MARCH 2026
QUARTERLY ACTIVITIES REPORT
HIGHLIGHTS
1. Lake Hope High Purity Alumina (HPA) Project, WA (IPT 80%):
• Engineering studies underway under the CRC-P project with ECU and CPC Engineering to design
and build a pilot plant for SOP crystallisation as a byproduct to HPA production.
• New standalone development pathway identified to produce sulphate of potash (SOP) and
hydrochloric acid (HCl) as primary products from lake clays with high recoveries.
• Reconnaissance drilling at the Salmon Gums Project identified significant sulphate clay deposits
with an Exploration Target of 3.8-4.3 million tonnes containing 1.4-1.7 million tonnes of
contained sulphate of potash.
Investors should note that the potential size and grade of the clay deposits at Kumarl are conceptual
in nature. Insufficient work has been done to produce a JORC 2012-compliant Mineral Resource
Estimate, and it remains uncertain whether further exploration will lead to the estimation of a
Mineral Resource.
• Salmon Gums project tenements staked covering lakes near potential markets. Scoping Study
commenced to evaluate technical and commercial viability.
2. Alluminous, WA (IPT 50%)
• Operational milestone achieved with approximately 15kg of HiPurA® High Purity Alumina shipped
to US battery materials partner Charge CCCV LLC (C4V) for testing.
• Perth pilot plant operating successfully in batch mode with transition to continuous operation in
progress.
3. Commonwealth Project, NSW (IPT 100%)
• Joint venture partner Kuniko Limited completed Phase 1 diamond drilling programme of 1,239
metres with all six drill holes intersecting mineralisation.
• Significant results include 3.7m of massive sulphide within 47.3m of disseminated and stringer
sulphides at Commonwealth Main (hole CMKNI001), and a further 2.9m of massive sulphide
within 41.9m of disseminated and rein mineralisation in CMKNI002.
CORPORATE ANNOUNCEMENT 30th
APRIL 2026
2 | P a g e A S X A N N O U N C E M E N T
• New offset sulphide zone discovered at Silica Hill comprising a broad 70m visual zone including a
0.5m massive sulphide vein (CMKNI004), located approximately 100m outside the previously
mineralisation and below a fault. The new zone remains open up-dip, down-dip and along strike.
Assay results expected in April 2026.
• MobileMT™ airborne geophysical survey identified 4km-long conductive corridor.
4. Broken Hill Project, NSW (IPT 100%)
• Acquired 100% interest in EL804 covering 55 sq km of the Huonville gold district, expanding
Impact’s ground holding to approximately 1,640 sq km in the region. Historic workings show
strong gold assays up to 82 g/t.
• Magneto-telluric (MT) survey identified a significant near-surface conductive targets potentially
linked to deep-seated structures, including a conductive corridor extending from approximately
20 km depth toward the surface adjacent to the Redan Fault.
• Three near-surface conductive zones (T1, T2, T3) identified, with follow-up survey over T3
completed and final results pending ahead of drill targeting.
PROJECT REPORTS
1. LAKE HOPE HIGH PURITY ALUMINA HPA PROJECT, WA (IPT 80%)
Lake Hope HPA
Significant progress continues to be made with feasibility studies and test work for the Lake Hope HPA
process at Edith Cowan University under the CRC-P federal government grant program (ASX Release 22nd
Oct
24).
Following the successful integration of membrane technology at bench scale for the crystallisation of potash,
engineering studies are now underway to scale up to a pilot plant for this stage of the process. Potash from
the HPA process is a valuable byproduct credit of the Stage 1 leaching of the Lake Hope clays (ASX Release
20th
March 2026 and Pre-Feasibility Study).
Test work has now commenced on Stage 2 hydrochloric acid leaching, where the focus is on recycling of the
acid. A novel method of removing iron from the acid has also been identified and studies are underway to
assess its commerciality.
