ASX ANNOUNCEMENT
Date: 15 July 2022
EXPLORATION UPDATE: ARKUN-BEAU-JUMBO
•
•
•
•
Airborne EM survey, soil geochemistry surveys, field checking and rock chip sampling
completed at priority targets for Ni-Cu-PGE.
Extensive time spent completing Land Access Negotiations across the project area.
Assay results for Doonia and Hopetoun due by the end of July.
Ongoing compilation of previous exploration work on other projects.
Significant progress has been made over the past months across a number of Impact Minerals Limited’s
(ASX:IPT) portfolio of early-stage exploration projects for a range of critical and battery metals in the
emerging mineral province of south west Western Australia (Figure 1).
The portfolio has been assembled by Impact over the past 18 months as part of a strategic change in focus
of the company following the discovery of the world class Julimar deposit just north of Perth by Chalice
Mining Limited (ASX:CHN) (Figure 1). This has been done in tandem with the ongoing rationalisation of
the Company’s projects in Eastern Australia, including a major joint venture on part of the Broken Hill
Project with IGO Limited (ASX:IGO) (ASX Announcement 9th November 2021).
On-ground exploration programmes in Western Australia have been focussed on the Arkun-Beau-Jumbo
Projects centred about 150 km south east of Perth and which has included a significant amount of time
completing initial land access negotiations. In addition, synthesis and interpretation of previous
exploration work is underway on other projects including Narryer, Dalgaranga and other projects
(Figure 1).
Assay results from various rock chip and soil geochemistry programmes are starting to be received and
interpreted. Assay results from two drill holes at Doonia have been received and are being interpreted,
with the assays from the remaining four other holes at Doonia, as well as the final assays from the
diamond drill programme at Hopetoun, due shortly.
BEAU-ARKUN-JUMBO
Previous reconnaissance geophysical and soil geochemistry surveys by Impact across the Arkun-BeauJumbo Project areas, which collectively cover about 2,380 km2, identified a significant number of areas
for follow up work for a wide range of commodity metals including nickel-copper-PGE; Lithium
pegmatites, Rare Earth Elements and Rubidium (ASX announcements 8th March 2022, 27th October 2021,
21st September 2021).
26 Richardson Street West Perth Western Australia 6005
Tel +61 (8) 6454 6666 Facsimile +61 (8) 6454 6667
Email info@impactminerals.com.au www.impactminerals.com.au
Figure 1. Location of Impact’s projects in Western Australia.
The following work has recently been completed across the Arkun-Beau-Jumbo Project areas:
1. An extensive airborne HELITEM electromagnetic and magnetic survey comprising 920 line
kilometres was completed in 7 blocks covering the priority soil geochemistry targets identified at
Beau and Arkun (Figures 2 and 3). Final survey data has now been received and further
processing and interpretation of the data is underway with results expected later this Quarter.
2. Extensive time has been spent completing Land Access Agreements with landowners through the
Beau and Arkun areas. A total of 22 agreements have been signed which cover the majority of the
Ni-Cu-PGE targets in the northern part of the project area and negotiations are underway for the
remaining targets in the southern part of the area. In general there has been a very good response
from landowners in allowing exploration to commence.
3. As a result of the Land Access Agreements, Impact has been able to complete several campaigns
of field checking, soil geochemistry and rock chip sampling across some of the priority targets for
Ni-Cu-PGE. A total of 949 soil samples and 171 rock chip samples have been collected and
submitted for assay. First results are due by the end of July.
4. Reconnaissance field checking and rock chip sampling has been completed along the main access
road at Jumbo to follow up first pass soil geochemistry results. These samples have also been
submitted for assay.
This work will allow further refinement of areas of interest for follow up work which will include drilling.
Access is limited in some places until later in the year when the harvest season is completed. There is still
significant follow up work to be done on the other targets and this is a priority for Impact over the next
two Quarters.
DOONIA AND HOPETOUN
Drill programmes at Doonia and Hopetoun were completed earlier this year. Drill assays have been
considerably delayed but results are due by the end of July.
Soil geochemistry surveys have been completed at both projects to help define follow up drill targets.
Assays results from these surveys are also due by the end of July.
OTHER PROJECTS
Compilation, synthesis and interpretation of previous exploration data has been on-going for Impact’s
other projects in Western Australia. This includes the joint venture projects at Narryer and Dalgaranga
(ASX Announcement 8th December 2022) as well as the 100% owned Dinninup, Mineral Hill and Martup
Projects that were recent additions to the company’s portfolio (ASX Announcement 22nd April 2022).
Figure 2. Location of airborne HELITEM survey areas, soil geochemistry surveys and rock chip
samples recently completed by Impact.
Figure 3. Airborne EM survey blocks (in red) over previous roadside soil geochemistry anomalies for NiCu -PGM, Li-Cs-Ta, REE and Rb (additive Z scores: see ASX Releases 8th March 2022, 27th October
2021 and 21st September 2021 for details).
COMPLIANCE STATEMENT
This report contains no new Exploration Results.
Dr Mike Jones
Managing Director
Competent Person’s Statement
The review of exploration activities and results contained in this report is based on information compiled by Dr Mike Jones, a Member
of the Australian Institute of Geoscientists. He is a director of the company and works for Impact Minerals Limited. He has sufficient
experience which is relevant to the style of mineralisation and types of deposits under consideration and to the activity which he is
undertaking to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves (the JORC Code). Mike Jones has consented to the inclusion in the report of the matters
based on his information in the form and context in which it appears.