (VMS) type system,
containing high grade gold, silver, zinc, lead and copper mineralisation which occurs at the upper
contact of a rhyolite unit with the overlying volcanic sedimentary rocks. Mineralisation at
Commonwealth South occurs at both the upper and lower contacts of the rhyolite and is dominated by
1-50 mm thick stringers and disseminations of sulphide, often associated with intense brecciation and
faulting of the rhyolite.
The Commonwealth Resource strike length is 400 m and it is open along trend in particular to the
south. The mineralisation has been defined to a maximum depth of 150 m and is still open.
Twenty one new holes were drilled by Impact in 2014. The total number of holes into the
Commonwealth project is 108, comprising 49 reverse circulation (RC) holes, 45 diamond holes,
10 underground channel samples and four underground drill holes. Of these holes, 52 intersected the
mineralisation wireframe and were used in the estimation. Although some of the holes are from
previous explorers, Impact has twinned some of the higher grade intersections and these have largely
confirmed the grades and widths.
Quality control measures employed during Impact’s drill programme included the use of certified
standards (1% of total sample population), field duplicates (2% of total sample population) and blanks
(2% of total sample population). No previous quality assurance/quality control (QAQC) has been
carried out at the Commonwealth Project. Analysis of the standards and blanks showed acceptable to
good levels of accuracy in the assaying and little contamination. The duplicate samples matched the
originals with a high degree of precision.
The drill hole database was reviewed and validated by Optiro. Three-dimensional solid wireframes
were constructed from sectional interpretations of the mineralisation using a nominal 0.5 g/t gold
cut-off grade. Drill hole intercepts were composited downhole to 1 m lengths and gold, silver, copper,
zinc, lead and arsenic grade estimation was carried out using ordinary kriging with hard boundaries.
Three search passes, with increasing search distances and decreasing minimum sample numbers, were
employed to fully inform the model. Less than 1% of blocks were not filled in the first three passes.
Further estimation passes were run to assign mean grades to un-estimated blocks.
The Commonwealth Mineral Resource estimate has been classified as an Inferred Mineral Resource in
accordance with the guidelines of the Australasian Code for the Reporting of Exploration Results,
Mineral Resources and Ore Reserves (the JORC Code, 2012). Mineral Resources have been classified
on the basis of confidence in geological and grade continuity, geological modelling confidence, grade
continuity and limited QAQC. No Measured or Indicated Mineral Resources have been defined.
The Mineral Resource estimate for the Commonwealth Project has been reported above a 0.5 ppm
gold cut-off grade. The estimate has been depleted for previous historic mining. Grades have been
reported as individual elements (gold, silver, zinc, lead and copper) and, in addition, a gold-equivalent
grade has been defined. This has used the following Australian dollar commodity prices:
Gold $1588/ oz; Silver $19.55/ oz; Copper $2.87/lb; Lead $1.03/lb; Zinc $1.10/lb.
There has been no metallurgical testing of the Commonwealth mineralisation to date so no
metallurgical recoveries have been incorporated into the gold equivalent calculation. This is
commensurate with the classification of the Commonwealth prospect as an Inferred Mineral Resource.
Investment by Squadron Resources Pty Limited
The Commonwealth gold-silver-zinc-lead project and also Impact’s Broken Hill platinum-copper-nickel
project are part of the investment agreement between Impact Minerals and Squadron Resources Pty Ltd,
part of the Minderoo Group which represents the philanthropic and business interests of Andrew and
Nicola Forrest (see announcement 17 July 2015).
As part of the investment agreement, Squadron at its sole discretion, can invest a further A$1 million into
either or both of the projects to earn a 19.9% interest after Impact has spent a combined total of
$2.5 million on them.
It is anticipated that Impact will meet the $2.5 million expenditure target in the September Quarter 2016.
Dr Michael G Jones
Managing Director
The review of exploration activities and results contained in this report is based on information compiled by Dr Mike Jones, a Member
of the Australian Institute of Geoscientists. He is a director of the company and works for Impact Minerals Limited. He has sufficient
experience which is relevant to the style of mineralisation and types of deposits under consideration and to the activity which he is
undertaking to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves (the JORC Code). Mike Jones has consented to the inclusion in the report of the matters
based on his information in the form and context in which it appears.