New Potash and Hydrochloric Acid Opportunity
During the Quarter, a significant new development pathway was identified to produce sulphate of potash
(SOP) and hydrochloric acid (HCl) as primary products from lake clays, operating separately from and
complementing the Lake Hope HPA process (ASX Release 6th
February 2026).
Metallurgical test work has demonstrated high recoveries of sulphate (>94%) from salt calcination of lake
clays, along with strong chlorine extraction (>98%), which can be captured to produce potash and
hydrochloric acid respectively. The process does not rely on evaporation ponds, sidestepping major technical
issues that impacted earlier Australian SOP projects.
Market Opportunity
Australia currently imports all of its SOP requirements, with market enquiries indicating prices of imported
SOP in Western Australia generally range from A$800 to A$1,200 per tonne. SOP is a premium fertiliser
product valued for its high sulphur content and low chloride levels, particularly important for chloride-
sensitive crops.
3 | P a g e A S X A N N O U N C E M E N T
Hydrochloric acid is an essential industrial reagent in Western Australia, used in gold processing, chemical
manufacturing and emerging clay-hosted rare-earth projects. Local supply remains constrained, with
delivered prices generally ranging from A$650 to over A$1,000 per tonne depending on location.
Salmon Gums Project Exploration Results
Following recognition of the new process, lakes in the region around Salmon Gums were identified as
suitable feedstock for the potash/acid flowsheet, closer to potential markets in the Wheatbelt and Goldfields
of Western Australia. These lakes are now covered by tenements owned by the joint venture (Impact 80%,
Playa One 20%), collectively referred to as the Salmon Gums project. (Figure 1)
Reconnaissance exploration drilling in tenement E63/2318 within the Salmon Gums Project identified two
small lakes containing substantial sulphate clay deposits. High-grade sulphate clays, containing up to 20%
sulphate and 5% potassium (K₂O), were encountered at Wishy Lake and Bane Lake.
A total of 58 drill holes were completed using auger and push tube drilling methods, revealing relatively
uniform sheets of dense sulphate minerals ranging in thickness from 0.5 metres to 2 metres. Initial assays
show high-quality sulphate clays with average grades of over 20% alumina (Al₂O₃), 5% potassium (K₂O), and
20% sulphate (SO₃) (ASX Release 20th
March 2026).
An Exploration Target of 3.8 to 4.3 million tonnes of sulphate clay containing between 1.4 and 1.7 million
tonnes of contained sulphate of potash have been defined within the two lakes.
Investors should note that the potential size and grade of the clay deposits at Kumarl are conceptual in
nature. Insufficient work has been done to produce a JORC 2012-compliant Mineral Resource Estimate, and it
remains uncertain whether further exploration will lead to the estimation of a Mineral Resource.
Initial field observations from other lakes within the Salmon Gums project, along with excess clays from the
Lake Hope deposit, suggest the area probably contains a much larger amount of sulphate clays that could
potentially support a long-term mining operation for potash and hydrochloric acid.
Figure 1. Location of the Lake Hope and Salmon Gums projects.
4 | P a g e A S X A N N O U N C E M E N T
Next Steps
A Scoping Study is underway to provide initial estimates of capital and operating costs, confirm product
specifications, and assess development scale and phasing options. The potash/acid opportunity could be
developed either as a standalone operation or alongside the Lake Hope HPA Project, potentially benefiting
from shared infrastructure and regional synergies. Results from the next phase of test work are expected in
Q3 2026.
2. ALLUMINOUS (IPT 50%)
Impact holds a 50% interest in Alluminous Pty Ltd, which is developing the HiPurA® High Purity Alumina
(HPA) technology and has established a Technology Development Agreement with US battery materials
innovator Charge CCCV LLC (C4V) (ASX Release 20th
February 2026).
Operational Milestone – First HPA Shipment
During the Quarter, Alluminous achieved a significant operational milestone by successfully preparing and
shipping approximately 15kg of HiPurA® HPA samples to C4V in the United States for initial testwork under
the Agreement (Figure 2). This shipment marks the first significant quantities of HPA to be produced and
dispatched from the Alluminous pilot plant, just 9 months after Impact's investment in the technology.