APPENDIX 1 - SECTION 1 SAMPLING TECHNIQUES AND DATA
Criteria
JORC Code explanation
Commentary
Nature and quality of sampling (e.g. cut channels, random chips,
or specific specialised industry standard measurement tools
appropriate to the minerals under investigation, such as down
hole gamma sondes, or handheld XRF instruments, etc). These
examples should not be taken as limiting the broad meaning of
sampling.
Rock chip samples
Random grab samples were taken at surface which represented favourable geology and alteration to known mineralisation in the
region. Samples are variably weathered.
Soil Samples
About 250g of soil was taken from 15-20cm below surface and sieved to - 2mm size. Samples put in plastic snap seal bags.
Samples were subsequently sieved to -250 micron at SGS Laboratories for assay by aqua regia digest.
RC Drilling
Reverse Circulation (RC) percussion drilling was used to produce a 1m bulk sample (~25kg) which was collected in plastic bags and
representative 1m split samples (12.5%, or nominally 3kg) were collected using a riffle splitter and placed in a calico bag. The
cyclone was cleaned out with compressed air at the end of each hole and periodically during the drilling. Holes were drilled to
optimally intercept interpreted mineralised zones.
Diamond Drilling
Diamond drilling was used to produce drill core either with a diameter of 63.5 mm (HQ) or 47.6 mm (NQ).
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used
Rock chip samples
Representative samples at each sample site weigh between 0.8 and 1.2 kg. Sample sites were chosen due to historic rock and soil
assay results and the geophysical surveys conducted on the Commonwealth Project. Historic rock sample methods are unknown
but are considered immaterial.
Soil Samples and Drill Samples
Sample representivity was ensured by a combination of Company Procedures regarding quality control (QC) and quality assurance
/ testing (QA).
Examples of QC include (but are not limited to), daily workplace and equipment inspections, as well as drilling and sampling
procedures.
Examples of QA include (but are not limited to) collection of “field duplicates”, the use of certified standards and blank samples
approximately every 50 samples
Sampling techniques
Criteria
Drilling techniques
Drill sample recovery
JORC Code explanation
Commentary
Aspects of the determination of mineralisation that are Material
to the Public Report. In cases where ‘industry standard’ work has
been done this would be relatively simple (e.g. ‘reverse circulation
drilling was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other cases
more explanation may be required, such as where there is coarse
gold that has inherent sampling problems. Unusual commodities
or mineralisation types (e.g. submarine nodules) may warrant
disclosure of detailed information
Rock chip samples
Rock samples were sent to SGS Perth where they were crushed, dried and pulverised (total prep) to produce a 25-30 g subsamples for analysis initially by Aqua Regia digest with ICP-MS finish for base metals then by four acid digest with an ICP/AES
finish for ore grade base metal samples and lead collection fire assay with AAS finish for gold.
Soil Samples
Soil samples were sent to ACME Laboratories in Vancouver for analysis by aqua regia digest or to SGS Laboratories in Perth for
analysis by the MMI digest.
RC and diamond drill samples
RC samples and cut samples of core were submitted to ALS in Orange, NSW. Laboratory sample preparation involved: sample
crushed to 70% less than 2mm, riffle/rotary split off 1 kg, pulverise split to >85% passing 75 microns.
RC samples analysed by MEICP41 or MEOG46 for ore grade samples, aqua regia digest with ICP OES analysis and AA24 fire assay
with AAS finish.
Historical diamond and RC samples were sent to Fox Anamet, Brookvale NSW where gold was determined by fire assay, base
metals by DCP and AAS methods.
Weathered samples contained gossanous sulphide material and fresh samples containing visible pyrite, galena, sphalerite and
chalcopyrite.
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary
air blast, auger, Bangka, sonic, etc) and details (e.g. core
diameter, triple or standard tube, depth of diamond tails, facesampling bit or other type, whether core is oriented and if so, by
what method, etc).
Diamond drilling accounts for about 50 % of the drilling and comprises NQ (47.6 mm diameter) and HQ (63.5 mm diameter) sized
core. Impact diamond core is triple tube and is oriented. Historical diamond core was not oriented.
RC drilling accounts for about 50% of the drilling and comprises 4 inch hammer.
Method of recording and assessing core and chip sample
recoveries and results assessed
Diamond core recoveries for all holes are logged and recorded. Recoveries are estimated to be approximately >97% for the
Commonwealth Project. No significant core loss or sample recovery problems are observed in the drill core or historic reports. RC
samples were visually checked for recovery, moisture and contamination.
Diamond core is reconstructed into continuous runs on an angle iron cradle for orientation marking. Depths are checked against
the depth given on the core blocks and rod counts are routinely carried out by the driller.
Measures taken to maximise sample recovery and ensure
representative nature of the samples
Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
The RC samples are collected by plastic bag directly from the rig-mounted cyclone and laid directly on the ground in rows of 10.
The drill cyclone and sample buckets are cleaned between rod-changes and after each hole to minimise down-hole and/or cross
contamination.
No sample bias has been established.
Criteria
JORC Code explanation
Logging
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
Commentary
Geological logging of samples followed company and industry common practice. Qualitative logging of samples included (but not
limited to); lithology, mineralogy, alteration, veining and weathering. Diamond core logging included additional fields such as
structure and geotechnical parameters.
Magnetic Susceptibility measurements were taken for each 1m RC sample and each 1m diamond core interval.
For diamond core, information on structure type, dip, dip direction, texture, shape and fill material has been recorded in the logs.
RQD data has been recorded on selected diamond holes. Handheld XRF analysis was completed at 50 cm and 1 m intervals on
diamond core and for every metre for RC samples.
All logging is quantitative, based on visual field estimates. Systematic photography of the diamond core in the wet and dry form
was completed.
Chip trays with representative 1m RC samples were collected and photographed then stored for future reference.
All diamond drill holes were logged in full.
The total length and percentage of the relevant intersections
logged
All RC chips samples were geologically logged by Impact’s on-site geologist on a 1m basis, with digital capture in the field.
Detailed diamond core logging, with digital capture was conducted for 100% of the core by Impact’s on-site geologist.
Sub-sampling
techniques and
sample preparation
If core, whether cut or sawn and whether quarter, half or all core
taken.
All core samples were sampled by half core. Selected intervals of quarter core will be selected for check assays if required.
If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
RC samples were split using a riffle splitter.
For all sample types, the nature, quality and appropriateness of
the sample preparation technique.
Company procedures were followed to ensure sub-sampling adequacy and consistency. These included (but were not limited to),
daily work place inspections of sampling equipment and practices, as well as sub-sample duplicates (“field duplicates”).
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Laboratory QC procedures for rock sample assays involve the use of internal certified reference material as assay standards, along
with blanks, duplicates and replicates.
The QC procedure for historical diamond and RC samples is unknown but is assumed to have been minimal; however, the impact
of historical samples has been somewhat mitigated by recent drilling.
Measures taken to ensure that the sampling is representative of
the in situ material collected, including for instance results for
field duplicate/second-half sampling.
Sample duplicates from the historical drilling were taken from selected intervals and compared to the original assay. Quarter core
was taken for diamond samples and riffle resplits for RC samples.
Whether sample sizes are appropriate to the grain size of the
material being sampled.
The samples sizes at Commonwealth are considered appropriate since gold has been identified as predominantly fine-grained by
thin section analysis which would indicate the nugget effect is minimal.
Criteria
Quality of assay data
and laboratory tests
JORC Code explanation
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
For geophysical tools, spectrometers, handheld XRF instruments,
etc, the parameters used in determining the analysis including
instrument make and model, reading times, calibrations factors
applied and their derivation, etc.
Commentary
An industry standard fire assay technique for samples using lead collection with an Atomic Absorption Spectrometry (AAS) finish
was used for gold and aqua regia digest for base metals and silver.