The material is being sent for formal testing within C4V's established laboratory and pilot-scale facilities in
New York State, advancing Alluminous' product qualification process towards downstream battery markets.
C4V is located at the Centre of Excellence at Binghamton University, a global hub for lithium-ion research
driven partly by Distinguished Professor M. Stanley Whittingham, who was awarded the 2019 Nobel Prize in
Chemistry for his role in developing lithium-ion batteries.
Figure 2. Bags of HPA proudly held by the Alluminous Technical Team.
Pilot Plant Progress
The Alluminous pilot plant in Perth is now operating successfully in batch mode, producing HPA and
precursor materials in accordance with internal quality specifications. A key performance indicator for the
next 3 to 6 months is to achieve continuous mode operation, which will support sustained sample
production and more robust qualification activities with C4V and potential customers. Initial assessment
indicates the existing facility may be capable of substantial increases in throughput compared with the
original design.
Management and Market Engagement
Alluminous appointed Peter Barnes as Chief Operating Officer during the quarter. Peter is a Chemical
Engineer with an MBA from UWA and extensive experience in scaling up operations from pilot plant through
5 | P a g e A S X A N N O U N C E M E N T
feasibility and commercialisation. He will oversee ongoing pilot plant optimisation, manage the scoping study
process, and plan execution of project scale-up.
Managing Director David Leavy undertook meetings with investors, strategic advisors and industry
participants in New York, Washington DC and San Francisco, presenting Alluminous' commercialisation
pathway and discussing the role of high-purity alumina across battery, AI, data centre, defence,
semiconductor, optics and photonics markets. Attendance at SPIE Photonics West in January in San Francisco
allowed engagement with customers, technology partners and suppliers.
3. COMMONWEALTH PROJECT (IPT 100%)
Location and Ownership
The Commonwealth Project comprises 565 km² in the northern part of the Lachlan Fold Belt in New
South Wales, about 100 km north of Orange (Figure 3). Impact Minerals holds 100% of the project, with
Kuniko Limited (ASX:KNI) earning up to a 70% interest under an Earn-In and Joint Venture Agreement
announced in September 2025. (ASX Release 3rd
October 2025)
6 | P a g e A S X A N N O U N C E M E N T
Figure 3. Location and geology of the Commonwealth and Galwadgere Projects, Lachlan fold belt, NSW.
Impact's work defined JORC (2012) Inferred Mineral Resources at Commonwealth and Silica Hill totalling
88,800 ounces of contained gold and 3,300,000 ounces of contained silver, including significant zinc and
lead credits. These resources are within approximately 250 metres of surface and remain open at depth
and along strike (ASX Release 22nd
August 2019).
During the Quarter Kuniko continued to advance the project rapidly, completing a substantial work
programme:
• MobileMT™ airborne electromagnetic survey covering approximately 328 line-km, identifying a
roughly 4km-long conductive corridor extending from Commonwealth Mine towards Silica Hill and
continuing to nearby prospects.
7 | P a g e A S X A N N O U N C E M E N T
• Completed initial soil geochemistry surveys and reconnaissance rock-chip sampling at the
Geenobby and Gladstone West targets, with 420 soil samples and 5 rock-chip samples in the first
campaign. Subsequent rock-chip result of 6.02 g/t Au and 28.7 g/t Ag (with elevated Bi-Te-Mo)
were reported, extending the mineralised trend to the north.
• Commenced a diamond drilling programme of approximately 1,200 metres in late February 2026,
testing down-plunge and along-strike extensions to known mineralisation at Commonwealth Main,
Silica Hill and Commonwealth South, as well as priority geophysical targets. The Phase 1
programme was completed in March 2026 with a total of six diamond holes for 1,239m.
The MobileMT™ survey results are consistent with and materially advance the geological framework
developed by Impact through previous drilling, geophysics and geochemical programs. Three-dimensional
resistivity modelling has imaged continuous lithological and structural controls to depths exceeding 1km,
with multiple conductive and resistive features interpreted as prospective for extensions to known gold-
silver mineralisation and potential new sulphide accumulations.