The quality of historical drill sample assays is unknown; however it is reasonable to assume that core samples were
representative of the mineralisation.
No geophysical tools were used to determine material element concentrations. A handheld XRF was used for qualitative analysis
only.
For the rock chips, quality control procedures for assays were followed via internal laboratory protocols. Accuracy and precision
are within acceptable limits.
Nature of quality control procedures adopted (e.g. standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of bias) and precision have
been established.
Reference standards and blanks are routinely inserted into every batch of samples at a rate of 1 in every 25 samples in the Impact
drilling. Impact’s inserted standards in general showed results within expected ranges. The calculated means for Lab standards
are very close to expected for the majority of standards and are within industry expectations.
Laboratoy repeat checks and original samples correlated very well.
There is minimal quality control of historical drill sample assays. Twin holes have been drilled to verify historical drilling.
The QAQC results indicate that the assays used for resource estimation are a fair representation of the material that has been
sampled.
Verification of
sampling and assaying
Location of data
points
The verification of significant intersections by either independent
or alternative company personnel.
Significant intersections from drilling have not been verified by independent or alternative companies or by Impact.
The use of twinned holes.
Two twin diamond holes versus historic RC holes have been drilled at Commonwealth South and Main Shaft.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Primary assay data for rock chips has been entered into standard Excel templates for plotting in Mapinfo and Target. All historical
drill data has been entered digitally by previous explorers and verified internally by Impact.
Discuss any adjustment to assay data.
No significant adjustments have been required.
Accuracy and quality of surveys used to locate drillholes (collar
and down-hole surveys), trenches, mine workings and other
locations used in Mineral Resource estimation.
Specification of the grid system used.
Recent drill holes have been located by DGPS. Historical drill holes and mine shafts have been verified by DGPS.
The grid system for Commonwealth is MGA_GDA94, Zone 55.
Criteria
JORC Code explanation
Commentary
Standard government topographic maps have been used for topographic validation. The DGPS is considered sufficiently accurate
for elevation data.
Quality and adequacy of topographic control.
For the diamond holes, down-hole single shot surveys were conducted by the drilling contractor. Surveys were conducted at 6m,
18, 30m and then approximately every 30m down-hole.
For the RC drill holes, downhole dip surveys were taken at approximately 30m intervals and at the bottom of the hole.
Data spacing and
distribution
Data spacing for reporting of Exploration Results.
Drill spacing of drill holes ranges between 10 and 30 m which is considered adequate for Exploration Results.
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied.
Spacing of drill holes ranges between 10 m and 50 m on section and are considered adequate for Mineral Resource estimation
procedures.
Whether sample compositing has been applied.
Sample compositing has been applied for quoting drill composite results only.
Whether the orientation of sampling achieves unbiased sampling
of possible structures and the extent to which this is known,
considering the deposit type.
Drilling is oriented sub-perpendicular to the mineralised trend and stratigraphic contacts as determined by field data and cross
section interpretation.
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to have
introduced a sampling bias, this should be assessed and reported
if material.
No significant sample bias has been identified from drilling due to the optimum drill orientation described above. Where present,
sample bias will be reported.
Sample security
The measures taken to ensure sample security.
For rock samples, chain of custody is managed by Impact Minerals Ltd. Samples for Commonwealth are delivered by Impact
Minerals Ltd personnel to ALS in Orange, NSW or to SGS Perth for prep and assay. Whilst in storage, they are kept in a locked
yard. Tracking sheets have been set up to track the progress of batches of samples.
Security of historic drill samples is unknown however is considered immaterial.
Audits or reviews
The results of any audits or reviews of sampling techniques and
data.
A review of the sampling techniques and data both of historic drill holes and of Impact’s procedures has been completed by
Optiro Consultants of Perth, WA.
Orientation of data in
relation to geological
structure
SECTION 2 REPORTING OF EXPLORATION RESULTS
Criteria
JORC Code explanation
Commentary
Mineral
tenement
and
land
tenure
status
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settin