Commonwealth is recognised as a high sulphidation, gold-rich volcanogenic massive sulphide (VMS)
deposit, a deposit style only recognised in the past 25 years, with striking similarities to the world-class
Eskay Creek VMS Deposit in Canada (total resources/reserves of 10 million ounces of gold and over 300
million ounces silver). Importantly, copper values increase at depth in parts of the system, highlighting
potential for a deeper porphyry copper-gold source beneath the high-sulphidation VMS mineralisation.
Phase 1 Drilling Results
All six diamond holes intersected visible sulphide mineralisation extending the existing resources and,
representing a strong start to Kuniko's maiden drill programme. Key results by target area are
summarised below:
Commonwealth Main Shaft:
• Hole CMKNI001 intersected 3.7m of massive sulphide within a broader disseminated and stringer
sulphide interval of 47.3m. This hole was drilled as a down-plunge step-out to the existing massive
sulphide zone, which remains open at depth and along plunge.
• Hole CMKNI002 intersected a further 2.9m of massive sulphide within a broader disseminated and
stringer sulphide interval of 41.9m, confirming continuity of the Main Shaft massive sulphide lens.
This hole represents a significant step-out from the previously reported mineralisation, with
mineralisation remaining open at depth.
Silica Hill:
• Hole CMKNI003 intersected approximately 60m of disseminated and stringer sulphide
mineralisation, including visible silver sulphosalts, highlighting strong mineralised continuity. This
hole was completed as a resource extenison.
• Hole CMKNI004 discovered significant sulphide mineralisation comprising a broad 70m visual zone
of disseminated and stringer sulphides, including a 0.5m massive sulphide vein. The intersection
lies approximately 100m outside the previously modelled mineralisation wireframe and below a
fault. The fault is interpreted as a reverse fault that has uplighted the known mineralisation. As a
result, the new mineralised zone remains open up-dip, down-dip and along strike.
8 | P a g e A S X A N N O U N C E M E N T
• A massive sulphide vein 50cm wide comprises approximately 85% pyrite, arsenopyrite and
proustite (silver mineral), hosted within sheared rhyolite porphyry. This represents the deepest
drilling completed to date at Silica Hill, highlighting significant untested potential at depth and
along strike. Historical drilling in the vicinity has returned significant intercepts, including 41m at
2 g/t Au and 147 g/t Ag in CMIPT046 and 22.5m at 1.7 g/t Au and 276 g/t Ag (including 0.3m at
4,200 g/t Ag) in CMIPT077, highlighting the high-grade tenor of the system.
Commonwealth South:
• Hole CMKNI005 intersected approximately 30m of disseminated sulphides and stringer veins
hosted within rhyolite porphyry and the footwall sequence, outside existing identified
mineralisation. A deeper IP target was also tested; however, the anomaly is interpreted to be
related to black shale units, which are known to produce strong IP responses.
• Hole CMKNI006 intersected approximately 33m of similar-style disseminated and stringer sulphide
mineralisation, and was drilled down-dip of historical hole CMIPT017 (7m @ 25 g/t Au, 62 g/t Ag,
2.8% Zn and 1.6% Pb), also outside existing identified mineralisation.
All drill core has now been cut and dispatched for assay. First results were reported last week and were
inline with expectations (ASX Release 22nd
2026). Other results are expected in May 2026. The
successful completion of the Phase 1 programme, with all holes intersecting mineralisation including
significant massive sulphide intervals and the discovery of a new mineralised zone at Silica Hill, has
positioned Kuniko to accelerate planning for a larger Phase II drilling campaign. Kuniko completed a
strongly supported $3.75 million placement during the Quarter to fund Phase II drilling and
advancement of the growing pipeline of high-priority district-scale targets identified across the project
area.
Joint Venture Terms
Under the Earn-In and Joint Venture Agreement, Kuniko can earn 51% by spending $1.5 million within
two years and increase to 70% by spending a further $1.5 million within the following two years. Impact
retains a 30% free-carried interest to Decision to Mine, at which point Impact may elect to contribute or
dilute to 10% and receive a 2% Net Smelter Royalty (NSR).
9 | P a g e A S X A N N O U N C E M E N T
Figure 4. Oblique view looking south west showing the current Silica Hill Mineralisation Block Model and
drillhole CMKNI004. A new zone of mineralisation is highlighted in purple and is located below a fault,
suggesting it is a fault offset of the Silica Hill mineralisation. The new zone is about 100m outside the
previously modelled mineralisation wireframe, defining a mineralised zone that remains open up- and
down-dip and along strike.
4. BROKEN HILL (IPT 100%)
Huonville Gold District Acquisition
During the Quarter, Impact acquired a 100% interest in a 55 sq km tenement (EL8024) from private company
Sozo Resources Pty Ltd, covering most of the historic Huonville gold district, 25km southeast of Broken Hill,
New South Wales. The tenement is contiguous with Impact's existing ground holding, which now extends
over approximately 1,800 sq km and almost surrounds the giant Broken Hill lead-zinc-silver deposit (ASX
Release 23rd
January 2026).
The Huonville goldfield covers roughly 8km by 8km, with small-scale gold mining occurring between 1931
and 1935. Numerous shallow workings have returned strong gold assays in legacy rock chip samples of up to
82 g/t gold, 21 g/t silver, 0.4% bismuth and 0.26% copper with lesser molybdenum and tungsten. The metal
association is characteristic of iron-oxide-copper-gold (IOCG) deposits. (Figure 5)
Previous mapping identified two steeply dipping major structural trends, oriented WSW-ENE and NNE-SSW,
covering approximately 10km in total length. Gold mineralisation is associated with pyrite in massive, non-
10 | P a g e A S X A N N O U N C E M E N T
laminated, relatively undeformed quartz veins located within major through-going shear zones, suggesting
late-stage emplacement consistent with the timing of gold mineralisation elsewhere in the region.
Figure 5: Image of total magnetic intensity from regional data showing the Broken Hill orebody (Line of
Lode), EL8024 Huonville, the new tenement acquired, and Impact’s licences.
Also shown are the extensive copper occurrences throughout the Broken Hill region.
Key terms of the acquisition, subject to ministerial approval, include $125,000 in Impact shares (held in
escrow for six months), $25,000 cash, and a 1% Net Smelter Royalty (NSR) payable to a previous owner of
the tenement.
Magneto-Telluric Survey Results
During the Quarter, a single-line magneto-telluric (MT) ground geophysical survey identified several
significant near-surface conductive targets that may be linked to deep-seated structures within Impact's
Broken Hill project. The conductors are situated within the central part of Impact's extensive ground holdings
surrounding the world-class Broken Hill silver-lead-zinc deposit, which contains over 500 million tonnes of
massive sulphide mineralisation.
The MT survey covered approximately 30 km across the geology along a single line coinciding with seismic
reflection lines conducted by Geoscience Australia in 1994 and 2001. In addition, Impact reinterpreted
regional MT data from the national AUSLAMP (Australian Lithospheric Architecture Magnetotelluric Project)
grid.
11 | P a g e A S X A N N O U N C E M E N T
Key findings from the survey include:
• A significant steeply dipping conductive zone appears to connect a deeper conductor in the regional
AUSLAMP data (at approximately 20 km depth) to a near-surface anomaly (T3). This conductive
corridor is adjacent to the Redan Fault, interpreted as a crustal-scale structure, and comes to surface
within a favourable basement embayment beneath the Willyama Supergroup, host to the Broken Hill
orebody.
Figure 2. Image of a depth slice at 20 km below surface of the regional AUSLAMP MT data at Broken Hill. The
K1 conductor is an obvious feature in the data. A second conductor is present beneath the Thackeringa area
to the west, close to large (>100Mt) pyrite-cobalt deposits
12 | P a g e A S X A N N O U N C E M E N T
Figure 3. A north-south cross-section through the AUSLAMP data showing the K1 conductor (“conductive
corridor”) adjacent to the Redan Fault with Impact’s tenements. The Willyama Supergroup, which hosts the
massive sulphide deposit at Broken Hill, is resistive (cold colours) and overlies a conductive basement warm
colours). The conductive corridor provides a potential fluid pathway for deep seated fluids to ascend into the
Willyama Supergroup.
• Three near-surface conductive zones have been identified within 1 kilometre of the surface (T1, T2
and T3), with T3 becoming the focus of follow-up work. The conductive zone at T3 surfaces within an
unusual embayment identified in regional magnetic data, interpreted as a sub-basin of the Willyama
Supergroup within basement rocks. This structural and stratigraphic setting makes it a compelling
target for sediment-hosted base-metal mineralisation.
Figure 4. Cross-section of regional AUSLAMP data with Impact’s survey line superimposed and indicating a
connection between deep-seated and near-surface conductors
• A deeper, sub-horizontal conductive zone aligns with the depth of the regional conductor visible in
the AUSLAMP data, supporting the connection between deep and shallow conductors and
suggesting potential lithospheric-scale mineral system architecture.
13 | P a g e A S X A N N O U N C E M E N T
Figure 5. Detailed view of the 2D inversion for the MT survey showing the three conductive
targets (T1, T2 and T3).
A steeply dipping conductive zone at T3 resembles those identified in MT surveys over Iron Oxide-Copper-
Gold (IOCG) deposits in South Australia, including Olympic Dam, where three conductive zones correspond
to three IOCG deposits and are connected to a deeper conductor (Figure 6). Although 3D inversions initially
suggested the conductive zone might be a processing artefact (a phenomenon known with single-line MT
surveys), Impact committed to a ground follow-up survey over T3. While final results are still pending, a
discrete conductor has been clearly identified near the top of the conductive zone, confirming the validity of
the target.
14 | P a g e A S X A N N O U N C E M E N T
Figure 6. A cross-section of a 2D inversion of ground MT data over the Olympic Dam deposit. The top
diagram shows the link between a mid-crustal conductor at about 15 km to 20 km depth and the near-
surface deposits (OD, WW, and VC). The middle diagram offers a detailed view with the so-called “Fingers of
God." The bottom diagram presents seismic data with interpreted cross-cutting features that are spatially
linked to the conductive zones. The 2D inversion of Impact’s MT survey is displayed at the same scale as the
middle diagram.
The results align with a reinterpretation of regional AUSLAMP MT data, supporting a model of deep fluid
pathways capable of producing large mineral systems. The Broken Hill region is currently experiencing a
resurgence in exploration interest, with several companies acquiring significant ground holdings and
establishing joint ventures in the area.
Next Steps
A follow-up MT survey over T3 has been completed with final inversion results pending ahead of drill
targeting. A review of all data from the Huonville tenement is underway to be combined with data from the
recently completed ground magnetotelluric survey. This will be used to prioritise areas for follow-up work
including mapping and additional rock chip sampling, as well as further ground geophysical surveys, to guide
identification of areas for initial drill testing.
15 | P a g e A S X A N N O U N C E M E N T
5. SOUTHERN SKY JOINT VENTURE (IPT 80%)
During the Quarter, work progressed on interpretation of reconnaissance soil geochemistry data at the
Dalgaranga project (E59/2620). Several areas of interest for further work were identified. In line with
Impact’s increasing focus on its salt lake projects, three projects that were part of the joint venture have
been relinquished (Jumbo, Narryer and Peak Hill).
6. CORPORATE
Cash exploration expenditure for the period was $705,000. Corporate and administration expenses
amounted to $464,000. No expenditure was incurred on mining production or development activities during
the quarter. The total amount paid to directors of the entity and their associates in the period (item 6 of
Appendix 5B) was $193,000, including salary, directors’ fees and superannuation.
Cash at March 31st
, 2026 was $1.76 million.
Market Cap: A$24.7m ($0.048 p/s) Issued Capital: 514,409,029
Dr Michael G Jones
Managing Director
16 | P a g e A S X A N N O U N C E M E N T
Competent Persons Statements
The information in this report that relates to Exploration Results is based on, and fairly represents,
information and supporting documentation prepared by Dr Mike Jones Managing Director, Impact Minerals
Limited. Dr Jones is a Member of the Australasian Institute of Geoscientists, and he has sufficient experience
which is relevant to the style of mineralisation and type of deposits under consideration and to the activity
which has been undertaken to qualify as a Competent Person as defined in the 2012 Edition of the
“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (The JORC
Code). Dr Jones consents to the inclusion in this release of the matters based on the information in the form
and context in which they appear.
Forward Looking Statements: This announcement contains ‘forward-looking information’ that is based on
the Company’s expectations, estimates and projections as of the date on which the statements were made.
This forward-looking information includes, among other things, statements with respect to the Company’s
business strategy, plans, development, objectives, performance, outlook, growth, cash flow, projections,
targets and expectations, mineral reserves and resources, results of exploration and related expenses.
Generally, this forward-looking information can be identified by the use of forward-looking terminology
such as ‘outlook’, ‘anticipate’, ‘project’, ‘target’, ‘potential’, ‘likely’, ‘believe’, ‘estimate’, ‘expect’, ‘intend’,
‘may’, ‘would’, ‘could’, ‘should’, ‘scheduled’, ‘will’, ‘plan’, ‘forecast’, ‘evolve’ and similar expressions. Persons
reading this announcement are cautioned that such statements are only predictions, and that the
Company’s actual future results or performance may be materially different. Forward-looking information is
subject to known and unknown risks, uncertainties and other factors that may cause the Company’s actual
results, level of activity, performance or achievements to be materially different from those expressed or
implied by such forward-looking information.
The Company confirms that it is not aware of any new information or data that materially affects the
information included in the original market announcements referred to in the report and, in the case of
estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the
estimates in the original market announcements continue to apply and have not materially changed. The
Company confirms that the form and context in which the competent persons findings were presented have
not been materially modified from the original announcements.
17 | P a g e A S X A N N O U N C E M E N T
Tenement Information by Listing Rule 5.3.3
Project /
Tenement
Location
Status
IPT Interest
at start of
quarter
IPT Interest
at end of
quarter
Commonwealth
New South
Wales
EL5874 Granted 100% 100%
EL8212 Granted 100% 100%
EL8252 Granted 100% 100%
EL8504 Granted 100% 100%
EL8505 Granted 100% 100%
Broken Hill
New South
Wales
EL7390 Granted 100% 100%
EL8234 Granted 100% 100%
EL8434 Granted 100% 100%
EL8435 Granted 100% 100%
EL8636 Granted 100% 100%
EL8674 Granted 100% 100%
EL9037 Granted 100% 100%
EL9115 Granted 100% 100%
EL9294 Granted 100% 100%
EL9384 Granted 100% 100%
EL9761
Partially
Surrendered
100% 100%
EL9794 Granted 100% 100%
EL9830 Granted 100% 100%
EL9832 Granted 100% 100%
EL9854 Granted 100% 100%
Lake Hope
Western
Australia
M63/684 Application 80% 80%
L63/99 Application 80% 80%
E63/2086 Granted 80% 80%
E63/2257 Surrendered 80% 80%
E63/2318 Granted 80% 80%
E63/2319 Granted 80% 80%
E63/2370 Granted 80% 80%
E63/2492 Surrendered 80% 80%
E63/2493 Surrendered 80% 80%
18 | P a g e A S X A N N O U N C E M E N T
Project /
Tenement
Location
Status
IPT Interest
at start of
quarter
IPT Interest
at end of
quarter
E63/2504 Granted 80% 80%